HomeMy WebLinkAboutZ-5105-A Staff AnalysisTLE NO.: Z -5105 -
NAME: HINSON PARK ADDITION -- AMENDED SHORT -FORM PLANNED
DEVELOPMENT -OFFICE
LOCATION: On the east side of Hinson Loop Rd., approximately 200
feet south of Hinson Rd.
DEVELOPER:
ENGINEER:
Jim Irwin Pat McGetrick
THE IRWIN CO. MCGETRICK ENGINEERING
10800 Financial Center Parkway 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
225-5700 223-9900
AREA: 2 ACRES NUMBER OF LOTS: 4 FT. NEW STREET: 0
ZONING• PCD
PLANNING DISTRICT: 2
CENSUS TRACT: 22.05
PROPOSED USES: Offices
VARIANCES REQUESTED: Approval of access to the interior lots by
way of an access easement.
BACKGROUND:
A PCD was approved by the Planning Commission for a site which
includes the subject property on January 3, 1989, then, on
February 7, 1989, the Board of Directors approved Ordinance No.
15,635 which established the PCD. The approved site plan shows a
free-standing building at the corner of Hinson Dr. and Hinson
Loop Dr. The area associated with this building was shown as Lot
1 of the preliminary plat, and was a 3/4 acre site. To the south
an "Ll' shaped strip office and commercial center was shown of an
area designated at Lot 2 of the preliminary plat. The free-
standing building was subsequently built and a final plat for Lot
1 was filed. This building was approved for and is used for
offices. The second building was never constructed, and the land
where it was to have been located was left undeveloped. This "L"
shaped building was to have had a mixture of office and
commercial uses, with a predominance of office uses, and with a
restriction for office uses only on the south side of the
development abutting residential uses. A 25 foot wide access
easement straddling the Lot 1 -Lot 2 property line was show in the
preliminary plat of the original subdivision of the property;
however, the final plat of Lot 1 does not indicate the north half
of the access easement as being provided for.
FILE NO.: Z -5105L -A Cont.
STATEMENT OF PROPOSAL:
The applicant proposes to: 1) subdivide the 2 -acre tract into 4
lots; then, 2) amend the POD to change the use to exclusively
office uses. The two lots fronting on Hinson Loop Rd. are each
to be approximately 0.52 acres each. Two lots are proposed to be
interior lots, and are to be approximately 0.45 acres each. Each
of the lots is proposed to contain one building (the two building
closest to Hinson Loop being 60 feet by 80 feet, or 4,800 square
feet each; the two interior buildings being 60 feet by 100 feet,
or 6,000 square feet each). Parking for 95 vehicles is to be
provided on-site. Access to the two interior lots is to be by
way of access easements from Hinson Loop Rd. The required
dedication of additional right-of-way and construction of
required Master Street Plan improvements for Hinson Loop Rd. are
proposed. Approval of access to the interior lots by way of
access easements from Hinson Loop Road is requested.
A. PROPOSALRE ❑EST:
Review by the Planning Commission and approval by the Board
of Directors is requested for an amended POD to modify the
approved site plan and list of approved uses, and to permit
access to the interior lots by way of an access easement.
B. EXISTING CONDITIONS:
The site is currently undeveloped and heavily wooded.
The existing zoning of the site is PCD. The site was part
of a larger PCD site which includes land to the north at the
corner of Hinson Loop Rd. and Hinson Rd. Land at the
northeast corner of the site is zoned 0-3, as is land to the
west across Hinson Loop Rd. Land to the south and east is
zoned R-5 and is the location of a large apartment
development.
C. ENGINEERING UTILITY COMMENTS:
The Public works staff comments that: 1) there some
technical matters on the proposed plat which need to be
addressed; 2) street improvements with sidewalks are
required by the Master Street Plan; 3) a stormwater
detention analysis must be provided; 4) a grading permit
must be obtained prior to starting work on the site; 5) an
access easement must be provided for access to the interior
lots.
