Loading...
HomeMy WebLinkAboutP2186-Traffic-Study-Report-9-29-2022Traffic StudyTraffic StudyTraffic StudyTraffic Study The Middle The Middle The Middle The Middle Proposed MixedProposed MixedProposed MixedProposed Mixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development prepared for: Joe White & Associates, Inc. Rodney Parham Road and and Anderson Drive Little Rock, Arkansas September 29, 2022 Project No.: P-2186 TABLE OF CONTENTS Section Page Introduction 1 The Site 3 Existing Traffic Conditions 6 Trip Generation & Site Traffic Projections 8 Traffic Volume Assignments 10 Capacity and Level of Service 14 Summary of Findings 19 APPENDIX Site Plan Trip Generation Data Vehicle Turning Movement Count Data Capacity and Level of Service Calculations Page 1 Peters & Associates Engineers, Inc., has conducted a traffic en- gineering study relating to an office park development (The Mid- dle) along the south side of Cantrell Road (Highway 10), on the east side of Rodney Parham Road and on the north side of Sys- tematics Road in Little Rock, Arkansas. The main points of ac- cess to serve the site are proposed to be the existing Anderson Drive, Systematics Drive (via Kent Drive) plus a new access drive (Drive A) to serve the site with each of these intersecting Rodney Parham Road in the immediate vicinity of the site. The site is proposed to be a mixed-use development consisting of commercial and office land uses. A copy of the site plan is in included in the Appendix of this report. This is a report of methodology and findings relating to a traffic engineering study undertaken to: • Evaluate existing traffic conditions in the vicinity of the site. • Determine projected traffic volumes entering and exiting the proposed development at the nearby study intersections and the new access drive intersection proposed to serve the site. • Identify the effects on traffic operations for existing traffic in combination with site-generated traffic associated with the development of the site as proposed with 10-year back- ground traffic volume growth at a rate of 3 percent per year for 10 years (per City of Little Rock request). • Evaluate traffic operations for the following conditions: ο Existing traffic conditions. ο Projected full build-out 10-year traffic conditions to include full-build of the site development plus 10-year background traffic volume growth. • Evaluate traffic operations for the study intersections and make recommendations for improvements which may be necessary and appropriate for acceptable traffic operations for the projected traffic conditions. INTRODUCTION Page 2 In the following sections of this traffic study report are traf- fic data, study methods, findings and recommendations. The study is technical in nature. Analysis techniques em- ployed are those most commonly used in the traffic engi- neering profession for traffic impact analysis. Certain data and calculations relative to traffic operational analysis are referenced in the report. Complete calculations and data are included in the Appendix of the report. Page 3 THE SITE The location of The Middle development is within the city limits of Little Rock, Arkansas along the south side of Cantrell Road (Highway 10), on the east side of Rodney Par- ham Road and on the north side of Systematics Road. The site is just west of I-430. The proposed development site location and vicinity are shown on Figures 1 and 2, which follow. The main points of access to serve the site are proposed to be the existing Anderson Drive, Systematics Drive (via Kent Drive) plus a new access drive (Drive A) to serve the site with each of these intersecting Rodney Parham Road in the immediate vicinity of the site. N Figure 1 – Vicinity Map SITE SITE Page 4 The following photos show the general layout of the study intersections of Rodney Parham Road and Anderson Drive and Rodney Parham Road and Systematics Road. Photos were taken at locations as indicated on the captions. Figure 2 – Site Location Map N Rodney Parham Road S I T E S y s t e ma t i c s R o a d Anderson Drive Kent Dr i ve Page 5 Rodney Parham Road and Systematics Road / Access Drive Rodney Parham S y s t e ma ti c s Ro a d N A c c e s s Dr i v e Rodney Parham Road and Anderson Drive / Access Drive R odney Parham R oad Anderson Drive N Ac c e s s Dr i v e Page 6 Traffic count data collected as a part of this study include AM and PM peak hours vehicle turning movement counts at the following intersections: ο Rodney Parham Road and Anderson Drive. ο Rodney Parham Road and Systematics Road. The AM and PM peak hours vehicle turning movement counts made as a part of this study are shown on Figure 3A, "Existing Traffic Volumes - AM Peak Hour,” and Figure 3B, "Existing Traffic Volumes - PM Peak Hour.” The peak hours vehicle turning movement count data for these intersections are presented in more detail in the Appendix of this report. EXISTING TRAFFIC CONDITIONS Page 7 Figure 3A Existing Traffic Volumes AM Peak Hour Figure 3B Existing Traffic Volumes PM Peak Hour N N Page 8 The Trip Generation, an Informational Report, published by the Institute of Transportation Engineers (ITE) and The Trip Generation Manual 10th Edition, 2017, were utilized in cal- culating the magnitude of traffic volumes expected to be generated by the proposed land uses of this development. These are reliable sources for this information and are com- monly used in the traffic engineering profession. Using the selected trip generation rates, calculations were made as a part of this study to provide a reliable estimate of traffic volumes that can be expected to be associated with the proposed development. These calculations entail apply- ing the appropriate trip-generation rates to the land uses proposed or assumed for the development. Results of these calculations are summarized on Table 1, “Summary of Trip- Generation.” These calculations indicate that approximately 4,904 vehicle trips (combined in and out) per average weekday are pro- jected to be generated by the proposed development land uses on this site. Of this total, approximately 302 vehicle trips are estimated during the traffic conditions of the AM peak hour and approximately 425 vehicle trips are estimated during the traffic conditions of the PM peak hour. The data for these land uses for have been adjusted for “internal trip capture” (i.e. multi-purpose trips within the site as opposed to new trips for each site land use) which was calculated using ITE Trip Generation Manual 9th Edition, 2014 (the 10th Edition does not provide internal trip capture information) and a copy of the