HomeMy WebLinkAboutZ-5151-B Map 1SPECIFICATIONS:
DIVISION 7: THERMAL AND MOISTURE
PROTECTION
GENERAL SECTION 7C: SHEET METAL WORK
PROVISION
1. SCOPE: FURNISH AND INSTALL GRAVEL STOPS, FLASHING, PARAPET CAP,
DOWNSPOUTS, AND GUTTERS.
A. ROOFING MEMBRANE FLASHING IS INCLUDED IN SECTION
78: MEMBRANE ROOFING.
MATERIALS
1. MATERIALS SHEET METAL: .032 ALUMINUM.
2. NAIL FASTENERS: 1314" X 11 GAUGE GALVANIZED, STAINLESS STEEL, OR
ALUMINUM ROOFING NAILS MAY BE USED FOR FASTENERS INTO WOOD WHEN
CONCEALED ONLY,
3, WASHERS: NEOPRENE
4. SCREW FASTENERS: CORROSION -RESISTANT, SELF -TAPPING, HEX HEAD
SCREW, IW MINIMUM DIAMETER WITH SUFFICIENT LENGTH TO PENETRATE V
MINIMUM INTO WOOD OR 112" MINIMUM INTO STEEL. PROVIDE NEOPRENE
SEALING WASHER FOR EXPOSED FASTENING.
PERFORMANCE
1. INSTALLATION: EXPOSED FLASHINGS SHALL BE PAINTED TO MATCH
ADJACENT MATERIALS. VERIFY WITH POPEVES' CONSTRUCTION MANAGER.
SECTION 7D: STANDING SEAM
PART 1 -GENERAL CANOPY
1.0 SUBMITTALS
A. SUBMIT FOR APPROVAL SAMPLES, SHOP DRAWINGS,
PRODUCT DATA.
QUALITY ASSURANCE
A. COMPLY WITH GOVERNING CODES AND REGULATIONS.
PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS
WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE
FOR THREE YEARS. USE EXPERIENCED INSTALLERS.
DELIVER HANDLE, STORE MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
WARRANTY
METAL ROOF SYSTEM MANUFACTURER, UPON FINAL
ACCEPTANCE FOR PROJECT, FURNISH A WARRANTY
COVERING BARE METAL AGAINST RUPTURE, STRUCTURAL
FAILURE AND PERFORATION DUE TO NORMAL ATMOSPHERIC
CORROSION EXPOSURE FOR A PERIOD OF 20 YEARS.
PART 2 - PRODUCTS (UC4 SERIES, AS MANUFACTURED AND SPECIFIED BY
UNA-CLAD., METAL ROOF SYSTEMS.)
2,0 MATERIALS
A METAL ROOF SYSTEM PROFILE:
1. UC4 "NO CLIP", 1 ill" HIGH BATTENS x 12" RIB TO RIB.
(SMALL BATTEN -SB)
2. CONCEALED FASTENER
B. GAUGE:
1. .028 GAUDE - STEEL
C. TEXTURE:
1. SMOOTH.
D. FINISH:
1. PREMIUM FLUOROCARBON COATING PRODUCED WITH
KYNAR SOD OR HYLAR 5000 RESIN 120 YEAR WARRANTY.)
E. MANUFACTURER
1. UNA-CLAD OR EQUAL.
PART 3 - EXECUTION
3.0 INSTALLATION
A COMPLY WITH SMACNA SHEET METAL MANUAL
RECOMMENDATIONS, COMPLY WITH ACCESSORY
MANUFACTURERS' INSTRUCTIONS AND RECOMMENDATIONS.
COORDINATE INSTALLATION WITH ROOFING SYSTEM TO
ENSURE WEATHERTIGHT PERFORMANCE.
B. ANCHOR SECURELY TO STRUCTURE TO WITHSTAND
INWARD AND OUTWARD LOADS.
C. ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC
CORROSION.