Water Works comments that a water main extension and on-site
fire protection are required. A pro -rata front footage
charge of $15.00/f000t applies along Hinson Loop Rd.
PA
FILE O.: Z- 1 -A Cont.
Wastewater comments that sewer main extensions, with
easements, will be required.
Arkansas Power and Light Co. did not provided comments.
Southwestern Bell Telephone Co. approved the submittal
without comment.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
The Fire Department commented that on-site fire hydrants
will be required.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
The Neighborhoods and Planning staff comments:
A) Sec. 36-456 requires that a statement describing the
character of the development, and including the
rationale behind the assumptions and choices made, be
provided. This has not been done, and this "Project
Narrative" is essential. The project narrative should
address the development schedule, signage and lighting,
etc.
2) Sec. 36-456 requires that the proposed treatment of the
perimeter of the property be addressed, and that a
schematic landscaping plan be submitted. These
requirements are not met.
3) on the preliminary plat, the following needs to be
furnished: a) the type of subdivision is to be
identified; b) the name and address of the owner of
record, giving the source of title with book and page
number or instrument number, are required to be shown;
c) the minimum lot size is supposed to be quantified;
d) any existing covenants and restrictions are to be
identified; e) a vicinity map which correctly
identifies the project site; f) "natural features"
(drainage channels, bodies of water, wooded areas,
etc.) and "cultural features" (existing and plated
streets, bridges, culverts, utility lines, pipelines,
power transmission lines, easements, park areas,
structures, section lines, etc.) within and immediately
surrounding the proposed subdivision are to be shown;
g) the names of recorded subdivisions abutting the
proposed subdivision, with plat book and page number or
instrument number are to be shown, and for commercial
subdivisions the owners of all land contiguous to the
proposed subdivision are to be indicated; h) adequate
physical descriptions are to be provided for all
monuments, indicating the size, type of materials, and
construction of monuments; i) the zoning
3
FILE O.: Z- 1 5-A Cont.
classifications within the plat and of abutting areas
are to be shown; and, j) the certifications are to be
executed indicating that the survey has been filed with
the office of the State Surveyor.
4) Sec. 31-89 requires a preliminary storm drainage plan
be provided. This has not been submitted.
5) Sec. 31-231 states that "Every lot shall abut upon a
public street, except where private streets are
explicitly approved by the Planing Commission." Sec.
31-207 says that private streets for non-residential
use shall be discouraged; however, that the planning
commission may approve them for limited use when the
design standards of this chapter are used as a basis
for review. The section continues, adding that the
developer shall demonstrate that the street system can
adequately serve the needs of public service vehicles
for access, turning radius, and clearance of other
improvements with the access easement. The design of -
non -residential private streets shall, the section
continues, provide for access to a public right of -way
as required for private driveways. The developer is to
provide for the permanent maintenance of the street and
infrastructure improvements.
There is apparently a question about the existence of a
mutual access easement which was shown to be located
along the common property line of Lot 1 and Lot 2.
Since the current developer proposes to use the common
driveway with Lot 1 to provide access to the site, the
existence of a cross -access agreement needs to be
verified.
There is a second access easement indicated which lies
along the interior lot lines between the new lots on
the south and the lots on the north.
The existing subdivision is named "Hinson Corners
Subdivision", and shows Lots 1 and 2. The new
subdivision is a subdivision of what was shown on the
original preliminary plat as Lot 2. The new
subdivision, named "Hinson Park Addition" has Lots 1-4.
6) Landscape review comments that, since the right-of-way
along Hinson Loop has been moved eastward, the proposed
buffer drops below the average width requirement of 16'
(10.5' minimum with transfer) parallel with the street.
Also, the south side of the proposed parking lots
project over the minimum 6' required buffer required by
Ordinance. The average buffer width required along the
southern perimeter is 13' (9' minimum with transfer).