output is included in the Ap- pendix of this report. TRIP GENERATION and SITE TRAFFIC PROJECTIONS Page 9 Table 1 – Summary of Trip-Generation 24-HOUR TWO-WAY PEAK HOUR PEAK HOUR ASSUMED APPROXIMATE ITE WEEKDAY VOLUME VOLUME LAND USE SIZE CODE VOLUME ENTER EXIT ENTER EXIT Retail Commercial 12,000 Sq. Ft. 820 453 7 4 22 24 Furniture Store 4,700 Sq. Ft. 890 30 1 0 1 1 General Office 35,000 Sq. Ft. 710 341 35 6 6 34 Medical Office 35,000 Sq. Ft. 720 1,218 76 21 34 87 Fast-Casual Restaurant with Drive-Thru 2,500 Sq. Ft. 940 1,198 48 49 23 25 High-Turnover Sit-Down Restaurant 3,000 Sq. Ft. 932 337 16 14 18 11 Bank with Drive-Thru 7,000 Sq. Ft. 912 700 39 28 71 72 Hotel 75 Rooms 310 627 21 14 23 22 4,904 243 136 198 276 -39 -38 -19 -30 204 98 179 246 425TOTAL ENTERING + EXITING *INTERNAL TRIP CAPTURE 302 UNADJUSTED TOTAL DRIVEWAY VOLUMES AM ADJUSTED DRIVEWAY VOLUMES PM Page 10 TRAFFIC VOLUME ASSIGNMENTS Once projected traffic was estimated for the site, directional distributions were made to reflect the percent of anticipated thru, left and right-turns at the study intersections. Directional splits and proposed street assignments at the study intersec- tions were made based on existing traffic patterns, transporta- tion network, and expected regional use. Directional distribu- tion percentages used in this study are shown on Figure 4, “Directional Distribution - Site Traffic.” The directional distribution percentages for site traffic have been equated to percentage turns for each movement at the study intersections. The site-generated traffic volumes result from applying the directional distribution percentages to the corresponding projected site-generated traffic volumes summa- rized on Table 1. There are nearby I-430 and Cantrell Road interchange im- provements by Arkansas Department of Transportation (ARDOT) just north of the site under construction. Projected future traffic volumes were not found on the ARDOT improve- ment plans for this section of Rodney Parham Road. Therefore, it was requested by the City to include 10-years background traffic volume growth at a compounded rate of 3 percent per year for projected volumes included in this study. The site-generated traffic volumes and corresponding existing background traffic volumes shown on Figures 3A and 3B have been combined (plus ten-years background traffic volume growth) and the results are depicted on Figure 5A, “Projected 10-Year Traffic Volumes - AM Peak Hour,” and Figure 5B, “Projected 10-Year Traffic Volumes - PM Peak Hour.” Traffic volumes shown on Figures 3A, 3B, 5A and 5B are the values used in capacity and level of service calculations con- ducted as a part of this study. The effect of existing back- ground traffic (i.e. the adjacent street non-site traffic which exists) and projected traffic associated with the site develop- ment as well as background growth has thus been accounted for in this analysis. Page 11 N Rodney Parham Road S I T E Sy s t e ma t i c s R o a d Anderson Drive Kent Dr i ve Figure 4 Directional Distribution - Site Traffic 5 0 % E X IT 50% ENTER 50% EXIT 5 0 % E N TE R Page 12 Figure 5A Projected 10-Year Traffic Volumes AM Peak Hour N Page 13 N Figure 5B Projected 10-Year Traffic Conditions PM Peak Hour Page 14 CAPACITY and LEVEL OF SERVICE Generally, the "capacity" of a street is a measure of its abil- ity to accommodate a certain magnitude of moving vehicles. It is a rate as opposed to a quantity, measured in terms of vehicles per hour. More specifically, street capacity refers to the maximum number of vehicles that a street element (e.g. an intersection) can be expected to accommodate in a given time period under the prevailing roadway and traffic condi- tions. Traffic operational analysis for the study intersections were evaluated based on the methodologies outlined in the High- way Capacity Manual, 2010 Edition, published by the Trans- portation Research Board. The operating conditions at an intersection are graded by the “level of service” experienced by drivers. Level of service (LOS) describes the quality of traffic operating conditions and is rated from “A” to “F”. LOS “A” represents the most desirable condition with free-flow movement of traffic with minimal delays. LOS “F” generally excessive delays to motorists. Intermediate grades of B, C, D, and E reflect incremental increases in the average delay per stopped vehicle. Delay is measured in seconds per vehi- cle. The table below shows the upper limit of delay associ- ated with each level of service for signalized and un- signalized intersections. Intersection Level of Service Delay Thresholds Level of Service (LOS) Signalized Un-Signalized A < 10 Seconds < 10 Seconds B < 20 Seconds < 15 Seconds C < 35 Seconds < 25 Seconds D < 55 Seconds < 35 Seconds E < 80 Seconds < 50 Seconds F ≥ 80 Seconds ≥ 50 Seconds Page 15 The LOS rating deemed acceptable varies by community, facility type and traffic control device. The study intersec- tions were evaluated using the Synchro analysis software package based on Highway Capacity Manual methods. This computer program has been proven to be reliable when used to analyze capacity and levels of traffic service under various operating conditions. Detailed results for all capacity calculations are included in the Appendix. The adjacent street weekday AM and PM peak traffic periods were used for these calculations. Factors included in the analysis are as follows: • Existing traffic volumes and patterns. • Directional distribution of projected traffic volumes. • Existing and proposed intersection geometry (including elements such as turn lanes, curb radii, etc.). • Existing background traffic volumes and projected site- generated volumes for projected traffic conditions. • 10-year background traffic volume growth. • Existing or proposed traffic control. Page 16 CAPACITY ANALYSIS Level of Service Analysis Results Existing Traffic Conditions Capacity and level of service analysis was performed for ex- isting traffic volumes, lane geometry and traffic control for the AM and PM peak hours for the following study intersec- tions: ο Rodney Parham Road and Anderson Drive. ο Rodney Parham Road and Systematics Road. As indicated in Table 3, “Level of Service Summary – Exist- ing Traffic Conditions,” all vehicle movements at the study intersections currently operate at what calculates as an ac- ceptable LOS “B” or better for existing traffic conditions for the AM and PM peak hours. Traffic volumes and existing lane geometry used for this analysis are shown on Figure 3A, "Existing Traffic Volumes - AM Peak Hour,” and Figure 3B, "Existing