DIVISION 9: FINISHES
SECTION SG: EIFS
PART GENERAL
1,01 DESCRIPTION
A DESIGN REQUIREMENTS: THE STRUCTURAL WALL SYSTEM
TO WHICH THE EIFS IS ATTACHED SHALL MEET L240 MAXIMUM
ALLOWABLE DEFLECTION CRITERIA AND APPLICABLE BUILDING
CODE REQUIREMENTS.
1.02 SUBMITTALS
A. SUBMIT SAMPLES FOR APPROVAL AS DIRECTED BY
OWNER
1.03 DELIVERY, STORAGE AND
HANDLING
A ALL EIFS MATERIALS SHALL BE DELIVERED IN THEIR
ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S
NAME AND IDENTIFICATION OF PRODUCT WITH WRITTEN
APPLICATION INSTRUCTIONS AND APPROPRIATE HEALTH,
HAZARD, AND SAFETY DATA
B. ALL EIFS READY -MIXED MATERIALS SHALL BE PROTECTED
FROM EXTREME HEAT, SUN AND FROST, FACTORY
PROPORTIONED BAGGED MATERIALS SHALL BE STORED OFF
THE GROUND AND PROTECTED FROM MOISTURE.
1.04 JOB CONDITIONS
A ALL EIFS MATERIALS SHALL NEVER BE APPLIED IF AMBIENT
AND SURFACE TEMPERATURES CANNOT BE KEPT ABOVE 40-F
DURING APPLICATION AND DRYING PERIOD. FOR
INSTALLATION IN TEMPERATURES LESS THAN 40' F
SUPPLEMENTARY HEAT SHALL BE PROVIDED. THE INSTALLED
EIFS MATERIALS SHALL BE PROTECTED FROM EXPOSURE TO
RAIN AND FREEZING UNTIL DRY.
1.11 WARRANTY
A PROVIDE MANUFACTURERPS STANDARD LABOR AND
MATERIAL WARRANTY,
PART 2 PRODUCTS
2.01 MANUFACTURERS
A ORYVIT SYSTEMS, INC.
2.02 ADHESIVES
A. DISPERSION ADHESIVE- NONCEMENTITIOUS, ACRYLIC
BASED ADHESIVE.
2.03 INSULATION BOARD
A NOMINAL 1.0 Iblcubic feet (16 kglcobic meter) EXPANDED
POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH
ASTM C 578 TYPE I REQUIREMENTS, AND EIA# GUIDELINE
SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS)
INSULATION BOARD.
2.04 SASECOAT
A. ONE -COMPONENT POLYMER MODIFIED CEMENTITIOUS
BASE COAT WITH FIBER REINFORCEMENT AND LESS THAN 33%
PORTLAND CEMENT CONTENT BY WEIGHT.
2.05 REINFORCING MESHES
A STANDARD MESH
1. MESH -NOMINAL 4,5 oNstiyd.(163 glsR.meter),
SYMMETRICAL, INTERLACED OPEN -WEAVE GLASS FIBER
FABRIC MADE WITH MINIMUM 25 PERCENT BY WEIGHT
ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH
DRYVIT MATERIALS.
S. HIGH IMPACT MESH
1. INTERMEDIATE MESH (MESH C)- NOMINAL 11.0 celK.yc.
HIGH IMPACT, INTERWOVEN, OPEN WEAVE GLASS FIBER
FABRIC WITH ALKALINE RESISTANT COATING FOR
COMPATIBILITY WITH ORWIT MATERIALS.
2.06 PRIMER
A. PRIMER
ACRYLIC BASED PRIMER (FOR ACRYLIC BASED FINISHES)
2.07 FINISH COAT
A. ACRYLIC BASED TEXTURED WALL COATING. SEE EJ.F.S.
FORMULAS FOR FINISH COLOR.
