HomeMy WebLinkAboutZ-5097-G Staff AnalysisJune 3, 2004
ITEM NO.: 8 FILE NO_: Z -5097-H
NAME: Chenal Valley Phase 2 Commercial Lot 3 Zoning Site Plan Review
LOCATION: South of Cantrell Road, East of Chenal Parkway
DEVELOPER:
Metropolitan National Bank
P.O. Box 8010
Little Rock, AR 72203
ENGINEER:
WD & D Architects
400 West Capitol Avenue
Little Rock, AR 72201
AREA: 1.41 Acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 1 FT. NEIN STREET: 0
C-3, General Commercial District, with a
condition of site plan review
19 — Chenal
42.11
VARIANCESMAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The applicant proposes the construction of a 3,500 square foot branch bank
facility on this previously platted lot. The proposed site plan includes the
development of four -covered drive through lanes. The applicant indicates the
days and hours the bank will operate are from 8:00 am to 5:00 pm Monday
through Friday and from 9:00 am to 12:00 noon on Saturday.
The proposed site plan indicates the maximum building height as twenty-eight
feet. The site plan also indicated signage will comply with the Chenal Parkway
Design Overlay District or a single monument style sign and a maximum of eight
feet in height and one hundred square feet in area.
June 3, 2004
SUBDIVISION
ITEM NO.: 8 Cont. FILE NO.: 2-5097-H
B. EXISTING CONDITIONS:
The site has been cleared for construction for the Wal-Mart Super Center.
Chenal Parkway, in this area, is a two-lane road and Cantrell Road is a four -lane
road with a center turn lane at the intersection of Chenal Parkway and Cantrell
Road. Boundary street improvements to Chenal Parkway are currently under
construction.
Other uses in the area include a Quick Stop Service Station on the northwest
corner and mini -warehouses on the northeast corner of Chenal Parkway and
Cantrell Road. The southwest corner is zoned C-3, General Commercial and is
currently undeveloped. Vacant 0-2 zoned property is located to the south of the
site with OS zoned property located between the office zoning and the single-
family residential located further southeast. South and west of the proposed
development are also single-family residences adjoining vacant 0-2 and C-2
zoned property across Chenal Parkway.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
residents who could be identified located within 300 -feet of the site, the Aberdeen
Court Property Owners Association, the Bayonne Place Property Owners
Association, the Margeaux Property Owners Association and the DuQuesne
Place Property Owners Association and all owners of property located within
200 -feet of the site were notified of the public hearing.
D. ENGINEERING COMMENTS:
Public Works:
1. All right-of-way and easement locations and widths were established with
previous plats. Boundary street improvements are under construction.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
3. Storm water detention requirements were addressed in a previous plat.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
2
June 3, 2004
SUBDIVISION
ITEM NO.: 8(Cont.)FILE NO.: 7-5097-H
Center -Point Ener : Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. Contact Central Arkansas Water at
992-2438 for additional details.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional information.
Counly Planning: No comment received.
CATA: No comment received.
F. ISSUESITECHN ICALIDES IGN:
Planning Division: No comment.
Landscaye: Areas set aside for buffer and landscaping meet with ordinance
requirements.
G. SUBDIVISION COMMITTEE COMMENT: (May 13, 2004)
Mr. Richard Powell was present representing the request. Staff noted the
request was an out parcel of the Wal-Mart site. Staff stated the Commission had
approved a plat for the proposed lot at their March 11,2004 Public Hearing.
Staff requested the applicant provide additional information concerning signage,
days and hours of operation and any proposed dumpster locations. Staff also
requested the applicant label all setbacks from the property lines.
Public Works comments were addressed. Staff noted the proposed plan met
with City requirements and staff was supportive of the indicated easements and
widths. Staff also noted boundary street improvements were currently under
construction on Chenal Parkway.
Landscaping comments were addressed. Staff noted the areas indicated as
buffer and landscaping met with ordinance requirements.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
3
June 3, 2004
SUBDIVISION
ITEM NO.: 8 Cont.) FILE NO.: 2 -5097-H
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the May 13, 2004, Subdivision Committee meeting. The applicant has
indicated a single monument style sign will serve the site consistent with the
Chenal/Financial Center Design Overlay District standard. The applicant has
indicated the sign will be a maximum of eight feet in height and one hundred
square feet in area. Staff is supportive of the proposed signage.
The applicant has indicted the days and hours of operation for the drive-through
facility as 8:00 am to 6:00 pm Monday through Friday. The applicant has
indicated the lobby hours as 8:30 am to 6:00 pm Monday through Friday and
from 9:00 am to Noon on Saturday. Staff is supportive of the indicated days and
hours of operation.
