Loading...
HomeMy WebLinkAboutZ-5151-B Map 1SPECIFICATIONS: DIVISION 7: THERMAL AND MOISTURE PROTECTION GENERAL SECTION 7C: SHEET METAL WORK PROVISION 1. SCOPE: FURNISH AND INSTALL GRAVEL STOPS, FLASHING, PARAPET CAP, DOWNSPOUTS, AND GUTTERS. A. ROOFING MEMBRANE FLASHING IS INCLUDED IN SECTION 78: MEMBRANE ROOFING. MATERIALS 1. MATERIALS SHEET METAL: .032 ALUMINUM. 2. NAIL FASTENERS: 1314" X 11 GAUGE GALVANIZED, STAINLESS STEEL, OR ALUMINUM ROOFING NAILS MAY BE USED FOR FASTENERS INTO WOOD WHEN CONCEALED ONLY, 3, WASHERS: NEOPRENE 4. SCREW FASTENERS: CORROSION -RESISTANT, SELF -TAPPING, HEX HEAD SCREW, IW MINIMUM DIAMETER WITH SUFFICIENT LENGTH TO PENETRATE V MINIMUM INTO WOOD OR 112" MINIMUM INTO STEEL. PROVIDE NEOPRENE SEALING WASHER FOR EXPOSED FASTENING. PERFORMANCE 1. INSTALLATION: EXPOSED FLASHINGS SHALL BE PAINTED TO MATCH ADJACENT MATERIALS. VERIFY WITH POPEVES' CONSTRUCTION MANAGER. SECTION 7D: STANDING SEAM PART 1 -GENERAL CANOPY 1.0 SUBMITTALS A. SUBMIT FOR APPROVAL SAMPLES, SHOP DRAWINGS, PRODUCT DATA. QUALITY ASSURANCE A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER HANDLE, STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. WARRANTY METAL ROOF SYSTEM MANUFACTURER, UPON FINAL ACCEPTANCE FOR PROJECT, FURNISH A WARRANTY COVERING BARE METAL AGAINST RUPTURE, STRUCTURAL FAILURE AND PERFORATION DUE TO NORMAL ATMOSPHERIC CORROSION EXPOSURE FOR A PERIOD OF 20 YEARS. PART 2 - PRODUCTS (UC4 SERIES, AS MANUFACTURED AND SPECIFIED BY UNA-CLAD., METAL ROOF SYSTEMS.) 2,0 MATERIALS A METAL ROOF SYSTEM PROFILE: 1. UC4 "NO CLIP", 1 ill" HIGH BATTENS x 12" RIB TO RIB. (SMALL BATTEN -SB) 2. CONCEALED FASTENER B. GAUGE: 1. .028 GAUDE - STEEL C. TEXTURE: 1. SMOOTH. D. FINISH: 1. PREMIUM FLUOROCARBON COATING PRODUCED WITH KYNAR SOD OR HYLAR 5000 RESIN 120 YEAR WARRANTY.) E. MANUFACTURER 1. UNA-CLAD OR EQUAL. PART 3 - EXECUTION 3.0 INSTALLATION A COMPLY WITH SMACNA SHEET METAL MANUAL RECOMMENDATIONS, COMPLY WITH ACCESSORY MANUFACTURERS' INSTRUCTIONS AND RECOMMENDATIONS. COORDINATE INSTALLATION WITH ROOFING SYSTEM TO ENSURE WEATHERTIGHT PERFORMANCE. B. ANCHOR SECURELY TO STRUCTURE TO WITHSTAND INWARD AND OUTWARD LOADS. C. ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC CORROSION. DIVISION 9: FINISHES SECTION SG: EIFS PART GENERAL 1,01 DESCRIPTION A DESIGN REQUIREMENTS: THE STRUCTURAL WALL SYSTEM TO WHICH THE EIFS IS ATTACHED SHALL MEET L240 MAXIMUM ALLOWABLE DEFLECTION CRITERIA AND APPLICABLE BUILDING CODE REQUIREMENTS. 