Traffic Volumes - PM Peak Hour.” Page 17 Projected 10-Year Traffic Conditions Capacity and LOS analysis was performed for projected traf- fic conditions at initial completion of the proposed develop- ment plus 10-years background traffic volume growth for the AM and PM peak hours for the following intersections: ο Rodney Parham Road and Anderson Drive. ο Rodney Parham Road and Systematics Road. ο Rodney Parham Road and Drive A. Traffic volumes and lane geometry used for projected traffic conditions are shown on Figure 5A, “Projected 10-Year Traf- fic Volumes - AM Peak Hour,” and Figure 5B, “Projected 10- Year Traffic Volumes - PM Peak Hour.” The operating condi- tions projected to exist at the study intersections are sum- marized in Table 4, “Level of Service Summary - Projected 10-Year Traffic Conditions.” As indicated in Table 4, for projected 10-year traffic condi- tions, all vehicle movements at the study intersections are expected to operate at what calculates as an acceptable LOS “D” or better for the AM and PM peak hours. Additionally, the overall LOS at the traffic signal-controlled intersection of Rodney Parham Road and Systematics Drive is expected to operate at LOS “B” for the AM and PM peak hours. For these projected traffic conditions, analysis was con- ducted with existing lane geometry and traffic control at the study intersections plus Drive A assumed to be full- directional and to consist of one inbound lane and one out- bound lane. Page 18 Table 4 - Level of Service Summary - Projected Traffic Conditions Table 3 - Level of Service Summary - Existing Traffic Conditions Southeastbound Left-TurnEastbound ThruEastbound Right-TurnNorthwestbound Left-TurnWestbound ThruWestbound Right-TurnNortheastbound Left-TurnNorthbound ThruNorthbound Right-TurnSouthwest bound Left-TurnSouthbound ThruSouthbound Right-TurnOverall IntersectionINTERSECTION PEAK HRAMA A An/a0.8PMA A An/a1.6AMA B A BA7.9PMA B B BA7.8BBA AAvg. Control Delay Seconds / VehicleAEXISTING TRAFFIC CONDITIONSTraffic ControlPEAK HOUR - LEVEL OF SERVICERodney Parham Road and Anderson DriveABAAASIGNALAATWO-WAY "STOP" SIGNRodney Parham Road and Systematics RoadAAAASoutheastbound Left-TurnEastbound ThruEastbound Right-TurnNorthwestbound Left-TurnWestbound ThruWestbound Right-TurnNortheastbound Left-TurnNorthbound ThruNorthbound Right-TurnSouthwest bound Left-TurnSouthbound ThruSouthbound Right-TurnOverall IntersectionINTERSECTION PEAK HRAMD A Cn/a1.9PMC A An/a3.2AMA C B CB13.6PMA B B BB10.4AMB B A An/a0.9PMB B A An/a1.6ONE-WAY "STOP" SIGNAAA B A AB B ARodney Parham Road and Drive AAA B AAvg. Control Delay Seconds / VehiclePEAK HOUR - LEVEL OF SERVICERodney Parham Road and Anderson DriveTWO-WAY "STOP" SIGNA B ACBRodney Parham Road and Systematics RoadSIGNAL PROJECTED TRAFFIC CONDITIONSTraffic Control Page 19 SUMMARY OF FINDINGS Findings of this study are summarized as follows: • Capacity and level of service analysis was performed for existing traffic volumes, lane geometry and traffic control for the AM and PM peak hours for the study intersections. All vehicle movements at the study intersections currently operate at what calculates as an acceptable LOS “B” or better for existing traffic conditions for the AM and PM peak hours. • For the development as proposed, approximately 4,904 vehicle trips (combined in and out) per average weekday are projected to be generated by the proposed development land uses on this site. Of this total, approximately 302 vehicle trips are estimated during the traffic conditions of the AM peak hour and approximately 425 vehicle trips are estimated during the traffic conditions of the PM peak hour. • Capacity and LOS analysis was performed for projected traffic con- ditions at initial completion of the proposed development plus 10- years background traffic volume growth for the AM and PM peak hours for the study intersections. For projected 10-year traffic con- ditions, all vehicle movements at the study intersections are ex- pected to operate at what calculates as an acceptable LOS “D” or better for the AM and PM peak hours. Additionally, the overall LOS at the traffic signal-controlled intersection of Rodney Parham Road and Systematics Drive is expected to operate at LOS “B” for the AM and PM peak hours. For these projected traffic conditions, analysis was conducted with existing lane geometry and traffic control at the study intersections plus Drive A assumed to be full- directional and to consist of one inbound lane and one outbound lane The conclusion of traffic operational findings associated with this study is that additional traffic expected to be generated by The Middle mixed-use development can be accommodated by the existing adja- cent roadways and study intersections with minimal impact to traffic operations. APPENDIX Site Plan 5$+/,1*&,5&/(68,7($/,77/(52&.$5.$16$63+21(  &,9,/(1*,1((5,1*&2168/7,1*6(59,&(6/$1'6859(<,1*-2(:+,7( $662&,$7(6,1&/21*)2503&'35(/,0,1$5<3/$7*(1(5$/127(6*(1(5$/127(638%/,&:25.6127(6$1$'',7,21727+(&,7<2)/,77/(52&.%(,1*3$57/27%/2&.3/($6$179$//(<2)),&(3$5.$1'3$572)6(&7,21715:38/$6.,&2817<$5.$16$6/27675$&76$ %/(*$/'(6&5,37,21&(57,),&$7(2)35(/,0,1$5<3/$7$33529$/&(57,),&$7(2)2:1(5&(57,),&$7(2)35(/,0,1$5<(1*,1((5,1*$&&85$&<&(57,),&$7(2)35(/,0,1$5<6859(<,1*$&&85$&<)/22',1)250$7,21 Trip-Generation Data ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 12,000 Sq. Ft. Retail Shopping Center (ITE 820) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 4,700 Sq. Ft. Furniture Store (ITE 890) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 35,000 Sq. General Office (ITE 710) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 35,000 Sq. Medical Office (ITE 720) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 2,500 Sq. Ft. Fast Casual Restaurant with Drive-Thru (ITE 940) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street N/A ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 3,000 Sq. Ft. Fast High-Turnover Restaurant (ITE 932) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximately 7,000 Sq. Ft. Bank with Drive-Thru (ITE 912) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street ITE TRIP-GENERATION 10TH EDITION The Middle Approximate 75 Room Hotel (ITE 310) 9/8/2022 P2186 Weekday Daily Volume Weekday AM Peak Hour of Adjacent Street Weekday PM Peak Hour of Adjacent Street Trip Generation Summary - Full Build Project: Alternative: Open Date: Analysis Date: The Middle The Middle 9/8/2022 9/8/2022 ITE Land Use Enter Exit Enter Exit Average Daily Trips Enter Exit TotalTotalTotal AM Peak Hour of Adjacent Street Traffic PM Peak Hour of Adjacent Street Traffic 820 