2.06 JOB MIXED INGREDIENTS
A. PORTLAND CEMENT: ASTM C 150, TYPE 1.
B. WATER: CLEAN AND POTABLE.
PART 3 EXECUTION
A. UNDER NO CIRCUMSTANCES SHALL ANY OF THE PRODUCTS BE
ALTERED BY ADDING ANY ADDITIVES, EXCEPT FOR SMALL AMOUNTS
OF CLEAN WATER AS DIRECTED ON LABEL. ANTIFREEZE,
ACCELERATORS, RAPID BINDERS, ETC., ARE FORBIDDEN.
S. THE SURFACE TO RECEIVE THE EIFS SHALL BE STRUCTURALLY
SOUND, CLEAN, DRY AND FREE OF WARPAGE, RESIDUAL MOISTURE
OR DAMAGE FROM MOISTURE. SURFACES SHALL BE UNIFORM, WITH
NO IRREGULARITIES GREATER THAN 118' In 4'-0'. SURFACES SHALL BE
INSPECTED FOR COMPLIANCE WITH THE FOLLOWING REQUIREMENTS
PRIOR TO INSTALLATION OF THE EIFS:
1. PLYWOOD SHEATHING SHALL MEET A.P.A.(AMERICAN
PLYWOOD ASSOCIATION) REQUIREMENTS FOR EXTERIOR OR
EXPOSURE 1 CLASSIFICATION. APA DESIGN AND
CONSTRUCTION GUIDELINES SHALL BE FOLLOWED FOR
STORAGE, HANDLING AND INSTALLATION. MANUFACTURERS
PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR
SHALL BE FOLLOWED FOR STORAGE, HANDLING, STORAGE,
HANDLING, INSTALLATION AND PROTECTION. ANY SHEATHING
NOT IN COMPLIANCE SHALL BE REPLACED TO CONFORM WITH
SPECIFICATION REQUIREMENTS PRIOR TO INSTALLATION OF
THE EIFS,
2, CONCRETE, MASONRY OR PLASTER SURFACES SHALL BE
PROPERLY CURED AND FREE OF DIRT, DUST, OIL, GREASE,
MILDEW, FUNGUS. LATENCY, PAINT, EFFLORESCENCE AND
ANY OTHER CONTAMINANT. ANY SURFACES NOT IN
COMPLIANCE SHALL BE CORRECTED PER MANUFACT.
RECOMMENDATIONS PRIOR TO INSTALLATION OF THE EIFS.
C. AFTER SATISFACTORY INSPECTION OF SURFACES AND
CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION
REQUIREMENTS, THE EIFS INSTALLATION MAY BEGIN PER
MANUFACTURER'S INSTRUCTIONS.
D. THE STARTER STRIP OF MESH SHALL BE WIDE ENOUGH TO
ADHERE 4" OF MESH ONTO THE WALL, BE ABLE TO WRAP AROUND THE
BOARD EDGE AND COVER APPROXIMATELY 4- ON THE OUTSIDE
SURFACE OF THE BOARD. THIS SACKWRAP" PROCEDURE SHALL BE
FOLLOWED AT ALL EXPOSED BOARD EDGES IN ACCORDANCE WITH
DETAILS (EXAMPLE -WINDOW AND DOOR HEADS AND JAMBS).
ALL AREAS WHERE THE EIFS MEETS DISSIMILAR MATERIAL OR
TERMINATES (FOR EXAMPLE, WINDOW AND DOOR FRAMES) SHALL
HAVE THE INSULATION BOARD CUT BACK FROM THE ADJOINING
MATERIAL A MINIMUM OF 114" TO FORM AN ISOLATION JOINT.
E. APPLY THE ADHESIVE TO THE BACK OF THE INSULATION BOARD.
STAGGER VERTICAL JOINTS AND INTERLOCK BOARDS AT ALL INSIDE
AND OUTSIDE CORNERS. APPLY FIRM PRESSURE OVER ENTIRE
SURFACE OF THE BOARDS TO INSURE UNIFORM CONTACT. BOARDS
SHALL BRIDGE SHEATHING JOINTS BY A MINIMUM OF 8', ALL BOARD
JOINTS SHALL BE BUTTED TIGHTLY TOGETHER TO ELIMINATE ANY
THERMAL BREAKS IN THE EIFS. CARE MUST BE TAKEN TO PREVENT
ANY ADHESIVE FROM GETTING BETWEEN THE JOINTS OF THE
BOARDS. ALL OPEN JOINTS IN THE INSULATION BOARD LAYER SHALL
BE FILLED WITH SLIVERS OF INSULATION OR AN APPROVED SPRAY
FOAM.