The proposed site plan indicates buffers and landscaping sufficient to meet
ordinance requirements. The applicant has indicated landscape areas will be
irrigated. Staff is supportive of the proposed landscaping plan.
The proposed site plan indicates nineteen parking spaces. Based on typical
minimum parking required for an office development the site would be require
eight parking spaces. The proposed parking exceeds the typical minimum
parking requirement.
The applicant has indicated the dumpster on the proposed site plan. The
dumpster will be located on the northeastern portion of the site, away from the
street. The site plan indicates the dumpster will be screened per the ordinance
or at least two feet above the finished grade of the container on at least three
sides. Staff is supportive of the proposed dumpster placement and screening.
The Chenal/Financial Center Design Overlay District requires all utilities located
within one hundred feet of the right-of-way be constructed underground. The
applicant has indicated all utilities will be constructed underground per the
ordinance requirement.
The applicant has indicated the minimum building setbacks on the proposed site
plan. The applicant has indicated a minimum front yard setback of ninety-five
feet and a minimum rear yard setback of thirty -feet. The ordinance typically
requires a front yard building line of twenty-five feet and minimum rear yard
setback of twenty-five feet. The indicated front and rear setbacks are more than
adequate to meet the minimum ordinance requirement. The lot is located
adjacent to an access and utility easement to the north and south. No side yard
setback is required for the proposed lot.
4
June 3, 2004
SUB )VISION
ITEM NO.: 8(Cont.)-FILE NO.: Z -5097-H
Staff is supportive of the proposed request. The applicant has indicated
development criteria consistent with the Chenal/Financial Center Design Overlay
District and sufficient to meet the minimum requirements for C-3, General
Commercial District zoned property. To staffs knowledge there are no
outstanding issues associated with the proposed request.
L STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
i
ITEM NO.: 8 FILE NO.: Z -5097-H
NAME: Chenal Valley Phase 2 Commercial Lot 3 Zoning Site Plan Review
LOCATION: South of Cantrell Road, East of Chenal Parkway
Planning Staff Comments:
1.
2.
1
r
3.
4.
5.
6.
7.
8.
Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
Provide details of any proposed signage on the proposed site plan
(heightlareallocation). Signage must comply with the Chenal Parkway Design
Overlay District or a maximum of eight feet in height and one hundred square feet in
sign area.
Provide more specific days and hours of operation in the General Notes section of
the proposed site plan.
Provide the maximum building height in the general notes section of the proposed
site plan.
Provide an existing survey of the site.
Will there be a dumpster located on the site? If so indicated the location along with
a note concerning the screening.
Site lighting must be low level and directional, directed inward away from
residentially zoned property.
Label all setbacks from property lines.
VariancelWaivers: None requested.
Pi ffi ir. Wnrks-
All right-of-way and easement locations and widths were established with previous
plats. Boundary street improvements are under construction.
A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any lard clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
Storm water detention requirements were addressed in a previous plat.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. Contact Central Arkansas Water at 992-
2438 for additional details.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3752 for additional information.
County Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
�] Landscape: Areas set aside for buffer and landscaping meet with ordinance
requirements.
Revised plat//plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, May 19, 2004.
March 11, 2004
ITEM NO.: 18 FILE NO.: Z -5097-G
NAME: Wal-Mart Revised Zoning Site Plan Review
LOCATION: On the Southeast corner of Cantrell Road and Chenal Parkway
DEVELOPER:
Wal-Mart Store, Incorporated
702 S.W: 8t" Street
Bentonville, AR 72716-0550
ENGINEER:
Carlson Consulting Engineers
7731 Highway 70, Suite 210
Bartlett, TN 38133
CURRENT ZONING: C-3, with conditions — General Commercial District with
site plan review.
ALLOWED USES: General Commercial
PROPOSED ZONING: C-3
PROPOSED USE: C-3, General Retail — Wal-Mart Super center
VARIANCESNVAIVERS REQUESTED: A variance to allow an off premise sign.
BACKGROUND:
On December 20, 1988, the Board of Directors adopted Ordinance No. 15,603, which
rezoned several tracts of land as a part of the Deltic Master Plan from Residential
zoning to various multi -family, office and commercial zoning districts. That action
rezoned 7.860 acres located at the southeast corner of Highway 10 and Chenal
Parkway from R-2 to C-3. The approval of the C-3 zoning was conditioned upon a site
plan review, by the Planning Commission, prior to development and a provision of a
40 -foot landscaped setback adjacent to Highway 10 and the Chenal Parkway.
Ordinance No. 16,459 rezoned additional properties contained within the proposed
Wal-Mart site. The Ordinance was approved by the Board of Directors on July 20,
1993, and rezoned 8.7051 acres from R-2 to C-3, General Commercial.