CENTERSHOPPING 1 12 Gross Leasable Area 1000 SF 4523221257512256256 890 STOREFURNITURE 1 4.7 Gross Floor Area 1000 SF 211101241212 710 OFFICEGENERAL 1 35 Gross Floor Area 1000 SF 5243955748386193193 720 OFFICEMEDICAL 1 35 Gross Floor Area 1000 SF 12590358418661265632633 940 DONUTDT 1 2.5 Gross Floor Area 1000 SF 472423974849 932 RESTAURANTHT 1 3 Gross Floor Area 1000 SF 301218321418381190191 912 BANKDRIVEIN 1 7 Gross Floor Area 1000 SF 17085858537481037518519 310 HOTEL 1 75 Rooms 452223401624613306307 Unadjusted Volume 2111 2107 4218 261 145 406 216 300 516 Internal Capture Trips 0 0 0 42 42 84 29 29 58 0 0 0 0 0 0 9 8 17 2111 2107 4218 219 103 322 178 263 441 Pass-By Trips Volume Added to Adjacent Streets Total AM Peak Hour Internal Capture = 21 Percent Total PM Peak Hour Internal Capture = 11 Percent 1TRIP GENERATION 2014, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 Vehicle Turning Movement Count Data Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : AM RP S Site Code : 00000000 Start Date : 08/29/2022 Page No : 1 AM Hour Turning Movement Count Data Rodney Parham Rd & Systematics Rd Little Rock, Arkansas P-2186 Groups Printed- AM Count Data Rodney Parham Road From North Systematics Road From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 0 13 3 0 16 0 1 0 0 1 11 88 6 0 105 0 0 1 0 1 123 07:15 AM 1 16 1 0 18 0 0 0 0 0 8 88 32 0 128 11 0 3 0 14 160 07:30 AM 4 27 5 0 36 0 0 1 0 1 12 89 48 0 149 49 0 9 0 58 244 07:45 AM 0 15 2 0 17 1 0 3 0 4 30 111 6 0 147 4 0 0 0 4 172 Total 5 71 11 0 87 1 1 4 0 6 61 376 92 0 529 64 0 13 0 77 699 08:00 AM 0 15 6 0 21 1 0 3 0 4 25 102 3 0 130 3 0 1 0 4 159 08:15 AM 0 17 7 0 24 2 0 2 1 5 10 110 3 0 123 0 0 0 0 0 152 08:30 AM 0 21 2 0 23 4 0 1 0 5 5 90 0 0 95 0 0 0 0 0 123 08:45 AM 0 20 6 0 26 0 0 2 0 2 4 81 2 0 87 0 0 0 0 0 115 Total 0 73 21 0 94 7 0 8 1 16 44 383 8 0 435 3 0 1 0 4 549 Grand Total 5 144 32 0 181 8 1 12 1 22 105 759 100 0 964 67 0 14 0 81 1248 Apprch % 2.8 79.6 17.7 0.0 36.4 4.5 54.5 4.5 10.9 78.7 10.4 0.0 82.7 0.0 17.3 0.0 Total % 0.4 11.5 2.6 0.0 14.5 0.6 0.1 1.0 0.1 1.8 8.4 60.8 8.0 0.0 77.2 5.4 0.0 1.1 0.0 6.5 Rodney Parham Road Access Drive Systematics Road Rodney Parham Road Right 5 Thru 144 Left 32 Peds 0 InOut Total 781 181 962 Right8 Thru1 Left12 Peds1 OutTotalIn137 22 159 Left 100 Thru 759 Right 105 Peds 0 Out TotalIn 223 964 1187 Left14 Thru0 Right67 Peds0 TotalOutIn106 81 187 8/29/2022 7:00:00 AM 8/29/2022 8:45:00 AM AM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : AM RP S Site Code : 00000000 Start Date : 08/29/2022 Page No : 2 AM Hour Turning Movement Count Data Rodney Parham Rd & Systematics Rd Little Rock, Arkansas P-2186 Rodney Parham Road From North Systematics Road From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersection 07:15 AM Volume 5 73 14 0 92 2 0 7 0 9 75 390 89 0 554 67 0 13 0 80 735 Percent 5.4 79.3 15.2 0.0 22.2 0.0 77.8 0.0 13.5 70.4 16.1 0.0 83.8 0.0 16.3 0.0 07:30 Volume 4 27 5 0 36 0 0 1 0 1 12 89 48 0 149 49 0 9 0 58 244 Peak Factor 0.753 High Int. 07:30 AM 07:45 AM 07:30 AM 07:30 AM Volume 4 27 5 0 36 1 0 3 0 4 12 89 48 0 149 49 0 9 0 58 Peak Factor 0.639 0.563 0.930 0.345 Rodney Parham Road Access Drive Systematics Road Rodney Parham Road Right 5 Thru 73 Left 14 Peds 0 InOut Total 405 92 497 Right2 Thru0 Left7 Peds0 OutTotalIn89 9 98 Left 89 Thru 390 Right 75 Peds 0 Out TotalIn 147 554 701 Left13 Thru0 Right67 Peds0 TotalOutIn94 80 174 8/29/2022 7:15:00 AM 8/29/2022 8:00:00 AM AM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : PM RP S Site Code : 00000000 Start Date : 08/23/2022 Page No : 1 PM Hour Turning Movement Count Data Rodney Parham Rd & Systmatics Rd Little Rock, Arkansas P-2186 Groups Printed- PM Count Data Rodney Parham Road From North Systematics Road From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 0 29 2 0 31 3 0 3 0 6 4 36 2 0 42 3 0 0 0 3 82 04:15 PM 0 32 0 0 32 9 0 2 0 11 3 51 4 0 58 3 0 0 0 3 104 04:30 PM 1 34 1 0 36 9 0 4 0 13 3 45 5 0 53 0 0 1 0 1 103 04:45 PM 0 35 0 0 35 9 0 10 0 19 5 45 8 0 58 3 0 1 0 4 116 Total 1 130 3 0 134 30 0 19 0 49 15 177 19 0 211 9 0 2 0 11 405 05:00 PM 0 37 1 0 38 14 1 11 0 26 4 45 8 0 57 4 0 0 0 4 125 05:15 PM 0 38 0 0 38 6 0 9 0 15 3 68 6 0 77 2 0 1 0 3 133 05:30 PM 0 22 1 0 23 4 0 1 0 5 2 43 5 0 50 2 0 2 0 4 82 05:45 PM 0 17 0 0 17 2 0 2 0 4 4 44 0 0 48 7 0 0 0 7 76 Total 0 114 2 0 116 26 1 23 0 50 13 200 19 0 232 15 0 3 0 18 416 Grand Total 1 244 5 0 250 56 1 42 0 99 28 377 38 0 443 24 0 5 0 29 821 Apprch % 0.4 97.6 2.0 0.0 56.6 1.0 42.4 0.0 6.3 85.1 8.6 0.0 82.8 0.0 17.2 0.0 Total % 0.1 29.7 0.6 0.0 30.5 6.8 0.1 5.1 0.0 12.1 3.4 45.9 4.6 0.0 54.0 2.9 0.0 0.6 0.0 3.5 Rodney Parham Road Access Drive Systematics Road Rodney Parham Road Right 1 Thru 244 Left 5 Peds 0 InOut Total 438 250 688 Right56 Thru1 Left42 Peds0 OutTotalIn33 99 132 Left 38 Thru 377 Right 28 Peds 0 Out TotalIn 310 443 753 Left5 Thru0 Right24 Peds0 TotalOutIn40 29 69 8/23/2022 4:00:00 PM 8/23/2022 5:45:00 PM PM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : PM RP S Site Code : 00000000 Start Date : 08/23/2022 Page No : 2 PM Hour Turning Movement Count Data Rodney Parham Rd & Systmatics Rd Little Rock, Arkansas P-2186 Rodney Parham Road From North Systematics Road From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1 Intersection 04:30 PM Volume 1 144 2 0 147 38 1 34 0 73 15 203 27 0 245 9 0 3 0 12 477 Percent 0.7 98.0 1.4 0.0 52.1 1.4 46.6 0.0 6.1 82.9 11.0 0.0 75.0 0.0 25.0 0.0 05:15 Volume 0 38 0 0 38 6 0 9 0 15 3 68 6 0 77 2 0 1 0 3 133 Peak Factor 0.897 High Int. 05:00 PM 05:00 PM 05:15 PM 04:45 PM Volume 0 37 1 0 38 14 1 11 0 26 3 68 6 0 77 3 0 1 0 4 Peak Factor 0.967 0.702 0.795 0.750 Rodney Parham Road Access Drive Systematics Road Rodney Parham Road Right 1 Thru 144 Left 2 Peds 0 InOut Total 244 147 391 Right38 Thru1 Left34 Peds0 OutTotalIn17 73 90 Left 27 Thru 203 Right 15 Peds 0 Out TotalIn 187 245 432 Left3 Thru0 Right9 Peds0 TotalOutIn29 12 41 8/23/2022 4:30:00 PM 8/23/2022 5:15:00 PM PM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : AM RP A Site Code : 00000000 Start Date : 08/26/2022 Page No : 1 AM Hour Turning Movement Count Data Rodney Parham Rd & Anderson Dr/Access Dr Little Rock, Arkansas P-2186 Groups Printed- AM Count Data Rodney Parham Road From North Anderson Drive From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 2 18 5 0 25 2 0 1 0 3 4 42 0 0 46 0 0 1 0 1 75 07:15 AM 3 22 5 0 30 3 0 0 0 3 1 84 0 0 85 2 0 5 0 7 125 07:30 AM 4 42 3 0 49 2 0 0 0 2 5 105 0 1 111 3 0 11 0 14 176 07:45 AM 2 18 3 0 23 1 0 0 0 1 9 112 3 0 124 4 0 1 0 5 153 Total 11 100 16 0 127 8 0 1 0 9 19 343 3 1 366 9 0 18 0 27 529 08:00 AM 1 16 