F. NAILS, SCREWS, OR ANY OTHER TYPE OF NONTHERMAL
MECHANICAL FASTENER SHALL NOT BE USED.
G. EXPANSION JOINTS ARE REQUIRED IN THE EIFS WHERE THEY
EXIST IN THE SUBSTRATE, WHERE THE EIFS ADJOINS DISSIMILAR
CONSTRUCTION, AND AT FLOOR LINES IN MULTILEVEL WOOD FRAME
CONSTRUCTION. THE EIFS SHALL TERMINATE AT THE EXPANSION
JOINT TO PROVIDE APPROPRIATE JOINT SIZE (SEE DETAILS) AND ALL
BOARD EDGES SHALL BE COATED WITH APPROPRIATE GROUND COAT
AND MESH IN ACCORDANCE WITH STANDARD'9ACKWRAPPING'
PROCEDURE. APPROPRIATE SEALANT/PRIMER AND BACKER SHALL BE
INSTALLED AFTER GROUND COAT IS FULLY DRY TO PREVENT ANY
WATER FORM GERING INTO OR BEHIND THE SYSTEM.
H. USE OF PLASTIC OR METAL CORNER BEADS, STOPBEADS, ETC, IS
FORBIDDEN.
I. APPLY APPROPRIATE GROUND COAT OVER THE INSULATION BOARD
WITH PROPER SPRAY EQUIPMENT OR A STAINLESS STEEL TROWEL TO
A UNIFORM THICKNESS OF APPROXIMATELY Ill W. WORK
VERTICALLY IN TRIPS OF 40" AND IMMEDIATELY
EMBED STANDARD REINFORCING
E S
TH
EMBED STANDARD REINFORCING MESH INTO THE WET GROUND GOAT.
THE MESH SHALL BE DOUBLE WRAPPED AT ALL CORNERS AND
OVERLAPPED NOT LESS THAN FINISH
AT MESH JOINTSAVOID
GR
WRINKLES IN THE MESH. TT FINISHTHICKNESS EM THE GROUND
COAT SHALL T SUCH THATTHE MESH ISFULLY EMBEDDED.ALLOW
GROUND COAT TO THOROUGHLY DRV BEFORE APPLYING PRIMER OR
FINISH.
J. DUPLICATE INSTALLATION PROCESS NOTED IN 3.01 M USING
STANDARD MESH CREATING SECOND MESH LAYER AND ADDITIONAL
IMPACT RESISTANCE, ALLOW TO DRY BEFORE APPLICATION OF
EITHER STO PRIMER (OPTIONAL) OR STO FINISH.
K. IF A PRIMER IS USED, APPLY WITH BRUSH, ROLLER OR PROPER
SPRAY EQUIPMENT OVER CLEAN, DRY GROUND COAT AND ALLOW TO
DRY THOROUGHLY BEFORE APPLYING FINISH. P. APPLY FINISH
Q IRECTLY OVER THE GROUND COAT (OR PRIMED GROUND COAT)
ONLY AFTER THE GROUND COATIPRIMER HAS THOROUGHLY DRIED,
THE FINISH SHALL BE APPLIED BY SPRAYING, ROLLING OR TROWELING
WITH A STAINLESS STEEL TROWEL, DEPENDING ON FINISH SPECIFIED.
