HomeMy WebLinkAboutS-867-Q(9) 112322 ITEM NO.: 1 FILE NO.: S-867-Q(9) NAME: Chenal Valley – Phase 18-L – Revised Preliminary Plat LOCATION: South side of Chalamont Drive at Caurel Circle DEVELOPER: Potlatch – Deltic Real Estate, LLC 7 Chenal Club Boulevard Little Rock, AR 72223 OWNER/AUTHORIZED AGENT: Deltic Real Estate, LLC (Owner) Tim Daters (Agent) White-Daters & Associates, Inc. 24 Rahling Circle Little Rock, AR 72223 SURVEYOR/ENGINEER: White-Daters & Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 32.75 acres NUMBER OF LOTS: 73 FT. NEW STREET: 2,820 LF WARD: 5 PLANNING DISTRICT: 19 CENSUS TRACT: 42.13 CURRENT ZONING: R-2 VARIANCE/WAIVERS: Variances to allow twenty (20) foot front yard side setbacks, twenty (20) foot rear yard setbacks and five (5) foot side yard setbacks. Advance grading variance (clear and grade all lots as part of Phase I). ______________________________________________________________________ A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT: The applicant is proposing a preliminary plat to subdivide 32.75 acres into seventy-three (73) lots for single-family residential development, with 2,820 linear-feet of new streets. The continuation of the subdivision will take access from Chalamont Drive. The property is zoned R-2 and will be completed in two (2) phases. B. EXISTING CONDITIONS: The site is undeveloped and heavily wooded. Single-family zoning and residences are located to the north, east and west. R-2 residential zoning is located to the south. C. NEIGHBORHOOD NOTIFICATIONS: All owners of lands abutting the boundary of the property and all neighborhood associations registered with the City of Little Rock were notified of the public hearing. D. ENGINEERING COMMENTS: Contact Planning and Development Department Engineering Division at 501-371-4817 or at 501-918-5348 for inspections of any work in the public right-of-way prior to placement of concrete or asphalt or for on-site clarification of requirements prior to commencing work. Failure to do so can result in removal of any improperly placed concrete or asphalt at the expense of the owner or contractor. A grading permit must be obtained prior to initiation of work. Grading permits are issued by the Planning and Development Dept. at 723 West Markham Street after approval of sediment and erosion control plans, grading and drainage plans, land survey, drainage study, and soil loss calculations per City’s stormwater management and drainage manual. Contact Planning and Development Dept., Engineering Division at 501-371-4817 or at 501-918-5348 or Permits@littlerock.gov to schedule an appointment for issuance or to answer any questions. Permit cost is based on total project area at $100.00 for the less than ½ acre, $200.00 for ½ to 1 acre, and $200.00 for the first acre and $100.00 for each additional acre for project greater than 1 acre. Any work involving one (1) or more acres of disturbed area requires a State of Arkansas NPDES permit.  Contact the Arkansas Department of Environmental Quality, NPDES branch at 501-682-0744 for applications and information about General Stormwater Discharge Construction Permit #ARR150000. Damage to public and private property due to hauling operations or operations of construction related equipment from a construction site shall be repaired by the responsible party prior to the issuance of a certificate of occupancy. A drainage study showing all hydrologic and hydraulic calculations for the proposed storm sewer pipe system, detention ponds and structures, and inlets is required. For final drainage report, sign, date, and seal the report per AR State Board of Professional Engineers and Professional Surveyors rules Article 12, Section B (1) (a). Provide engineer's certification statement saying this drainage report was conducted by yourself or directly under your supervision and attesting to the accuracy of the information within this report. Per City Rev. Code 29-99, stormwater detention for developments is required. Provide stormwater detention infrastructure to satisfy this requirement. The Department requires three (3) phase sediment and erosion control (SEC) plans to be submitted for all construction projects showing best management practices (BMPs) for mitigating sediment runoff and erosion along with vegetation specifications for temporary and permanent soil stabilization. Phase 1 SEC plans shall show SEC BMPs during the stripping, clearing, grubbing, and rough grading of the site. Phase 2 SEC plans shall show SEC BMPs during construction of utilities, buildings, roadway infrastructure and drainage infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final grading, seeding, and landscaping of the site. Sediment and Erosion Control plans shall also show the pertinent information as outlined in ADEQ ARR150000 Permit Part II section A-4-H (1-14) and Part II section A-4-I-2 (A-B). Per City Code 31-434, a 50% maintenance bond for all street and stormwater infrastructure shall be submitted to Department engineering staff prior to recording of the final plat. Before the 50% maintenance bond can be accepted, a contract unit bid price for every street and stormwater infrastructure construction item within the public right of way shall be submitted to Department engineering staff for review and approval. Per City Code 31-117, as built stormwater drainage infrastructure information/data shall be submitted to the Department of Planning and Development Engineering Division prior to recording of the final plat. This information shall include but not limited to pipe inverts, length of pipe, size of pipe, type of pipe, and type of inlets Per City Rev. Code 31-403 the Department requires street lighting plans to be submitted to the Department for review and approval before filing and recording of the final plat for the subdivision. The street lighting plans required shall include conduit and pull/junction box locations, street luminaire locations and mounting heights, wire sizes, current photometric data for the proposed fixtures, and subdivision street photometrics using the proposed fixtures that meet AASHTO Roadway Lighting Design Guide standards. Per City Code 31-89 (5) for a preliminary plat, a storm drainage preliminary analysis for the 25- and 100-year storms is required showing drainage data for all watercourses entering and leaving the plat boundaries. The storm drainage analysis shall be prepared in sufficient detail to