7 0 24 2 0 0 0 2 11 106 1 0 118 0 0 0 0 0 144 08:15 AM 0 17 6 0 23 3 0 0 0 3 16 95 2 0 113 0 0 0 0 0 139 08:30 AM 0 20 4 0 24 2 0 0 0 2 8 89 1 0 98 2 0 1 0 3 127 08:45 AM 0 19 2 0 21 1 0 0 0 1 8 79 0 0 87 1 0 0 0 1 110 Total 1 72 19 0 92 8 0 0 0 8 43 369 4 0 416 3 0 1 0 4 520 Grand Total 12 172 35 0 219 16 0 1 0 17 62 712 7 1 782 12 0 19 0 31 1049 Apprch % 5.5 78.5 16.0 0.0 94.1 0.0 5.9 0.0 7.9 91.0 0.9 0.1 38.7 0.0 61.3 0.0 Total % 1.1 16.4 3.3 0.0 20.9 1.5 0.0 0.1 0.0 1.6 5.9 67.9 0.7 0.1 74.5 1.1 0.0 1.8 0.0 3.0 Rodney Parham Road Access Drive Anderson Drive Rodney Parham Road Right 12 Thru 172 Left 35 Peds 0 InOut Total 747 219 966 Right16 Thru0 Left1 Peds0 OutTotalIn97 17 114 Left 7 Thru 712 Right 62 Peds 1 Out TotalIn 185 782 967 Left19 Thru0 Right12 Peds0 TotalOutIn19 31 50 8/26/2022 7:00:00 AM 8/26/2022 8:45:00 AM AM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : AM RP A Site Code : 00000000 Start Date : 08/26/2022 Page No : 2 AM Hour Turning Movement Count Data Rodney Parham Rd & Anderson Dr/Access Dr Little Rock, Arkansas P-2186 Rodney Parham Road From North Anderson Drive From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersection 07:30 AM Volume 7 93 19 0 119 8 0 0 0 8 41 418 6 1 466 7 0 12 0 19 612 Percent 5.9 78.2 16.0 0.0 100. 0 0.0 0.0 0.0 8.8 89.7 1.3 0.2 36.8 0.0 63.2 0.0 07:30 Volume 4 42 3 0 49 2 0 0 0 2 5 105 0 1 111 3 0 11 0 14 176 Peak Factor 0.869 High Int. 07:30 AM 08:15 AM 07:45 AM 07:30 AM Volume 4 42 3 0 49 3 0 0 0 3 9 112 3 0 124 3 0 11 0 14 Peak Factor 0.607 0.667 0.940 0.339 Rodney Parham Road Access Drive Anderson Drive Rodney Parham Road Right 7 Thru 93 Left 19 Peds 0 InOut Total 438 119 557 Right8 Thru0 Left0 Peds0 OutTotalIn60 8 68 Left 6 Thru 418 Right 41 Peds 1 Out TotalIn 100 466 566 Left12 Thru0 Right7 Peds0 TotalOutIn13 19 32 8/26/2022 7:30:00 AM 8/26/2022 8:15:00 AM AM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : PM RP A Site Code : 00000000 Start Date : 08/24/2022 Page No : 1 PM Hour Turning Movement Count Data Rodney Parham Rd & Anderson Dr/Access Dr Little Rock, Arkansas P-2186 Groups Printed- PM Count Data Rodney Parham Road From North Anderson Drive From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 0 0 0 0 0 0 1 0 0 1 1 5 0 0 6 0 0 0 0 0 7 04:15 PM 0 27 5 0 32 12 0 4 0 16 1 72 0 0 73 2 0 0 0 2 123 04:30 PM 0 37 1 0 38 8 0 3 1 12 3 66 1 0 70 1 0 3 0 4 124 04:45 PM 0 19 1 0 20 9 1 4 0 14 0 61 1 0 62 0 0 0 0 0 96 Total 0 83 7 0 90 29 2 11 1 43 5 204 2 0 211 3 0 3 0 6 350 05:00 PM 2 28 1 0 31 10 0 6 0 16 0 51 0 0 51 1 0 0 0 1 99 05:15 PM 0 23 0 0 23 4 1 3 0 8 2 55 1 0 58 1 0 1 0 2 91 05:30 PM 1 16 0 0 17 5 0 2 0 7 0 64 0 0 64 0 0 1 0 1 89 05:45 PM 0 15 1 0 16 3 0 1 0 4 0 35 1 0 36 0 0 0 0 0 56 Total 3 82 2 0 87 22 1 12 0 35 2 205 2 0 209 2 0 2 0 4 335 Grand Total 3 165 9 0 177 51 3 23 1 78 7 409 4 0 420 5 0 5 0 10 685 Apprch % 1.7 93.2 5.1 0.0 65.4 3.8 29.5 1.3 1.7 97.4 1.0 0.0 50.0 0.0 50.0 0.0 Total % 0.4 24.1 1.3 0.0 25.8 7.4 0.4 3.4 0.1 11.4 1.0 59.7 0.6 0.0 61.3 0.7 0.0 0.7 0.0 1.5 Rodney Parham Road Access Drive Anderson Drive Rodney Parham Road Right 3 Thru 165 Left 9 Peds 0 InOut Total 465 177 642 Right51 Thru3 Left23 Peds1 OutTotalIn16 78 94 Left 4 Thru 409 Right 7 Peds 0 Out TotalIn 193 420 613 Left5 Thru0 Right5 Peds0 TotalOutIn10 10 20 8/24/2022 4:00:00 PM 8/24/2022 5:45:00 PM PM Count Data North Peters & Associates Engineers, Inc. Peak Hour Turning Movement Count Data File Name : PM RP A Site Code : 00000000 Start Date : 08/24/2022 Page No : 2 PM Hour Turning Movement Count Data Rodney Parham Rd & Anderson Dr/Access Dr Little Rock, Arkansas P-2186 Rodney Parham Road From North Anderson Drive From East Rodney Parham Road From South Access Drive From West Start Time Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Righ t Thru Left Ped s App. Total Int. Total Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1 Intersection 04:15 PM Volume 2 111 8 0 121 39 1 17 1 58 4 250 2 0 256 4 0 3 0 7 442 Percent 1.7 91.7 6.6 0.0 67.2 1.7 29.3 1.7 1.6 97.7 0.8 0.0 57.1 0.0 42.9 0.0 04:30 Volume 0 37 1 0 38 8 0 3 1 12 3 66 1 0 70 1 0 3 0 4 124 Peak Factor 0.891 High Int. 04:30 PM 04:15 PM 04:15 PM 04:30 PM Volume 0 37 1 0 38 12 0 4 0 16 1 72 0 0 73 1 0 3 0 4 Peak Factor 0.796 0.906 0.877 0.438 Rodney Parham Road Access Drive Anderson Drive Rodney Parham Road Right 2 Thru 111 Left 8 Peds 0 InOut Total 292 121 413 Right39 Thru1 Left17 Peds1 OutTotalIn12 58 70 Left 2 Thru 250 Right 4 Peds 0 Out TotalIn 132 256 388 Left3 Thru0 Right4 Peds0 TotalOutIn5 7 12 8/24/2022 4:15:00 PM 8/24/2022 5:00:00 PM PM Count Data North Capacity & Level of Service Calculations P2186 Existing AM 641841A n d ers o n D riv e 0 0 8 1 2 0 7 Rodney Parham Road199378939075Systematics Road7021 3 06 7 14735 P2186 Existing AM Rodney Parham Road at Anderson Drive Page 1 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) 12 0700864184119937 Future Volume (Veh/h) 12 0700864184119937 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 13 08009745445211018 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 443 pX, platoon unblocked 0.95 0.95 0.95 0.95 0.95 0.95 vC, conflicting volume 397 660 54 591 642 250 109 499 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 249 527 54 454 507 93 109 357 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 98 100 99 100 100 99 100 98 cM capacity (veh/h) 630 420 1001 451 431 895 1479 1134 Direction, Lane # SE 1 NW 1 NW 2 NE 1 NE 2 NE 3 SW 1 SW 2 SW 3 Volume Total 21 0 9 7 303 196 21 67 42 Volume Left 13 007002100 Volume Right 8090045008 cSH 733 1700 895 1479 1700 1700 1134 1700 1700 Volume to Capacity 0.03 0.00 0.01 0.00 0.18 0.12 0.02 0.04 0.02 Queue Length 95th (ft)201000100 Control Delay (s) 10.1 0.0 9.1 7.4 0.0 0.0 8.2 0.0 0.0 Lane LOS BAAA A Approach Delay (s) 10.1 9.1 0.1 1.3 Approach LOS B A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 30.2% ICU Level of Service A Analysis Period (min) 15 P2186 Existing AM Rodney Parham Road at Systematics Road Page 1 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (vph) 13 0 67 7 0 2 89 390 75 14 73 5 Future Volume (vph) 13 0 67 7 0 2 89 390 75 14 73 5 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 1 1 0 1 0 2 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 0.97 0.95 0.95 Frt 0.850 0.940 0.976 0.991 Flt Protected 0.950 0.950 0.971 0.950 0.950 Satd. Flow (prot) 0 1770 1583 1681 1615 0 1770 3454 0 3433 3507 0 Flt Permitted 0.950 0.971 0.700 0.950 Satd. Flow (perm) 0 1863 1583 1681 1615 0 1304 3454 0 3433 3507 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 131 131 17 5 Link Speed (mph) 25 25 40 40 Link Distance (ft) 153 265 289 298 Travel Time (s) 