March 11, 2004
SUBDIVISION
ITEM NO.: 18 (Cont.) FILE NO.: Z -5097-G
Ordinance No. 18,628, adopted by the Board of Directors on January 2, 2002, rezoned
an additional 10.92 acres from R-2 to C-3, General Commercial. This area was to the
south of the C-3 zoned property and adjacent to Chenal Parkway. At the time of
rezoning the applicant also requested and was approved rezoning further south. The
zoning approved was 0-2 on 10 plus acres adjacent to the Parkway and 10 plus acres
of OS zoning nearer the single-family neighborhood to the east.
As a condition of the 1988 zoning, approximately six (6) acres of the site was subject to
site plan review. The applicant submitted a proposed site plan for review by the Little
Rock Planning Commission at their October 31,2002 Public Hearing. The Commission
approved the proposed site plan with a modification to the pole height of the proposed
lighting in the parking lot. The applicant intended to develop the 28.4 acres as a
210,396 square foot Wal-Mart Super center, associated parking and service areas. The
parking lot consisted of 988 parking spaces, including 24 handicap accessible parking
spaces.
Two driveways were to provide access to the proposed project from Cantrell Road and
two driveways from Chenal Parkway. The southernmost driveway on Chenal Parkway
would align opposite the existing Northfield Drive and is proposed to be signalized. This
drive would be a shared drive with the currently undeveloped property to the south
(zoned 0-2), thus helping to limit future access points on the Parkway. Improvements
would be provided on Chenal Parkway and Cantrell Road as coordinated with the City
of Little Rock.
The development was to be buffered from surrounding developments by the required
landscape buffer areas and internal landscaping. Additionally, the storm water
detention area was proposed to be located to the east of the building within the existing
Entergy easement. The addition of low height landscaping within the clear-cut area
would provide a visual enhancement to the Highway 10 Corridor. The placement of the
landscaping would provide a significant buffer to those properties lying to the east of the
development. Additionally, the OS zoned area to the south of the property would
provide a substantial buffer immediately south of the proposed Wal-Mart building. By
orienting the building to face Chenal Parkway, the building was located at the furthest
possible distance from those properties to the west and southwest of the development.
A. PROPOSAUREQUEST:
The applicant is now proposing to revise the previously approved Wal-Mart site
plan to remove a portion of the previously approved site plan and create a total of
four lots (Item No. 5 — File No. S-867-EEEEE), three related to the Wal-Mart site
and ownership. The applicant has indicated drives for ingress and egress will
remain as previously approved by the Commission on October 31, 2002. The
applicant has also indicated there will be no change in required buffer areas or
areas set-aside for landscape. The applicant is requesting a variance to allow
the placement of an off premise sign. The sign is located on Lot 4 of the
2
March 11, 2004
SUBDIVISION
ITEM NO.: 18 Cont. FILE NO.: Z -5097-G
proposed Chenal Valley Phase 2 Commercial Subdivision Revised Preliminary
Plat (Item No. 5 — File No. S-867-EEEEE).
B. EXISTING CONDITIONS:
The site has been cleared for construction of the Wal-Mart Super Center.
Chenal Parkway, in this area, is a two-lane road and Cantrell Road is a four -lane
road with a center turn lane at the intersection of Chenal Parkway and Cantrell
Road.
Other uses in the area include a Quick Stop Service Station on the northwest
corner and mini -warehouses on the northeast corner of Chenal Parkway and
Cantrell Road. The southwest corner is zoned C-3, General Commercial and is
currently undeveloped. There is an Entergy easement along the east property
line with a church located further to the east of the site. Vacant 0-2 zoned
property is located to the south of the site with OS zoned property located
between the office zoning and the single-family residential located further south
and east of the proposed development. South and west of the proposed
development are also single-family residences adjoining vacant 0-2 and C-2
zoned property.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Aberdeen Court Property Owners Association, the Bayonne Place Property
Owners Association, the Margeaux Property Owners Association, the Maywood
Manor Neighborhood Association and the DuQuesne Place Property Owners
Association and all owners of property located within 200 -feet of the site were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. No comment on revised site plan showing two additional out -parcel lots.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: Easements required. Contact Entergy for additional details.
Center -Point Ener : Approved as submitted.
SBC: No comment received.
3
March 11, 2004
SUBDIVISION
ITEM NO.: 18
FILE NO.: Z -5097-G
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. Contact Central
Arkansas Water at 992-2438 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECH NICAUD ESI GN:
Planning Division: No comment.
Landscape: All previous comment apply.
G. SUBDIVISION COMMITTEE COMMENT: (February 19, 2004)
Mr. Mike Dedman was present representing the request. Staff gave an overview
of the proposed development indicating the proposed site plan was being
submitted to remove the area designated as Lots 3 and 4 (S-867-EEEEE — Item
#5) from the previously approved site plan.