GENERAL RULES FOR APPLICATION OF FINISHES ARE AS FOLLOWS:
1. USE A CLEAN, RUST -FREE, HIGHSPEED MIXER TO
THOROUGHLY STIR THE FINISH TO A UNIFORM CONSISTENCY
(SMALL AMOUNTS OF CLEAN WATER MAY BE ADDED TO AID
WORKABILITY,
2. AV010 AP UCATION IN DIRECT SUNLIGHT.
3. APPLY FINISH IN A CONTINUOUS APPLICATION, ALWAYS
WORKING TO A WET EDGE.
4. WEATHER CONDITIONS AFFECT APPLICATION AND DRYING
TIME. HOT OR DRY CONDITIONS LIMIT WORKING TIME AND
ACCELERATE DRYING AND MAY REQUIRE ADJUSTMENTS IN
THE SCHEDULING OF WORK TO ACHIEVE DESIRED RESULTS:
COOL OR DAMP CONDITIONS EXTEND WORKING TIME AND
RETARD DRYING AND MAY REQUIRE ADDED MEASURES OF
PROTECTION AGAINST WIND, DUST, DIRT, RAIN AND FREEZING.
S. AESTHETIC'U`-GROOVES MAYBE DESIGNED INTO THE
SYSTEM. (A MINIMUM OF 314" INSULATION BOARD MUST BE
LEFT AFTER ANY GROOVES ARE CUT).
B. -W (FILLED TEXTURE) FINISHES MUST BE FLOATED WITH
PLASTIC TROWEL TO ACHIEVE THEIR RILLED TEXTURE.
7. AVOID INSTALLING SEPARATE SATCHES OF FINISH
SIDE-BYSIDE.
8. APPLY FINISH COLOR TO EIFS MIX AND APPLY TO WALL.
COLOR TO MATCH EXTERIOR FINISH SCHEDULE COLORS.
L. EXTERIOR INSULATION AND FINISH TEXTURE SYSTEM: APPLY HIGH
IMPACT SYSTEM ADJACENT TO DOORS FOR ADDITIONAL IMPACT
RESISTANCE, USING INTERMEDIATE MESH. USE THE STANDARD
SYSTEM SPECIFICATIONS AT ALL OTHER LOCATIONS.
0
AWNING SUPPORTS AT
4'-O" O.C. AND AT EACH
END
-0 i93 AFF.
T.O. PARAPET
,FRONT ELEVATION (EAST
T.O.PARAPET
20'-10" AFF
P- RTU -#1
10
T.O. PARAPET
B'-2" AFF
8"x12" 20 GALV. METAL
CONDUCTOR HEAD W/
OVERFLOW. PROVIDE 4"x4"22
GA. DOWN SPOUT. POINT TO -
MATCH BUILDING ELEVATION
COORD. WV CIVIL
DRAWINGS FOR
CONTINUATION
REAR ELEVATION (WEST)
A5
3/16"=1'-0"
FRAMING
SUBSTRATE
CODE APPROVED WATER
RESISTIVE BARRIER,
BY OTHERS
ORYATAPPROVEDWASHER
WITH CORROSION RESISTANT
FASTENER
DRYVR DRAINAGE MAT
EPS INSULATION BOARD
DRYVIT GENESASeSASE COAT
DRYYR REINFORCING MESH
ORYVIT GENESIS BASE CWT
ORYATFINISH
DRAINAGE MAT
sysL TEM 11 Oulsulattan LCMD optionl as menuf by DrM
3A TYP. EIFS DETAIL
As.o NTS
F£RMALATH t0oc aR 34 h�eP p-
pyMpEu 1ArAL LATH
SEIERGYSTUCCOBASE�
:_ _';�TaRrw Prt•6YIDPI[
_x _-Sr FalSHCWT�
�.nG O=J+no0.x�.FP 5al=.Eo
0
WALL MOUNTED SIGN AND FRAMING
AS SHOWN: IL -27 ILLUMINATED
LETTERS BUILDING SIGN
TEMP.
TEMP.C-1
TEMP.
TEMP.