1.02 SUBMITTALS A. SUBMIT SAMPLES FOR APPROVAL AS DIRECTED BY OWNER 1.03 DELIVERY, STORAGE AND HANDLING A ALL EIFS MATERIALS SHALL BE DELIVERED IN THEIR ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S NAME AND IDENTIFICATION OF PRODUCT WITH WRITTEN APPLICATION INSTRUCTIONS AND APPROPRIATE HEALTH, HAZARD, AND SAFETY DATA B. ALL EIFS READY -MIXED MATERIALS SHALL BE PROTECTED FROM EXTREME HEAT, SUN AND FROST, FACTORY PROPORTIONED BAGGED MATERIALS SHALL BE STORED OFF THE GROUND AND PROTECTED FROM MOISTURE. 1.04 JOB CONDITIONS A ALL EIFS MATERIALS SHALL NEVER BE APPLIED IF AMBIENT AND SURFACE TEMPERATURES CANNOT BE KEPT ABOVE 40-F DURING APPLICATION AND DRYING PERIOD. FOR INSTALLATION IN TEMPERATURES LESS THAN 40' F SUPPLEMENTARY HEAT SHALL BE PROVIDED. THE INSTALLED EIFS MATERIALS SHALL BE PROTECTED FROM EXPOSURE TO RAIN AND FREEZING UNTIL DRY. 1.11 WARRANTY A PROVIDE MANUFACTURERPS STANDARD LABOR AND MATERIAL WARRANTY, PART 2 PRODUCTS 2.01 MANUFACTURERS A ORYVIT SYSTEMS, INC. 2.02 ADHESIVES A. DISPERSION ADHESIVE- NONCEMENTITIOUS, ACRYLIC BASED ADHESIVE. 2.03 INSULATION BOARD A NOMINAL 1.0 Iblcubic feet (16 kglcobic meter) EXPANDED POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH ASTM C 578 TYPE I REQUIREMENTS, AND EIA# GUIDELINE SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS) INSULATION BOARD. 2.04 SASECOAT A. ONE -COMPONENT POLYMER MODIFIED CEMENTITIOUS BASE COAT WITH FIBER REINFORCEMENT AND LESS THAN 33% PORTLAND CEMENT CONTENT BY WEIGHT. 2.05 REINFORCING MESHES A STANDARD MESH 1. MESH -NOMINAL 4,5 oNstiyd.(163 glsR.meter), SYMMETRICAL, INTERLACED OPEN -WEAVE GLASS FIBER FABRIC MADE WITH MINIMUM 25 PERCENT BY WEIGHT ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH DRYVIT MATERIALS. S. HIGH IMPACT MESH 1. INTERMEDIATE MESH (MESH C)- NOMINAL 11.0 celK.yc. HIGH IMPACT, INTERWOVEN, OPEN WEAVE GLASS FIBER FABRIC WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH ORWIT MATERIALS. 2.06 PRIMER A. PRIMER ACRYLIC BASED PRIMER (FOR ACRYLIC BASED FINISHES) 2.07 FINISH COAT A. ACRYLIC BASED TEXTURED WALL COATING. SEE EJ.F.S. FORMULAS FOR FINISH COLOR. 2.06 JOB MIXED INGREDIENTS A. PORTLAND CEMENT: ASTM C 150, TYPE 1. B. WATER: CLEAN AND POTABLE. PART 3 EXECUTION A. UNDER NO CIRCUMSTANCES SHALL ANY OF THE PRODUCTS BE ALTERED BY ADDING ANY ADDITIVES, EXCEPT FOR SMALL AMOUNTS OF CLEAN WATER AS DIRECTED ON LABEL. ANTIFREEZE, ACCELERATORS, RAPID BINDERS, ETC., ARE FORBIDDEN. S. THE SURFACE TO RECEIVE THE EIFS SHALL BE STRUCTURALLY SOUND, CLEAN, DRY AND FREE OF WARPAGE, RESIDUAL MOISTURE OR DAMAGE FROM MOISTURE. SURFACES SHALL BE UNIFORM, WITH NO IRREGULARITIES GREATER THAN 118' In 4'-0'. SURFACES SHALL BE INSPECTED FOR COMPLIANCE WITH THE FOLLOWING REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS: 1. PLYWOOD SHEATHING SHALL MEET A.P.A.