4.2 7.2 4.9 5.1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 14 0 73 8 0 2 97 424 82 15 79 5 Shared Lane Traffic (%) 36% Lane Group Flow (vph) 0 14 73 5 5 0 97 506 0 15 84 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 24 24 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 12112 12 12 Detector Template Left Thru Right Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 20 100 20 120 20 120 Trailing Detector (ft)00000 00 00 Detector 1 Position(ft)00000 00 00 Detector 1 Size(ft) 20 6 20 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 114 114 Detector 2 Size(ft)6666 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Split NA Perm NA Prot NA Protected Phases 3 4 4 2 1 6 Permitted Phases 3 3 2 P2186 Existing AM Rodney Parham Road at Systematics Road Page 2 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Detector Phase 33344 22 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 12.0 Minimum Split (s) 32.9 32.9 32.9 32.9 32.9 24.6 24.6 23.3 24.6 Total Split (s) 33.0 33.0 33.0 32.9 32.9 25.8 25.8 23.3 49.1 Total Split (%) 28.7% 28.7% 28.7% 28.6% 28.6% 22.4% 22.4% 20.3% 42.7% Maximum Green (s) 27.1 27.1 27.1 27.0 27.0 20.2 20.2 18.0 43.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.6 3.6 3.5 3.6 All-Red Time (s) 2.4 2.4 2.4 2.4 2.4 2.0 2.0 1.8 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 5.9 5.9 5.9 5.6 5.6 5.3 5.6 Lead/Lag Lag Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None None None None Act Effct Green (s) 7.2 7.2 6.9 6.9 20.0 20.0 6.9 21.2 Actuated g/C Ratio 0.23 0.23 0.22 0.22 0.63 0.63 0.22 0.67 v/c Ratio 0.03 0.16 0.01 0.01 0.12 0.23 0.02 0.04 Control Delay 17.8 2.4 19.0 0.0 9.9 8.1 18.2 5.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 17.8 2.4 19.0 0.0 9.9 8.1 18.2 5.7 LOS BABA AA BA Approach Delay 4.9 9.5 8.4 7.6 Approach LOS AAAA Stops (vph) 15 4 8 0 50 218 15 33 Fuel Used(gal)0000 14 01 CO Emissions (g/hr)9941 59267 1640 NOx Emissions (g/hr)2210 1152 38 VOC Emissions (g/hr)2210 1462 49 Dilemma Vehicles (#)0000 032 06 Queue Length 50th (ft)2010 823 13 Queue Length 95th (ft) 19 11 10 0 59 115 10 16 Internal Link Dist (ft) 73 185 209 218 Turn Bay Length (ft) 150 150 Base Capacity (vph) 1569 1354 1413 1378 951 2525 2382 3301 Starvation Cap Reductn 0000 00 00 Spillback Cap Reductn 0000 00 00 Storage Cap Reductn 0000 00 00 Reduced v/c Ratio 0.01 0.05 0.00 0.00 0.10 0.20 0.01 0.03 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 31.6 Natural Cycle: 115 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.23 Intersection Signal Delay: 7.9 Intersection LOS: A Intersection Capacity Utilization 32.8% ICU Level of Service A P2186 Existing AM Rodney Parham Road at Systematics Road Page 3 Analysis Period (min) 15 Splits and Phases: 6: Systematics Road P2186 Existing PM 22504A n d ers o n D riv e 17 1 39 3 0 4 Rodney Parham Road811122720315Systematics Road341383 0 9 21441 P2186 Existing PM Rodney Parham Road at Anderson Drive Page 1 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) 3 0 4 17 1 39 2 250 4 8 111 2 Future Volume (Veh/h) 3 0 4 17 1 39 2 250 4 8 111 2 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 3 0 4 18 1 42 2 272 4 9 121 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 305 pX, platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99 vC, conflicting volume 322 420 62 360 419 138 123 276 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 305 403 62 343 402 119 123 258 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 99 100 100 97 100 95 100 99 cM capacity (veh/h) 587 527 991 577 528 904 1462 1295 Direction, Lane # SE 1 NW 1 NW 2 NE 1 NE 2 NE 3 SW 1 SW 2 SW 3 Volume Total 7 18 43 2 181 95 9 81 42 Volume Left 3 18 0200900 Volume Right 4 0 42 004002 cSH 765 577 889 1462 1700 1700 1295 1700 1700 Volume to Capacity 0.01 0.03 0.05 0.00 0.11 0.06 0.01 0.05 0.02 Queue Length 95th (ft)124000100 Control Delay (s) 9.7 11.4 9.3 7.5 0.0 0.0 7.8 0.0 0.0 Lane LOS ABAA A Approach Delay (s) 9.7 9.9 0.1 0.5 Approach LOS A A Intersection Summary Average Delay 1.6 Intersection Capacity Utilization 17.0% ICU Level of Service A Analysis Period (min) 15 P2186 Existing PM Rodney Parham Road at Systematics Road Page 1 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (vph) 3 0 9 34 1 38 27 203 15 2 144 1 Future Volume (vph) 3 0 9 34 1 38 27 203 15 2 144 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 100 0 Storage Lanes 0 1 1 0 1 0 2 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 0.97 0.95 0.95 Frt 0.850 0.866 0.990 0.999 Flt Protected 0.950 0.950 0.996 0.950 0.950 Satd. Flow (prot) 0 1770 1583 1681 1526 0 1770 3504 0 3433 3536 0 Flt Permitted 0.950 0.996 0.652 0.950 Satd. Flow (perm) 0 1863 1583 1681 1526 0 1215 3504 0 3433 3536 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 131 41 6 1 Link Speed (mph) 25 25 40 40 Link Distance (ft) 153 265 289 305 Travel Time (s) 4.2 7.2 4.9 5.2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 3 0 10 37 1 41 29 221 16 2 157 1 Shared Lane Traffic (%) 10% Lane Group Flow (vph) 0 3 10 33 46 0 29 237 0 2 158 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 24 24 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 12112 12 12 Detector Template Left Thru Right Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 20 100 20 100 20 100 Trailing Detector (ft)00000 00 00 Detector 1 Position(ft)00000 00 00 Detector 1 Size(ft) 20 6 20 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft)6666 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Split NA Perm NA Prot NA Protected Phases 3 4 4 2 1 6 Permitted Phases 3 3 2 P2186 Existing PM Rodney Parham Road at Systematics Road Page 2 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Detector Phase 33344 22 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 12.0 Minimum Split (s) 32.9 32.9 32.9 32.9 32.9 24.6 24.6 23.3 24.6 Total Split (s) 33.0 33.0 33.0 32.9 32.9 25.8 25.8 23.3 49.1 Total Split (%) 28.7% 28.7% 28.7% 28.6% 28.6% 22.4% 22.4% 20.3% 42.7% Maximum Green (s) 27.1 27.1 27.1 27.0 27.0 20.2 20.2 18.0 43.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.6 3.6 3.5 3.6 All-Red Time (s) 2.4 2.4 2.4 2.4 2.4 2.0 2.0 1.8 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 5.9 5.9 5.9 5.6 5.6 5.3 5.6 Lead/Lag Lag Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None None None None Act Effct Green (s) 7.0 7.0 7.5 7.5 16.9 16.9 7.0 17.9 Actuated g/C Ratio 0.26 0.26 0.28 0.28 0.63 0.63 0.26 0.67 v/c Ratio 0.01 0.02 0.07 0.10 0.04 0.11 0.00 0.07 Control Delay 16.3 0.1 14.3 8.2 10.7 8.1 17.0 5.