Loading...
HomeMy WebLinkAboutZ-5151-B Map 3E r r - Sc All T.O. IV e'-0" PI BLOCK SCREEI (FINISHI MATCH SURFA( COORO. W/CIVIL CONT. TYP. AT ENTIRE — DRAWINGS FOR PERIMETER OF BUILDING BASE CONTINUATION /';1DRIVE THRU ELEVATION (SOUTH) A� 3/16"=1'—D" ACCENT SEE DET. A/SD3, PAINT BAND SAFETY YELLOW(EPA) AMAIN ENTRY ELEVATION (NORTH) Material Specification Color A5 IANd WALL SURFACE SPECIFICATIONS F- SECTION SA: ALUMINUM ENTRANCE, STOREFRONT SECTION SD: GLAZING GENERAL PROVISIONS GENERAL PROVISIONS SCOPE: FURNISH AND INSTALL THE ALUMINUM ENTRANCE AND 1. SCOPE: FURNISH AND INSTALL GLASS IN STOREFRONT AND DRIVE-THRU STOREFRONT SYSTEMS PER NATIONAL ACCOUNTS AND APPLICABLE SERVICE WINDOW. DRAWINGS. MATERIALS MATERIALS 1. ALUMINUM STOREFRONT AND ENTRANCE FRAMES: REFER TO 1, STOREFRONT GLAZING -REFER TO CONSTRUCTION DRAWINGS AND CONSTRUCTION DRAWINGS AND SPECIFICATIONS, NOTES, 2. ALUMINUM ENTRANCE DOORS: REFER TO CONSTRUCTION DRAWINGS AND PERFORMANCE SPECIFICATIONS. #208810 EXOTIC RED 3, PANIC HARDWARE:WHEN PANIC HARDWARE IS REQUIRED ON EXTERIOR 2. ALLOW FOR 1/4' MINIMUM HEAD DEFLECTION DUE TO LIVE LOAD. DOORS. THE PANIC DEVICE IS ON EXTERIOR ENTRY DOORS WHEN SPECIFIED IN 3. GUARANTEES AND WARRANTIES: AT THE COMPLETION OF THE GLAZING, PROVE THE INSTALLATION WATERTIGHT BY SPRAYING ALL JOINTS WITH A HARDWARE SCHEDULE. GARDEN HOSE WITH NOZZLE SET FOR MAXIMUM PRESSURE. PROVIDE 4. DRIVE-THRU SERVICE WINDOW: THE DRIVE-THRU SERVICE WINDOW WILL BE ADDITIONAL CAULKING OR SEALANT, OR RESET GLASS AS NECESSARY TO SUPPLIED & INSTALLED BY G.C. VERIFY EXACT TYPE OF WINDOW WITH PLANS. EFFECT A WATERTIGHT JOB, DARK BRONZE FINISH. WINDOW TO BE: A. BASE BID -'QUICK SERV M.C.E. WINDOW FLUSH MOUNT. S. MISCELLANEOUS FLASHING/TRM: ALUMINUM HEAD, SILL, COLUMN AND WALL TRIM. SEE EXTERIOR ELEVATIONS FOR FINISH. PERFORMANCE 1. INSTALLATION: INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTION. PLACE IN CORRECT LOCATION AS SHOWN IN THE DETAILS. LEVEL, SQUARE, AND PLUMB AT PROPER ELEVATIONS AND IN ALIGNMENT WITH OTHER WORK. MAINTAIN SPACE IN HEAD POCKET FOR 114' HEAD DEFLECTION. INSURE FRAMING PROFILES MEET INSTALLATION REQUIREMENTS OF GLAZING UNITS TO MAINTAIN WARRANTY. SEE SECTION 8-D: GLAZING. CONT. TYP. AT ENTIRE PERIMETER OF BUILDING BASE EXTERIOR FINISH NOTES STO COLORS NA10-0016 - DELIGHTFUL GOLDEN NA014061 - EXOTIC RED NA10.0017 - MOCHA BROWN DRYVIT COLORS POPE051020. DELIGHTFUL GOLDEN POPEOVO28S. EXOTIC RED