The Landscape Ordinance requires a minimum of 4'. A 6'
high opaque screen, either a wood "good neighbor" fence
4
FILE NO.; Z-51 -A C nt.
or dense evergreen plantings, is required along the
eastern and southern site perimeters. Curb and gutter
or another approved border will be required to protect
landscaped areas from vehicular traffic.
7) The Planning staff reports that the change from a mixed
office and commercial use to an exclusively office use
development is supported.
E. ANALYSIS•
Critical elements of the submittal are missing: the cover
letter/project narrative; the landscaping plan; and
substantial information required on the preliminary plat.
The private interior street, in access easements, serve only
a 3 -acre tract (2 acres in the subject tract, plus 1 acre in
the developed tract). As long as the street plans meet
Public works design standards, the private street system is
acceptable.
F. STAFF RECOMMENDATIONS:
The staff recommends approval of the amended PD -O, and
recommends approval of the access easement to provide the
required access to the interior lots, subject to the
applicant submitting the required cover letter/project
narrative and completing the exhibits.
SUBDIVISION COMMITTEE COMMENT: (APRIL 27, 1995)
Mr. Pat McGetrick, the project engineer, was present. Staff
presented the proposal, and the Committee reviewed with Mr.
McGetrick the comments contained in the discussion outline. Mr.
McGetrick indicated that he would address the issues raised, and
the Committee forwarded the item to the full Commission for the
public hearing.
PLANNING COMMISSION ACTION: (MAY 16, 1995)
Staff reported that all issues had been resolved, and staff
recommended approval of the PD -0 and the requested variance to
permit access to the interior lots by way of an access easement.
The item was included on the Consent Agenda for approval, and was
approved with the approval of the Consent Agenda with the vote of
11 ayes, 0 nays, 0 abstentions, and 0 absent.
5
May 16, 1995
ITEM N FILE NO.: Z- 105-A
NAME: HINSON PARK ADDITION -- AMENDED SHORT -FORM PLANNED
DEVELOPMENT -OFFICE
LOCATION: On the east side of Hinson Loop Rd., approximately 200
feet south of Hinson Rd.
DEVELOPER: ENGINEER:
Jim Irwin Pat McGetrick
THE IRWIN CO. MCGETRICK ENGINEERING
10800 Financial Center Parkway 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
225-5700 223-9900
AREA: 2
ACRES
NUMBER OF LOTS: 4
FT. NEW STREET: 0
ZONING:
PCD
PROPOSED USES:
Offices
PLANNING DISTRICT: 2
CENSUS TRACT: 22.05
_VARIANCES REQUESTED: Approval of access to the interior lots by
way of an access easement.
BACKGROUND:
A PCD was approved by the Planning Commission for a site which
includes the subject property on January 3, 1989, then, on
February 7, 1989, the Board of Directors approved Ordinance No.
15,635 which established the PCD. The approved site plan shows a
free-standing building at the corner of Hinson Dr. and Hinson
Loop Dr. The area associated with this building was shown as Lot
1 of the preliminary plat, and was a 3/4 acre site. To the south
an "L" shaped strip office and commercial center was shown of an
area designated at Lot 2 of the preliminary plat. The free-
standing building was subsequently built and a final plat for Lot
1 was filed. This building was approved for and is used for
offices. The second building was never constructed, and the land
where it was to have been located was left undeveloped. This "L"
shaped building was to have had a mixture of office and
commercial uses, with a predominance of office uses, and with a
restriction for office uses only on the south side of the
development abutting residential uses. A 25 foot wide access
easement straddling the Lot 1 -Lot 2 property line was show in the
preliminary plat of the original subdivision of the property;
however, the final plat of Lot 1 does not indicate the north half
of the access easement as being provided for.