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 16.3 0.1 14.3 8.2 10.7 8.1 17.0 5.5 LOS BABA BA BA Approach Delay 3.9 10.8 8.3 5.6 Approach LOS ABAA Stops (vph) 6 0 25 17 18 92 4 53 Fuel Used(gal)0000 02 01 CO Emissions (g/hr) 3 1 18 16 20 118 4 69 NOx Emissions (g/hr)1033 423 113 VOC Emissions (g/hr)1044 527 116 Dilemma Vehicles (#)0000 022 013 Queue Length 50th (ft)0010 00 00 Queue Length 95th (ft) 7 0 31 25 25 58 3 29 Internal Link Dist (ft) 73 185 209 225 Turn Bay Length (ft) 150 100 Base Capacity (vph) 1642 1411 1480 1348 984 2839 2701 3394 Starvation Cap Reductn 0000 00 00 Spillback Cap Reductn 0000 00 00 Storage Cap Reductn 0000 00 00 Reduced v/c Ratio 0.00 0.01 0.02 0.03 0.03 0.08 0.00 0.05 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 26.7 Natural Cycle: 115 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.11 Intersection Signal Delay: 7.8 Intersection LOS: A Intersection Capacity Utilization 40.8% ICU Level of Service A P2186 Existing PM Rodney Parham Road at Systematics Road Page 3 Analysis Period (min) 15 Splits and Phases: 6: Systematics Road P2186 Projected AM 8603116A n d ers o n D riv e 12 0 35 1 7 0 9 771479120622105Systematics Road35081 8 09 0 29122761837D riv e A 12 20Rodney Parham Road41221 P2186 Projected AM Rodney Parham Road at Anderson Drive Page 1 Intersection Int Delay, s/veh 1.9 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h 17 0 9 12 0 35 8 603 116 77 147 9 Future Vol, veh/h 17 0 9 12 0 35 8 603 116 77 147 9 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - - 70 - - 70 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 18 0 10 13 0 38 9 655 126 84 160 10 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 679 1132 85 984 1074 391 170 0 0 781 0 0 Stage 1 333 333 - 736 736 ------- Stage 2 346 799 - 248 338 ------- Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 ------- Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 ------- Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 338 202 957 203 218 608 1405 - - 832 - - Stage 1 654 642 - 377 423 ------- Stage 2 643 396 - 734 639 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 291 181 957 185 195 608 1405 - - 832 - - Mov Cap-2 Maneuver 291 181 - 185 195 ------- Stage 1 650 577 - 375 420 ------- Stage 2 599 394 - 653 574 ------- Approach SE NW NE SW HCM Control Delay, s 15.1 15 0.1 3.2 HCM LOS C C Minor Lane/Major Mvmt NEL NET NERNWLn1NWLn2SELn1 SWL SWT SWR Capacity (veh/h) 1405 - - 185 608 383 832 - - HCM Lane V/C Ratio 0.006 - - 0.071 0.063 0.074 0.101 - - HCM Control Delay (s) 7.6 - - 25.9 11.3 15.1 9.8 - - HCM Lane LOS A - - D B C A - - HCM 95th %tile Q(veh) 0 - - 0.2 0.2 0.2 0.3 - - P2186 Projected AM Rodney Parham Road at Drive A Page 1 Intersection Int Delay, s/veh 0.9 Movement NWL NWR NET NER SWL SWT Lane Configurations Traffic Vol, veh/h 12 20 618 37 41 221 Future Vol, veh/h 12 20 618 37 41 221 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 100 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 13 22 672 40 45 240 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 902 356 0 0 712 0 Stage 1 692 ----- Stage 2 210 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 ----- Critical Hdwy Stg 2 5.84 ----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 277 640 - - 884 - Stage 1 458 ----- Stage 2 805 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 263 640 - - 884 - Mov Cap-2 Maneuver 263 ----- Stage 1 458 ----- Stage 2 764 ----- Approach NW NE SW HCM Control Delay, s 14.4 0 1.5 HCM LOS B Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh/h) - - 416 884 - HCM Lane V/C Ratio - - 0.084 0.05 - HCM Control Delay (s) - - 14.4 9.3 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0.3 0.2 - P2186 Projected AM Rodney Parham Road at Systematics Road Page 1 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (vph) 18 0 90 35 0 8 120 622 105 29 122 7 Future Volume (vph) 18 0 90 35 0 8 120 622 105 29 122 7 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 100 0 Storage Lanes 0 1 1 0 1 0 2 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 0.97 0.95 0.95 Frt 0.850 0.941 0.978 0.991 Flt Protected 0.950 0.950 0.970 0.950 0.950 Satd. Flow (prot) 0 1770 1583 1681 1615 0 1770 3461 0 3433 3507 0 Flt Permitted 0.816 0.950 0.970 0.663 0.950 Satd. Flow (perm) 0 1520 1583 1681 1615 0 1235 3461 0 3433 3507 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 131 131 14 6 Link Speed (mph) 25 25 40 40 Link Distance (ft) 153 265 289 305 Travel Time (s) 4.2 7.2 4.9 5.2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 20 0 98 38 0 9 130 676 114 32 133 8 Shared Lane Traffic (%) 37% Lane Group Flow (vph) 0 20 98 24 23 0 130 790 0 32 141 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 24 24 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 12112 12 12 Detector Template Left Thru Right Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 20 100 20 100 20 100 Trailing Detector (ft)00000 00 00 Detector 1 Position(ft)00000 00 00 Detector 1 Size(ft) 20 6 20 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft)6666 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Split NA Perm NA Prot NA Protected Phases 3 4 4 2 1 6 Permitted Phases 3 3 2 P2186 Projected AM Rodney Parham Road at Systematics Road Page 2 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Detector Phase 33344 22 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 12.0 Minimum Split (s) 32.9 32.9 32.9 32.9 32.9 24.6 24.6 23.3 24.6 Total Split (s) 33.0 33.0 33.0 32.9 32.9 25.8 25.8 23.3 49.1 Total Split (%) 28.7% 28.7% 28.7% 28.6% 28.6% 22.4% 22.4% 20.3% 42.7% Maximum Green (s) 27.1 27.1 27.1 27.0 27.0 20.2 20.2 18.0 43.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.6 3.6 3.5 3.6 All-Red Time (s) 2.4 2.4 2.4 2.4 2.4 2.0 2.0 1.8 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 5.9 5.9 5.9 5.6 5.6 5.3 5.6 Lead/Lag Lag Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None None None None Act Effct Green (s) 7.0 7.0 6.9 6.9 24.9 24.9 6.6 28.4 Actuated g/C Ratio 0.14 0.14 0.14 0.14 0.52 0.52 0.14 0.59 v/c Ratio 0.09 0.29 0.10 0.07 0.20 0.44 0.07 0.07 Control Delay 25.7 5.8 25.9 0.4 15.6 14.5 25.2 8.