POPE031020S - MOCHA BROWN EJ.F.S. WALL TEXTURE FINISH ManuH, texture STO STO ESSENCE SWIRL DRYVIT QUARTZ PUTZ FINISH NOTES THE FOLLOWING COMPONENTS CAH BE PURCHASED FROM THE APPROVED SIGN VENDORS, STANDING SEAM ROOF BALCONY RAILING CLEARANCE BAA MENU CANOi ` GUARDRAIL AWNINGS SHUTTERS DUMPs TERGATES INTERIOR LADDER ENCLOSURE GATE THE FOLOMNG COMPONENTS TO BE MANUFACTURED ALAI INSTALLED BY THE GENERA 0014 RACTOR • EXTERIORLADDER HOOEY!! tour m [RtpEN EXTERIOR FINISH SCHEDULE NEW CONSTRUCTION AM REIMAGING UPDATE: 7/112015 AEarM I Location SIIGCllel/Mntd. Material Specification Color Finish/Notes IANd WALL SURFACE F- Q Q EP -1 ABOVE WA16COT ACCENT PAMOREFSFORMHLA #215830 DELIGHTFUL GOLDEN URraspec Satin TR1A CROWNI WALL SURFACE rT, fLJ-J� T rW� EP -2 /WAINSCOT BENJAMIN MOORE PAMOREIFSFORM.ILA- #208810 EXOTIC RED Utraspec Satin ACCENT TRIM Tq N 1 IVYr EP -3 WAINSCOT BELOW EFS/METAL/PPM #2107-20 MOCHABROWN LAtraspec Satin CEM TRIM@REAR BLDG l O 14121001*VNYL SHUTTERS L2 -VINYL UNFINISHED 030-PAMABLE SHUTTERCONIRAUTOR.DOM 2S VIX719'NJYL EP -4 SHUTTERS SHUTTERS L7S-VNY'L UNFINISHED 030-PAINTABLE BENJAMIN WORE PAM #204010 RAINFOREST FOLIAGE 170 Semi Gloss EP -5 D7f THRU WINDOW CNCPYAND RAILINGS RAILING VENDORI ICER ORYLAC METAL/POWDER COAT RAL 8009 HUNTER GREEN SMOOTH EP -5 RAILING VENDOR/ METAL /PAINT #2040-10 RAINFOREST FOLIAGE P-29 DTM Semi Gloss ALTI BENJAMIN WORE EPA STORE FRONT GLAZING YKK AP ANW12ED ALLMiIM #YB5N DARK BRONZE 21-28 DAYS HPA ,STORE FRONT GLAZING METAL/ PAM BENJAMIN WORE FETAL/ASPHALT; PAM READY MX BRONZETONE P-29 DTM Semi Gloss EP -7 DIJIPSTER WALLS/GATES #2107-20 MOCHA BROWN Ukraspec Basin EPA BOLLARDS SAFETY &ZONE RMSAFETYYELLOW P58-10 ACRYLIC MARKING SW -i BORAL STOLE F_RSETTA SMMATED LEDGESTONE PLUMB CREEK NON -OVERLAPPING STONE WAINSCOT STOE VENEER Q11E(REIE SNEER STONE MORTAR 'POLYMER MODIFIED MOCHABROWN 1137-85 SO-• .AWNING GRATE OPT. AWNING SUPPLER A1-4_ --CWDERCOAT ;RAL EDD9 HUNTER GREEN SMOOTH SANDING SEAM CANOPY COPPER SAES PG. 1:—=_� UCAALUMNUMREGAL RED 170C I CODEREQUIEMENLOCAL CODE REQUIREMENTS DRAWINGS FOR CONTINUATION BOLT rm. s M'ybmliA OUQb ' I,T QA. QALY E PANELS EWAI w (® v E F- Q Q I o L V I �1 /y Fwes� (® v E F- ,^ u J o L V I V LL rT, fLJ-J� T rW� e+ Tq N 1 IVYr �Ll If TW��I r�I � �/�.AoI'• r� l O I� JOB NUMBER M6-101 DATE 06-14-2016 SHEET 2 OF 2 SHEETS f LEVATIONS _j NOT VALID WITHOUT SEAL AND ORIGINAL SIGNATURE FOR CONSTRUCTION DATE: 91OZ 9 I Nnr