(AMERICAN PLYWOOD ASSOCIATION) REQUIREMENTS FOR EXTERIOR OR EXPOSURE 1 CLASSIFICATION. APA DESIGN AND CONSTRUCTION GUIDELINES SHALL BE FOLLOWED FOR STORAGE, HANDLING AND INSTALLATION. MANUFACTURERS PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR SHALL BE FOLLOWED FOR STORAGE, HANDLING, STORAGE, HANDLING, INSTALLATION AND PROTECTION. ANY SHEATHING NOT IN COMPLIANCE SHALL BE REPLACED TO CONFORM WITH SPECIFICATION REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS, 2, CONCRETE, MASONRY OR PLASTER SURFACES SHALL BE PROPERLY CURED AND FREE OF DIRT, DUST, OIL, GREASE, MILDEW, FUNGUS. LATENCY, PAINT, EFFLORESCENCE AND ANY OTHER CONTAMINANT. ANY SURFACES NOT IN COMPLIANCE SHALL BE CORRECTED PER MANUFACT. RECOMMENDATIONS PRIOR TO INSTALLATION OF THE EIFS. C. AFTER SATISFACTORY INSPECTION OF SURFACES AND CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION REQUIREMENTS, THE EIFS INSTALLATION MAY BEGIN PER MANUFACTURER'S INSTRUCTIONS. D. THE STARTER STRIP OF MESH SHALL BE WIDE ENOUGH TO ADHERE 4" OF MESH ONTO THE WALL, BE ABLE TO WRAP AROUND THE BOARD EDGE AND COVER APPROXIMATELY 4- ON THE OUTSIDE SURFACE OF THE BOARD. THIS SACKWRAP" PROCEDURE SHALL BE FOLLOWED AT ALL EXPOSED BOARD EDGES IN ACCORDANCE WITH DETAILS (EXAMPLE -WINDOW AND DOOR HEADS AND JAMBS). ALL AREAS WHERE THE EIFS MEETS DISSIMILAR MATERIAL OR TERMINATES (FOR EXAMPLE, WINDOW AND DOOR FRAMES) SHALL HAVE THE INSULATION BOARD CUT BACK FROM THE ADJOINING MATERIAL A MINIMUM OF 114" TO FORM AN ISOLATION JOINT. E. APPLY THE ADHESIVE TO THE BACK OF THE INSULATION BOARD. STAGGER VERTICAL JOINTS AND INTERLOCK BOARDS AT ALL INSIDE AND OUTSIDE CORNERS. APPLY FIRM PRESSURE OVER ENTIRE SURFACE OF THE BOARDS TO INSURE UNIFORM CONTACT. BOARDS SHALL BRIDGE SHEATHING JOINTS BY A MINIMUM OF 8', ALL BOARD JOINTS SHALL BE BUTTED TIGHTLY TOGETHER TO ELIMINATE ANY THERMAL BREAKS IN THE EIFS. CARE MUST BE TAKEN TO PREVENT ANY ADHESIVE FROM GETTING BETWEEN THE JOINTS OF THE BOARDS. ALL OPEN JOINTS IN THE INSULATION BOARD LAYER SHALL BE FILLED WITH SLIVERS OF INSULATION OR AN APPROVED SPRAY FOAM. F. NAILS, SCREWS, OR ANY OTHER TYPE OF NONTHERMAL MECHANICAL FASTENER SHALL NOT BE USED. G. EXPANSION JOINTS ARE REQUIRED IN THE EIFS WHERE THEY EXIST IN THE SUBSTRATE, WHERE THE EIFS ADJOINS DISSIMILAR CONSTRUCTION, AND AT FLOOR LINES IN MULTILEVEL WOOD FRAME CONSTRUCTION. THE EIFS SHALL TERMINATE AT THE EXPANSION JOINT TO PROVIDE APPROPRIATE JOINT SIZE (SEE DETAILS) AND ALL BOARD EDGES SHALL BE COATED WITH APPROPRIATE GROUND COAT AND MESH IN ACCORDANCE WITH STANDARD'9ACKWRAPPING' PROCEDURE. APPROPRIATE