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 25.7 5.8 25.9 0.4 15.6 14.5 25.2 8.0 LOS CACA BB CA Approach Delay 9.2 13.4 14.6 11.2 Approach LOS ABBB Stops (vph) 19 11 21 0 79 473 27 58 Fuel Used(gal)0000 18 01 CO Emissions (g/hr) 13 19 17 3 97 574 33 73 NOx Emissions (g/hr)3431 19112 614 VOC Emissions (g/hr)3441 23133 817 Dilemma Vehicles (#)0000 060 09 Queue Length 50th (ft)5060 2487 412 Queue Length 95th (ft) 25 25 30 0 82 203 17 26 Internal Link Dist (ft) 73 185 209 225 Turn Bay Length (ft) 150 100 Base Capacity (vph) 946 1034 1043 1052 635 1788 1442 2964 Starvation Cap Reductn 0000 00 00 Spillback Cap Reductn 0000 00 00 Storage Cap Reductn 0000 00 00 Reduced v/c Ratio 0.02 0.09 0.02 0.02 0.20 0.44 0.02 0.05 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 48.3 Natural Cycle: 115 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 13.6 Intersection LOS: B Intersection Capacity Utilization 46.6% ICU Level of Service A P2186 Projected AM Rodney Parham Road at Systematics Road Page 3 Analysis Period (min) 15 Splits and Phases: 6: Systematics Road P2186 Projected PM 338059A n d ers o n D riv e 52 1 114 4 0 5 5618833635924Systematics Road1101634 01 2 12253146632D riv e A 30 49Rodney Parham Road36216 P2186 Projected PM Rodney Parham Road at Anderson Drive Page 1 Intersection Int Delay, s/veh 3.2 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h 4 0 5 52 1 114 3 380 59 56 188 3 Future Vol, veh/h 4 0 5 52 1 114 3 380 59 56 188 3 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - - 70 - - 70 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 4 0 5 57 1 124 3 413 64 61 204 3 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 541 811 104 675 780 239 207 0 0 477 0 0 Stage 1 328 328 - 451 451 ------- Stage 2 213 483 - 224 329 ------- Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 ------- Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 ------- Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver 424 312 931 340 325 762 1361 - - 1082 - - Stage 1 659 646 - 557 569 ------- Stage 2 769 551 - 758 645 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 338 294 931 323 306 762 1361 - - 1082 - - Mov Cap-2 Maneuver 338 294 - 323 306 ------- Stage 1 658 610 - 556 568 ------- Stage 2 641 550 - 711 609 ------- Approach SE NW NE SW HCM Control Delay, s 12 13.1 0.1 1.9 HCM LOS B B Minor Lane/Major Mvmt NEL NET NERNWLn1NWLn2SELn1 SWL SWT SWR Capacity (veh/h) 1361 - - 323 752 523 1082 - - HCM Lane V/C Ratio 0.002 - - 0.175 0.166 0.019 0.056 - - HCM Control Delay (s) 7.7 - - 18.5 10.7 12 8.5 - - HCM Lane LOS A - - C B B A - - HCM 95th %tile Q(veh) 0 - - 0.6 0.6 0.1 0.2 - - P2186 Projected PM Rodney Parham Road at Drive A Page 1 Intersection Int Delay, s/veh 1.6 Movement NWL NWR NET NER SWL SWT Lane Configurations Traffic Vol, veh/h 30 49 466 32 36 216 Future Vol, veh/h 30 49 466 32 36 216 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 100 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 33 53 507 35 39 235 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 721 271 0 0 542 0 Stage 1 525 ----- Stage 2 196 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 ----- Critical Hdwy Stg 2 5.84 ----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 362 727 - - 1023 - Stage 1 558 ----- Stage 2 818 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 348 727 - - 1023 - Mov Cap-2 Maneuver 348 ----- Stage 1 558 ----- Stage 2 787 ----- Approach NW NE SW HCM Control Delay, s 13.4 0 1.2 HCM LOS B Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh/h) - - 514 1023 - HCM Lane V/C Ratio - - 0.167 0.038 - HCM Control Delay (s) - - 13.4 8.7 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0.6 0.1 - P2186 Projected PM Rodney Parham Road at Systematics Road Page 1 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (vph) 4 0 12 110 1 63 36 359 24 12 253 1 Future Volume (vph) 4 0 12 110 1 63 36 359 24 12 253 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 100 0 Storage Lanes 0 1 1 0 1 0 2 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 0.97 0.95 0.95 Frt 0.850 0.888 0.991 0.999 Flt Protected 0.950 0.950 0.988 0.950 0.950 Satd. Flow (prot) 0 1770 1583 1681 1553 0 1770 3507 0 3433 3536 0 Flt Permitted 0.950 0.988 0.582 0.950 Satd. Flow (perm) 0 1863 1583 1681 1553 0 1084 3507 0 3433 3536 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 131 68 5 Link Speed (mph) 25 25 40 40 Link Distance (ft) 153 265 289 306 Travel Time (s) 4.2 7.2 4.9 5.2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 4 0 13 120 1 68 39 390 26 13 275 1 Shared Lane Traffic (%) 18% Lane Group Flow (vph) 0 4 13 98 91 0 39 416 0 13 276 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 24 24 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 12112 12 12 Detector Template Left Thru Right Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 20 100 20 100 20 100 Trailing Detector (ft)00000 00 00 Detector 1 Position(ft)00000 00 00 Detector 1 Size(ft) 20 6 20 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft)6666 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Split NA Perm NA Prot NA Protected Phases 3 4 4 2 1 6 Permitted Phases 3 3 2 P2186 Projected PM Rodney Parham Road at Systematics Road Page 2 Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Detector Phase 33344 22 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 12.0 Minimum Split (s) 32.9 32.9 32.9 32.9 32.9 24.6 24.6 23.3 24.6 Total Split (s) 33.0 33.0 33.0 32.9 32.9 25.8 25.8 23.3 49.1 Total Split (%) 28.7% 28.7% 28.7% 28.6% 28.6% 22.4% 22.4% 20.3% 42.7% Maximum Green (s) 27.1 27.1 27.1 27.0 27.0 20.2 20.2 18.0 43.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.6 3.6 3.5 3.6 All-Red Time (s) 2.4 2.4 2.4 2.4 2.4 2.0 2.0 1.8 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 5.9 5.9 5.9 5.6 5.6 5.3 5.6 Lead/Lag Lag Lag Lag Lead Lead Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None None None None Act Effct Green (s) 6.7 6.7 8.9 8.9 17.1 17.1 6.7 18.3 Actuated g/C Ratio 0.19 0.19 0.25 0.25 0.49 0.49 0.19 0.52 v/c Ratio 0.01 0.03 0.23 0.21 0.07 0.24 0.02 0.15 Control Delay 19.8 0.2 16.4 8.7 12.6 10.8 19.2 8.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 19.8 0.2 16.4 8.7 12.6 10.8 19.2 8.0 LOS BABA BB BA Approach Delay 4.8 12.7 11.0 8.5 Approach LOS ABBA Stops (vph) 7 0 68 30 26 228 14 134 Fuel Used(gal)0010 04 02 CO Emissions (g/hr) 3 1 53 32 29 268 15 158 NOx Emissions (g/hr) 1 0 10 6 6 52 3 31 VOC Emissions (g/hr) 1 0 12 7 7 62 3 37 Dilemma Vehicles (#)0000 035 024 Queue Length 50th (ft) 1 0 13 3 4 22 1 14 Queue Length 95th (ft) 9 0 75 44 33 108 9 53 Internal Link Dist (ft) 73 185 209 226 Turn Bay Length (ft) 150 100 Base Capacity (vph) 1494 1295 1345 1256 703 2277 2060 3309 Starvation Cap Reductn 0000 00 00 Spillback Cap Reductn 0000 00 00 Storage Cap Reductn 0000 00 00 Reduced v/c Ratio 0.00 0.01 0.07 0.07 0.06 0.18 0.01 0.08 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 35.2 Natural Cycle: 115 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.24 Intersection Signal Delay: 10.4 Intersection LOS: B Intersection Capacity Utilization 45.9% ICU Level of Service A P2186 Projected PM Rodney Parham Road at Systematics Road Page 3 Analysis Period (min) 15 Splits and Phases: 6: Systematics Road