-
COUPLE HOSE
Finish l Notes
CYD
CONNEC70R8
--I
L�
l�
- DRAIN VALVE AT
P-8
GREASE &CO2
FRYERS. RUN
OWWANISCOTACCENT
TANKS
SELF -DRAINING PIPE
COORD.W/CIVIL
BYVENDOR
EXHAUST
FAN HEF :
ELEC. C.T. CABINET,
(VERIFY WI LOCAL CODE
THE REO'D. LOCATION
& MOUNTING HEIGHT)
TOTAL OF 4 EQ.
WINDOWS W/
MULLIONS
BAND
T.O. PARAPET
20'-10" AFF. 00
T.O. PARAPET
18'-2" AFF.
SW-
T.O. PARAPET -`
19'-6" AFF.
30 TYP. STUCCO DETAIL
ASD N'S ALTERNATE
OUBLE LOUVER
L SHUTTER
'ACE GAP
FRAME,
TED EPA
EXTERIOR FINISH NOTES
STO COLORS
NA1MOI 6 - DELIGHTFUL GOLDEN
NAOI-0061 - EXOTIC RED
NA10.0017 - MOCHA BROWN
DRWIT COLORS
POPE051020- DELIGHTFUL GOLDEN
POPED21028S - EXOTIC RED
POPE031020S - MOCHA BROWN
E.I.F.S. WALL TEXTURE FINISH
AllTexture
STO STOESSENCE SWIRL
DRYVR QUARTZ PUTZ
FINISH NOTES
THE FOLLOWING COMPONENTS CAN BE PURCHASED
FROM THE APPROVED SIGN VENDORS:
' STANDING SEAM ROOF
• BALCONY RAILING
• CLEARANCE BAR
• MENU CANOPY
` GUARD RAIL
• AWNINGS
SHUTTERS
DUMPSTERGATES
INTERIOR LADDER
' ENCLOSURE GATE
THE FaOWING COMPONENTS TO BE MANUFACTURED
AND INSTALLED BY THE GENERAL CONTRACTOR
• EXTERIOR LADDER
POCETE! LOORIANA KITCHEN I EXTERIOR FINISH SCHEDULE I
Mark
1
_
v
PROVIDE QUICK
M4tetlal
-
COUPLE HOSE
Finish l Notes
CYD
CONNEC70R8
--I
L�
l�
- DRAIN VALVE AT
P-8
GREASE &CO2
FRYERS. RUN
OWWANISCOTACCENT
TANKS
SELF -DRAINING PIPE
COORD.W/CIVIL
BYVENDOR
FROM FRYERS TO
DRAWINGS FOR
TRIM
OUTSIDE
CONTINUATION
COLLECTION UNIT.
30 TYP. STUCCO DETAIL
ASD N'S ALTERNATE
OUBLE LOUVER
L SHUTTER
'ACE GAP
FRAME,
TED EPA
EXTERIOR FINISH NOTES
STO COLORS
NA1MOI 6 - DELIGHTFUL GOLDEN
NAOI-0061 - EXOTIC RED
NA10.0017 - MOCHA BROWN
DRWIT COLORS
POPE051020- DELIGHTFUL GOLDEN
POPED21028S - EXOTIC RED
POPE031020S - MOCHA BROWN
E.I.F.S. WALL TEXTURE FINISH
AllTexture
STO STOESSENCE SWIRL
DRYVR QUARTZ PUTZ
FINISH NOTES
THE FOLLOWING COMPONENTS CAN BE PURCHASED
FROM THE APPROVED SIGN VENDORS:
' STANDING SEAM ROOF
• BALCONY RAILING
• CLEARANCE BAR
• MENU CANOPY
` GUARD RAIL
• AWNINGS
SHUTTERS
DUMPSTERGATES
INTERIOR LADDER
' ENCLOSURE GATE
THE FaOWING COMPONENTS TO BE MANUFACTURED
AND INSTALLED BY THE GENERAL CONTRACTOR