SEALANT/PRIMER AND BACKER SHALL BE INSTALLED AFTER GROUND COAT IS FULLY DRY TO PREVENT ANY WATER FORM GERING INTO OR BEHIND THE SYSTEM. H. USE OF PLASTIC OR METAL CORNER BEADS, STOPBEADS, ETC, IS FORBIDDEN. I. APPLY APPROPRIATE GROUND COAT OVER THE INSULATION BOARD WITH PROPER SPRAY EQUIPMENT OR A STAINLESS STEEL TROWEL TO A UNIFORM THICKNESS OF APPROXIMATELY Ill W. WORK VERTICALLY IN TRIPS OF 40" AND IMMEDIATELY EMBED STANDARD REINFORCING E S TH EMBED STANDARD REINFORCING MESH INTO THE WET GROUND GOAT. THE MESH SHALL BE DOUBLE WRAPPED AT ALL CORNERS AND OVERLAPPED NOT LESS THAN FINISH AT MESH JOINTSAVOID GR WRINKLES IN THE MESH. TT FINISHTHICKNESS EM THE GROUND COAT SHALL T SUCH THATTHE MESH ISFULLY EMBEDDED.ALLOW GROUND COAT TO THOROUGHLY DRV BEFORE APPLYING PRIMER OR FINISH. J. DUPLICATE INSTALLATION PROCESS NOTED IN 3.01 M USING STANDARD MESH CREATING SECOND MESH LAYER AND ADDITIONAL IMPACT RESISTANCE, ALLOW TO DRY BEFORE APPLICATION OF EITHER STO PRIMER (OPTIONAL) OR STO FINISH. K. IF A PRIMER IS USED, APPLY WITH BRUSH, ROLLER OR PROPER SPRAY EQUIPMENT OVER CLEAN, DRY GROUND COAT AND ALLOW TO DRY THOROUGHLY BEFORE APPLYING FINISH. P. APPLY FINISH Q IRECTLY OVER THE GROUND COAT (OR PRIMED GROUND COAT) ONLY AFTER THE GROUND COATIPRIMER HAS THOROUGHLY DRIED, THE FINISH SHALL BE APPLIED BY SPRAYING, ROLLING OR TROWELING WITH A STAINLESS STEEL TROWEL, DEPENDING ON FINISH SPECIFIED. GENERAL RULES FOR APPLICATION OF FINISHES ARE AS FOLLOWS: 1. USE A CLEAN, RUST -FREE, HIGHSPEED MIXER TO THOROUGHLY STIR THE FINISH TO A UNIFORM CONSISTENCY (SMALL AMOUNTS OF CLEAN WATER MAY BE ADDED TO AID WORKABILITY, 2. AV010 AP UCATION IN DIRECT SUNLIGHT. 3. APPLY FINISH IN A CONTINUOUS APPLICATION, ALWAYS WORKING TO A WET EDGE. 4. WEATHER CONDITIONS AFFECT APPLICATION AND DRYING TIME. HOT OR DRY CONDITIONS LIMIT WORKING TIME AND ACCELERATE DRYING AND MAY REQUIRE ADJUSTMENTS IN THE SCHEDULING OF WORK TO ACHIEVE DESIRED RESULTS: COOL OR DAMP CONDITIONS EXTEND WORKING TIME AND RETARD DRYING AND MAY REQUIRE ADDED MEASURES OF PROTECTION AGAINST WIND, DUST, DIRT, RAIN AND FREEZING. S. AESTHETIC'U`-GROOVES MAYBE DESIGNED INTO THE SYSTEM. (A MINIMUM OF 314" INSULATION BOARD MUST BE LEFT AFTER ANY GROOVES ARE CUT). B. -W (FILLED TEXTURE) FINISHES MUST BE FLOATED WITH PLASTIC TROWEL TO ACHIEVE THEIR RILLED TEXTURE. 7. AVOID INSTALLING SEPARATE SATCHES OF FINISH SIDE-BYSIDE. 8. APPLY FINISH COLOR TO EIFS MIX AND APPLY TO WALL. COLOR TO MATCH EXTERIOR FINISH SCHEDULE COLORS. L. EXTERIOR INSULATION AND FINISH TEXTURE SYSTEM: APPLY HIGH IMPACT SYSTEM ADJACENT TO DOORS FOR ADDITIONAL IMPACT RESISTANCE, USING INTERMEDIATE MESH. USE THE STANDARD SYSTEM SPECIFICATIONS AT ALL OTHER LOCATIONS. 