May 16, 1995
SUBDIVISION
ITEM NO.: 9 Cont.) FILE NO.: Z -5105-A
TATEME T OF PROPOSAL:
The applicant proposes to: 1) subdivide the 2 -acre tract into 4
lots; then, 2) amend the POD to change the use to exclusively
office uses. The two lots fronting on Hinson Loop Rd. are each
to be approximately 0.52 acres each. Two lots are proposed to be
interior lots, and are to be approximately 0.45 acres each. Each
of the lots is proposed to contain one building (the two building
closest to Hinson Loop being 60 feet by 80 feet, or 4,800 square
feet each; the two interior buildings being 60 feet by 100 feet,
or 6,000 square feet each). Parking for 95 vehicles is to be
provided on-site. Access to the two interior lots is to be by
way of access easements from Hinson Loop Rd. The required
dedication of additional right-of-way and construction of
required Master Street Plan improvements for Hinson Loop Rd. are
proposed. Approval of access to the interior lots by way of
access easements from Hinson Loop Road is requested.
A. PROPOSAL RE UEST:
Review by the Planning Commission and approval by the Board
of Directors is requested for an amended POD to modify the
approved site plan and list of approved uses, and to permit
access to the interior lots by way of an access easement.
B. EXISTING CONDITIONS:
The site is currently undeveloped and heavily wooded.
The existing zoning of the site is PCD. The site was part
of a larger PCD site which includes land to the north at the
corner of Hinson Loop Rd. and Hinson Rd. Land at the
northeast corner of the site is zoned 0-3, as is land to the
west across Hinson Loop Rd. Land to the south and east is
zoned R-5 and is the location of a large apartment
development.
C. ENGINEERING/UTILITY COMMENTS:
The Public Works staff comments that: 1) there some
technical matters on the proposed plat which need to be
addressed; 2) street improvements with sidewalks are
required by the Master Street Plan; 3) a stormwater
detention analysis must be provided; 4) a grading permit
must be obtained prior to starting work on the site; 5) an
access easement must be provided for access to the interior
lots.
Water Works comments that a water main extension and on-site
fire protection are required. A pro -rata front footage
charge of $15.00/f000t applies along Hinson Loop Rd.
2
May 16, 1995
dj�IMKOW
ITEM NO.; 9 (Cont ) FILE N Z -5105 -
Wastewater comments that sewer main extensions, with
easements, will be required.
Arkansas Power and Light Co. did not provided comments.
Southwestern Bell Telephone Co. approved the submittal
without comment.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
The Fire Department commented that on-site fire hydrants
will be required.
D. ISSUESZLEGALITECHNICALIDESIGN:
The Neighborhoods and Planning staff comments:
1) Sec. 36-456 requires that a statement describing the
character of the development, and including the
rationale behind the assumptions and choices made, be
provided. This has not been done, and this "Project
Narrative" is essential. The project narrative should
address the development schedule, signage and lighting,
etc.
2) Sec. 36-456 requires that the proposed treatment of the
perimeter of the property be addressed, and that a
schematic landscaping plan be submitted. These
requirements are not met.
3) on the preliminary plat, the following needs to be
furnished: a) the type of subdivision is to be
identified; b) the name and address of the owner -of
record, giving the source of title with book and page
number or instrument number, are required to be shown;
c) the minimum lot size is supposed to be quantified;
d) any existing covenants and restrictions are to be
identified; e) a vicinity map which correctly
identifies the project site; f) "natural features"
(drainage channels, bodies of water, wooded areas,
etc.) and "cultural features" (existing and plated
streets, bridges, culverts, utility lines, pipelines,
power transmission lines, easements, park areas,
structures, section lines, etc.) within and immediately
surrounding the proposed subdivision are to be shown;
g) the names of recorded subdivisions abutting the
proposed subdivision, with plat book and page number or
instrument number are to be shown, and for commercial
subdivisions the owners of all land contiguous to the
proposed subdivision are to be indicated; h) adequate
3
May 16, 1995
SOHDIVI I
ITEM NO, - 9 (Cont.1 (ConFILE NO.: Z-51 -A
physical descriptions are to be provided for all
monuments, indicating the size, type of materials, and
construction of monuments; i) the zoning
classifications within the plat and of abutting areas
are to be shown; and, j) the certifications are to be
executed indicating that the survey has been filed with
the office of the State Surveyor.