• EXTERIOR LADDER
POCETE! LOORIANA KITCHEN I EXTERIOR FINISH SCHEDULE I
Mark
' Location
SWPINN III
M4tetlal
Specification
Color
Finish l Notes
CYD
MAN WALL SURFACE
--I
L�
l�
I
�y
v
�-I
TSI
EP -1
OWWANISCOTACCENT
�i
PANTOREFSFORMUTA
#2 M30
DELIGHTFUL OLDEN
Ulnaepec Satin
lrT�,1
F�
TRIM
CROWN/ WAIL SURFACE
EP -2
ACCENTIWAINSCOT
BENJAMIN MOORE
PNNTOR EIFS FORMULA
#20813-10
EXOTIC RED
UBraspec Satin
ACCENT TRIM
EP4
WAINSCOT BELOW
EFS/METAL/PAINT #2107-20 MOCHABROWN
Utrsspec Shin
CENT TRWAMREAR BLDG
14.10x00'MNYL SHUTTERS
Beknn
L2 VINYL
UNFINISHED
030-PAINTABLE
SHUITERCONTRACTOR.COM
251 17k 1B"MNYL
L78 -VINYL
UNFINISHED
030-PANTPBLE
EPJ
SHIIITTERS
SHUTTERS Buldin
BENJAMIN MOORE
PAINT
02040-10
RANFOREST FOLIAGE 170 Semi Gloss
EPS
DR.fHRU WIDOW
CONOPYANDRAUNGS
RPLNG VENDOR/TIGER DRYING
METALIPOWDERCOAT
RAL 6008
HUNTER GREEN SMOOTH
EP -5
BAYING VENDORI
METAL/PAINT #2040-10 RANFORESTFOLAGE
P-28DTMSeml Gloss
BENJAMIN MOORE
EP4i
STORE FRONT GLAZING
YKK PP
ANODIZED ALUMINUM
#YBSN
DARK BRONZE
21-28 DAYS
EPE
STORE FRONT GLAZING
READY MSX
BRONZETONE
P-28 DTM Be.] Go..
SENJPMIN MORE
METAL/PAINT
#2107-20
MOCHABROWN
Uftravpec Selin
EP -7
DIIFSTER WALLS/ GATES
EP -8
SOWARDS
METAL/ASPHALTIPAINT SAFETY &ZONE RMSAFETYYELLOW
PS&1O
ACRYLIC MARKING
SN'l
BORAL STONE
VERSETTA SM7JLATED
LEDGESTONE
PLUME CREEK
MON-OVERLAPPING
STOLE WANSCOT
STONE VENEER
QUIKRETE
VENEER STONE MORTAR
POLYMER MODIFIED
MOCHABROWN
1137-85
Sc -1
GLI
GRATE OPT.
AWNING SUPPLER
METAL/POWDER COAT
RAL 8008
HUNTER GREEN
SMOOTH
C-1
STANDING SEAM CANOPY
COPPER SALES, NC.
UNA-CLAD
UC4 ALUMINUM
RECvLLRED
12" OC I GLL4OE PER LOCAL
CODE REQUIREMENTS
JOB NUMBER
P16-101
DATE
06-14-2016
SHEET 1
OF 2 SHEETS
�E`ll __j
NOT VALID WITHOUT SEAL AND
ORIGINAL SIGNATURE
FOR CONSTRUCTION
DATE:
9101 � I Nnr
/W
CYD
r
h+
--I
L�
l�
I
�y
v
�-I
TSI
�i
Ln
JOB NUMBER
P16-101
DATE
06-14-2016
SHEET 1
OF 2 SHEETS
�E`ll __j
NOT VALID WITHOUT SEAL AND
ORIGINAL SIGNATURE
FOR CONSTRUCTION
DATE:
9101 � I Nnr
W
LnO
lrT�,1
F�
Fri
c'n
JOB NUMBER
P16-101
DATE
06-14-2016
SHEET 1
OF 2 SHEETS
�E`ll __j
NOT VALID WITHOUT SEAL AND
ORIGINAL SIGNATURE
FOR CONSTRUCTION
DATE:
9101 � I Nnr