0 AWNING SUPPORTS AT 4'-O" O.C. AND AT EACH END -0 i93 AFF. T.O. PARAPET ,FRONT ELEVATION (EAST T.O.PARAPET 20'-10" AFF P- RTU -#1 10 T.O. PARAPET B'-2" AFF 8"x12" 20 GALV. METAL CONDUCTOR HEAD W/ OVERFLOW. PROVIDE 4"x4"22 GA. DOWN SPOUT. POINT TO - MATCH BUILDING ELEVATION COORD. WV CIVIL DRAWINGS FOR CONTINUATION REAR ELEVATION (WEST) A5 3/16"=1'-0" FRAMING SUBSTRATE CODE APPROVED WATER RESISTIVE BARRIER, BY OTHERS ORYATAPPROVEDWASHER WITH CORROSION RESISTANT FASTENER DRYVR DRAINAGE MAT EPS INSULATION BOARD DRYVIT GENESASeSASE COAT DRYYR REINFORCING MESH ORYVIT GENESIS BASE CWT ORYATFINISH DRAINAGE MAT sysL TEM 11 Oulsulattan LCMD optionl as menuf by DrM 3A TYP. EIFS DETAIL As.o NTS F£RMALATH t0oc aR 34 h�eP p- pyMpEu 1ArAL LATH SEIERGYSTUCCOBASE� :_ _';�TaRrw Prt•6YIDPI[ _x _-Sr FalSHCWT� �.nG O=J+no0.x�.FP 5al=.Eo 0 WALL MOUNTED SIGN AND FRAMING AS SHOWN: IL -27 ILLUMINATED LETTERS BUILDING SIGN TEMP. TEMP.C-1 TEMP. TEMP. - COUPLE HOSE Finish l Notes CYD CONNEC70R8 --I L� l� - DRAIN VALVE AT P-8 GREASE &CO2 FRYERS. RUN OWWANISCOTACCENT TANKS SELF -DRAINING PIPE COORD.W/CIVIL BYVENDOR EXHAUST FAN HEF : ELEC. C.T. CABINET, (VERIFY WI LOCAL CODE THE REO'D. LOCATION & MOUNTING HEIGHT) TOTAL OF 4 EQ. WINDOWS W/ MULLIONS BAND T.O. PARAPET 20'-10" AFF. 00 T.O. PARAPET 18'-2" AFF. SW- T.O. PARAPET -` 19'-6" AFF. 30 TYP. STUCCO DETAIL ASD N'S ALTERNATE OUBLE LOUVER L SHUTTER 'ACE GAP FRAME, TED EPA EXTERIOR FINISH NOTES STO COLORS NA1MOI 6 - DELIGHTFUL GOLDEN NAOI-0061 - EXOTIC RED NA10.0017 - MOCHA BROWN DRWIT COLORS POPE051020- DELIGHTFUL GOLDEN POPED21028S - EXOTIC RED POPE031020S - MOCHA BROWN E.I.F.S. WALL TEXTURE FINISH AllTexture STO STOESSENCE SWIRL DRYVR QUARTZ PUTZ FINISH NOTES THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE APPROVED SIGN VENDORS: ' STANDING SEAM ROOF • BALCONY RAILING • CLEARANCE BAR • MENU CANOPY ` GUARD RAIL • AWNINGS SHUTTERS DUMPSTERGATES INTERIOR LADDER ' ENCLOSURE GATE THE FaOWING COMPONENTS TO BE MANUFACTURED AND INSTALLED BY THE GENERAL CONTRACTOR • EXTERIOR LADDER POCETE! LOORIANA KITCHEN I EXTERIOR FINISH SCHEDULE I Mark 1 _ v PROVIDE QUICK M4tetlal - COUPLE HOSE Finish l Notes CYD CONNEC70R8 --I L� l� - DRAIN VALVE AT P-8 GREASE &CO2 FRYERS. RUN OWWANISCOTACCENT TANKS SELF -DRAINING PIPE COORD.W/CIVIL BYVENDOR FROM FRYERS TO DRAWINGS FOR TRIM OUTSIDE CONTINUATION COLLECTION UNIT. 30 TYP. STUCCO DETAIL ASD N'S ALTERNATE OUBLE LOUVER L SHUTTER 'ACE GAP FRAME, TED EPA EXTERIOR FINISH NOTES STO COLORS NA1MOI 6 - DELIGHTFUL GOLDEN NAOI-0061 - EXOTIC RED NA10.0017 - MOCHA BROWN DRWIT COLORS POPE051020- DELIGHTFUL GOLDEN POPED21028S - EXOTIC RED POPE031020S - MOCHA BROWN E.I.F.S. WALL TEXTURE FINISH AllTexture STO STOESSENCE SWIRL DRYVR QUARTZ PUTZ FINISH NOTES THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE APPROVED SIGN VENDORS: ' STANDING SEAM ROOF • BALCONY RAILING • CLEARANCE BAR • MENU CANOPY ` GUARD RAIL • AWNINGS SHUTTERS DUMPSTERGATES INTERIOR LADDER ' ENCLOSURE GATE THE FaOWING COMPONENTS TO BE MANUFACTURED AND INSTALLED BY THE GENERAL CONTRACTOR • EXTERIOR LADDER POCETE! LOORIANA KITCHEN I EXTERIOR FINISH SCHEDULE I Mark ' Location SWPINN III M4tetlal Specification Color Finish l Notes CYD MAN WALL SURFACE --I L� l� I �y v �-I TSI EP -1 OWWANISCOTACCENT �i PANTOREFSFORMUTA #2 M30 DELIGHTFUL OLDEN Ulnaepec Satin lrT�,1 F� TRIM CROWN/ WAIL SURFACE EP -2 ACCENTIWAINSCOT BENJAMIN MOORE PNNTOR EIFS FORMULA #20813-10 EXOTIC RED UBraspec Satin ACCENT TRIM EP4 WAINSCOT BELOW EFS/METAL/PAINT #2107-20 MOCHABROWN Utrsspec Shin CENT TRWAMREAR BLDG 14.10x00'MNYL SHUTTERS Beknn L2 VINYL UNFINISHED 030-PAINTABLE SHUITERCONTRACTOR.COM 251 17k 1B"MNYL L78 -VINYL UNFINISHED 030-PANTPBLE EPJ SHIIITTERS SHUTTERS Buldin BENJAMIN MOORE PAINT 02040-10 RANFOREST FOLIAGE 170 Semi Gloss EPS DR.fHRU WIDOW CONOPYANDRAUNGS RPLNG VENDOR/TIGER DRYING METALIPOWDERCOAT RAL 6008 HUNTER GREEN SMOOTH EP -5 BAYING VENDORI METAL/PAINT #2040-10 RANFORESTFOLAGE P-28DTMSeml Gloss BENJAMIN MOORE EP4i STORE FRONT GLAZING YKK PP ANODIZED ALUMINUM #YBSN DARK BRONZE 21-28 DAYS EPE STORE FRONT GLAZING READY MSX BRONZETONE P-28 DTM Be.] Go.. SENJPMIN MORE METAL/PAINT #2107-20 MOCHABROWN Uftravpec Selin EP -7 DIIFSTER WALLS/ GATES EP -8 SOWARDS METAL/ASPHALTIPAINT SAFETY &ZONE RMSAFETYYELLOW PS&1O ACRYLIC MARKING SN'l BORAL STONE VERSETTA SM7JLATED LEDGESTONE PLUME CREEK MON-OVERLAPPING STOLE WANSCOT STONE VENEER QUIKRETE VENEER STONE MORTAR POLYMER MODIFIED MOCHABROWN 1137-85 Sc -1 GLI GRATE OPT. AWNING SUPPLER METAL/POWDER COAT RAL 8008 HUNTER GREEN SMOOTH C-1 STANDING SEAM CANOPY COPPER SALES, NC. UNA-CLAD UC4 ALUMINUM RECvLLRED 12" OC I GLL4OE PER LOCAL CODE REQUIREMENTS JOB NUMBER P16-101 DATE 06-14-2016 SHEET 1 OF 2 SHEETS �E`ll __j NOT VALID WITHOUT SEAL AND ORIGINAL SIGNATURE FOR CONSTRUCTION DATE: 9101 � I Nnr /W CYD r h+ --I L� l� I �y v �-I TSI �i Ln JOB NUMBER P16-101 DATE 06-14-2016 SHEET 1 OF 2 SHEETS �E`ll __j NOT VALID WITHOUT SEAL AND ORIGINAL SIGNATURE FOR CONSTRUCTION DATE: 9101 � I Nnr W LnO lrT�,1 F� Fri c'n JOB NUMBER P16-101 DATE 06-14-2016 SHEET 1 OF 2 SHEETS �E`ll __j NOT VALID WITHOUT SEAL AND ORIGINAL SIGNATURE FOR CONSTRUCTION DATE: 9101 � I Nnr