The proposed revision to the Wal-Mart site was discussed with the proposed
preliminary plat. Staff noted there were few outstanding issues related to the
proposed Wal-Mart site plan and requested notification of property owners as
required by the Planning Commission By -Laws. There was no further discussion
of the item. The Committee then forwarded the item to the full Commission for
final action.
H. ANALYSIS:
The applicant submitted a revised plan to Staff addressing most of the issues
raised at the Subdivision Committee meeting. As a part of the previous approval
the applicant has provided a copy of the lease agreement between Entergy
indicating the use of the eastern fifty feet of the Entergy right-of-way. The
agreement states "vegetation growth may not exceed 12 -feet in height" and that
"Entergy and its successors will not cut any trees, plants or natural vegetative
growth within the Green Belt Buffer if such would result in the buffer not being in
compliance with the applicable buffer ordinance of the City of Little Rock".
E
March 11, 2004
SUBDIVISION
ITEM NO.: 18 Cont. FILE NO.: Z -5097-G
As was previously approved the applicant has indicated interior islands of the
parking area will conform to the three hundred (300) square feet area
requirement.
The applicant has indicated access will be provided to the previously platted lot
(Lot 1 Chenal Valley Phase II Commercial Subdivision). The drive will be located
adjacent to Lot 1 and the Wal-Mart development will not take access from this
drive.
The applicant is proposing two ground -mounted signs. One is to be located at
the intersection of Chenal Parkway and Northfield Drive the second near the
primary drive from Cantrell Road. The sign proposed for Northfield Drive is
proposed at forty (40) square feet in area, well within the Chenal Overlay District
requirements for signage (maximum of eight (8) feet in height and one hundred
(100) square feet in area). The site will be located in a sign easement on Lot 4
of the proposed preliminary plat area (S-867-EEEEE — Item #5). The sign
proposed along Cantrell Road is proposed at six (6) feet in height and seventy-
two (72) square feet in area, complying with the Highway 10 Design Overlay
District requirements.
Site lighting has been addressed. The applicant has indicated 400 -watt metal
halide fixtures on 30 -foot black steel poles will provide site lighting. The applicant
states fixtures shall contain all horizontal bulbs with flat lenses to control glare
and over spill of lighting. The site plan states lights will be directed away from
adjoining properties and no floodlights will be used.
The applicant has indicated 988 parking spaces as part of the development. The
typical minimum parking required would be 701 spaces. The proposed parking is
more than sufficient to meet the typical minimum parking required by the Zoning
Ordinance.
The applicant has indicated all comments provided by Public Works will be
adhered to. The Traffic Engineer has determined road improvements will be
required as a part of the development. Chenal Parkway is to be widened to a
four (4) -lane roadway at the point when the traffic counts reach 12,000 cars per
day. A traffic signal will be installed at the intersection of Chenal Parkway and
Cantrell Road in the near future.
The landscaping, building setbacks and signage conform to all provisions of the
Chenal Overlay District and the Highway 10 Overlay District. Otherwise, to
Staff's knowledge, there are no outstanding issues associated with the proposed
site plan review. Staff is supportive of the proposed site plan and feels the
applicant has met the intent of the ordinance with regard to setbacks, buffer
requirements, landscaping requirements, parking ratios and all other technical
aspects of the ordinance.
I
u
March 11, 2004
SUBDIVISION
ITEM NO.: 18 Cont. FILE NO.: Z -5097-G
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
Staff recommends approval of the requested variance to allow an off premise
sign for the proposed development.
PLANNING COMMISSION ACTION: (MARCH 11, 2004)
The applicant was present representing the request. There were no registered
objectors present. Staff stated to their knowledge there are no outstanding issues
associated with the proposed request. Staff presented the item with a recommendation
of approval of the request subject to compliance with the conditions outlined in
paragraphs D, E and F of the above report.
Staff also presented a recommendation of approval of the requested variance to allow
an off premise sign for the proposed development.
There was no further discussion of the item. The item was placed on the Consent
Agenda and approved as presented by staff by a vote of 9 ayes, 0 noes and 2 absent.
E^
ITEM NO.: 18
NAME: Wal-Mart Revised Zoning Site Plan Review
FILE NO.: Z -5097-G
LOCATION: On the Southeast corner of Cantrell Road and Chenal Parkway
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing.
Variance/Waivers:
Public Works:
None requested.
1. No comment on revised site plan showing two additional out -parcel lots.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: Easements required. Contact Entergy for additional details.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. The Little Rock Fire Department needs to evaluate this
site to determine whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's expense. Contact
Central Arkansas Water at 992-2438 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
Plannina Division: No comment.
Landscape: All previous comment apply.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, February 25, 2004.