illustrate the proposed system’s capability of accommodating storm events as required by the stormwater management and drainage manual. The preliminary plat shall also show drainage arrows indicating how drainage arrives at the site and drainage arrows how it leaves the site post development. Indicate where the storm sewer pipes are located within the development also. Additionally, provide profile and cross-sectional views of the detention structure outlet/spillway. Delineation of the drainage areas pre and post construction with respective discharges via rational method shall also be shown. The preliminary plat shall also contain all information as outlined in City Code 31-89. Per International Fire Code, the pavement width shall be 26 feet minimum where a fire hydrant is located. E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING: Little Rock Water Reclamation Authority: No comments received. Entergy: No comments received. Summit Energy: No comments. AT & T: No comments received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. CAW is planning a future water storage tank for this area. Engineer to coordinate with CAW to provide road access and water line access up the hill behind the subdivision. Fire Department: Maintain Access: Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. Grade Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. If the grade exceeds 10 percent, approval will be denied and the applicant must submit request to be reviewed by Fire Chief for Approval. Loading Maintain fire apparatus access road design as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire apparatus access roads. Gates Maintain fire apparatus access road gates as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: Minimum gate width shall be 20 feet. Gates shall be of swinging or sliding type. Construction of gates shall be of material that allow manual operation by one person. Gate components shall be maintained in an operable condition at all times and replaces or repaired when defective. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the keys to the lock is installed at the gate location. Locking device specifications shall be submitted for approval \by the fire code official Electric gate operators, where provided, shall be listed in accordance with UL 325. Gates, intended for automatic operation shall be designed, constructed and installed to comply with requirements of ASTM F 2200. One- or Two-Family Residential Developments As per Appendix D, Section D107.1 of the Arkansas Fire Prevention Code Vol. 1, One- or Two-Family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads, and shall meet the requirements of Section D104.3. Exceptions: Where there are more than 30 dwelling units on a single public or private fire apparatus access road and al dwelling units are equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the Arkansas Fire Code, access from two directions shall not be required. The number of dwelling units on a single fire apparatus access road shall not be increased unless fire apparatus access roads will connect with future development, as determined by the fire code official. Fire Hydrants Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire Prevention Code. Section C101 – C105, in conjunction with Central Arkansas Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal’s Office (Capt. Tony Rhodes 501-918-3757, or Fire Marshal Derek N Ingram 501-918-3756 Number and Distribution of Fire Hydrants as per Table C105.1. Parks and Recreation: No comments received. County Planning: No comments received. F. BUILDING CODES/LANDSCAPE: Building Code: No comments received. Landscape: No comments. G. TRANSPORTATION/PLANNING: No comments received. Rock Region Metro: No comments received. Planning Division: No comments. H. ANALYSIS: The applicant is proposing a preliminary plat to subdivide 32.75 acres into seventy-three (73) lots for single-family residential development, with 2,820 linear-feet of new streets. The continuation of the subdivision will take access from Chalamont Drive. The property is zoned R-2. The site is undeveloped and heavily wooded. Single-family zoning and residences are located to the north, east and west. R-2 residential zoning is located to the south. The subdivision will take access from Chalamont Drive and will be developed in two (2) phases. The first phase will include Lots 1 through 11 and Lots 46 through 73. Lots 12 through 45 will be developed during Phase II. The plat indicates a mail kiosk to be located along Cheran Boulevard, just south of the main access at Chalamont Boulevard which includes a proposed walkway extending south from Chalamont Drive to Lot 10. The applicant is requesting variances for reduced front and rear building setbacks of twenty (20) feet and reduced side yard setbacks to be five (5) feet. Sections 36-254(d)(1) and 36-254(d)(3) of the City’s Zoning Ordinance require front yard and rear yard building setbacks of twenty-five (25) feet. Section 36-254(d)(2) of the City’s Zoning Ordinance requires side yard setbacks of eight (8) feet or ten (10) percent the width of the lot. Staff is supportive of the requested setbacks. The applicant is also requesting a variance to advance grade all of the proposed lots with Phase I development. Staff is supportive of the requested variance. The applicant submitted drainage analysis information for both phases proposed for platting. The Department of Planning and Development Engineering Division has received and approved the information submitted. The preliminary plat indicates an emergency access and pedestrian path located in the northeast corner of Tract A. Emergency access shall be developed to comply with Little Rock Fire Department’s design standards. Staff is supportive of the requested preliminary plat for the continued development of the Chenal Valley subdivision. Staff views the request as reasonable. Staff also supports the requested variances. The proposed lots will not be out of character in size with other residential lots within the existing surrounding subdivisions. Staff feels the continuation of the Chenal Valley residential development will have no adverse impact on the surrounding properties. STAFF RECOMMENDATION: Staff recommends approval of the requested preliminary plat, subject to compliance with the comments and conditions outlined in paragraphs D and E, and the staff analysis, of the agenda staff report.