4) Sec. 31-89 requires a preliminary storm drainage plan
be provided. This has not been submitted.
5) Sec. 31-231 states that "Every lot shall abut upon a
public street, except where private streets are
explicitly approved by the Planing Commission." Sec.
31-207 says that private streets for non-residential
use shall be discouraged; however, that the planning
commission may approve them for limited use when the
design standards of this chapter are used as a basis
for review. The section continues, adding that the
developer shall demonstrate that the street system can
adequately serve the needs of public service vehicles
for access, turning radius, and clearance of other
improvements with the access easement. The design of
non-residential private streets shall, the section
continues, provide for access to a public right of -way
as required for private driveways. The developer is to
provide for the permanent maintenance of the street and
infrastructure improvements.
There is apparently a question about the existence of a
mutual access easement which was shown to be located
along the common property line of Lot 1 and Lot 2.
Since the current developer proposes to use the common
driveway with Lot 1 to provide access to the site, the
existence of a cross -access agreement needs to be
verified.
There is a second access easement indicated which lies
along the interior lot lines between the new lots on
the south and the lots on the north.
The existing subdivision is named "Hinson Corners
Subdivision", and shows Lots 1 and 2. The new
subdivision is a subdivision of what was shown on the
original preliminary plat as Lot 2. The new
subdivision, named "Hinson Park Addition" has Lots 1-4.
6) Landscape review comments that, since the right-of-way
along Hinson Loop has been moved eastward, the proposed
buffer drops below the average width requirement of 16'
(10.5' minimum with transfer) parallel with the street.
Also, the south side of the proposed parking lots
4
May 16, 1995
52uiyTSipN
E.
F.
-5145--
project over the minimum 6' required buffer required by
Ordinance. The average buffer width required along the
southern perimeter is 13' (9' minimum with transfer).
The Landscape Ordinance requires a minimum of 4'. A 6'
high opaque screen, either a wood "good neighbor" fence
or dense evergreen plantings, is required along the
eastern and southern site perimeters. Curb and gutter
or another approved border will be required to protect
landscaped areas from vehicular traffic.
7) The Planning staff reports that the change from a mixed
office and commercial use to an exclusively office use
development is supported.
ANA_ Lam.
Critical elements of the submittal are missing: the cover
letter/project narrative; the -landscaping -plan; -and
substantial information required on the preliminary plat.
The private interior street, in
a 3 -acre tract (2 acres in the
the developed tract). As long
Public works design standards,
acceptable.
STAkF RECDMMENnATTONS:
access easements, serve only
subject tract. plus 1 acre in
as the street plans meet
the private street system is
The staff recommends approval of the amended PD -O, and
recommends approval of the access easement to provide the
required access to the interior lots, subject to the
applicant submitting the required cover letter/project
narrative and completing the exhibits.
UBDIVISION COMMITTEE COMMENT:
(APRIL 27, 1995)
Mr. Pat McGetrick, the project engineer, was present. Staff
presented the proposal, and the Committee reviewed with Mr.
McGetrick the comments contained in the discussion outline. Mr.
McGetrick indicated that he would address the issues raised, and
the Committee forwarded the item to the full Commission. for the
public hearing.
PLAITNTNG COMMTSSTON ACTION:
(MAY 16, 1995)
Staff reported that all issues had been resolved, and staff
recommended approval of the PD -O and the requested variance to
permit access to the interior lots by way of an access easement.
The item was included on the Consent Agenda for approval, and was
5
May 16', 1995
SUBDTVISION
ITEM NO.: Cont. FILE NO.: Z -5105-A
approved with the approval of the Consent Agenda with the vote of
11 ayes, 0 nays, 0 abstentions, and 0 absent.