HomeMy WebLinkAboutZ-5040 Staff AnalysisJuly 12, 1988
SUBDIVISIONS
Item No. 12
NAME:
LOCATION:
Markham United Methodist
Church Conditional Use
Permi-t (Z-5040)
The northeast corner of
West Markham Street and
Ellis Drive (9820 W.
Markham Street).
O........... ...... ............. .
Church/David W. Kennedy
PROPOSAL:
..............
To obtain a Conditional Use Permit to allow for a temporary
wood frame classroom building (1,280 square feet) and a
daycare (50 -capacity) and a master site plan that includes
future construction of two-story classrooms (13,820 square
feet), a new sanctuary (6,210 square feet - 500 capacity), a
chapel (3,904 square feet) and 82 parking spaces on 2.72 +/-
acres of land that is zoned "R-2."
ORDINANCE DESIGN STANDARDS:
1. Site Location
Adjacent to an arterial (West Markham Street) and a
residential street (Ellis Drive).
2. Compatibility with Neiqhborhood
This site is abutted by commercial to the south,
office/commercial to the east, multifamily to the west,
and single family to the north. The church use is
existing and is surrounded on three sides by high-
density uses. A drainage ditch located on the north
should help buffer this site from the single family.
The use is compatible with the surrounding area.
July 12, 1988
SUBDIVISIONS
Item No. 12 - Continued
3. On -Site Drives and Parking
The site contains four access points (two on West
Markham Street and two on Ellis Drive). The site also
contains 69 paved parking spaces with an additional
82 paved parking spaces proposed.
4. Screening and Buffers
The applicant is proposing to use existing trees and
landscaping as well as committing to meet all future
city landscape requirements.
5 . Ana I s i.s
The staff feels that the proposed use is compatible
with the surrounding area. The applicant does need,
however, to submit a revised site plan that shows the
dimensions of all the buildings (existing and proposed)
and their setbacks from each other and the property
lines. The applicant also needs to show the existing
playground and future playground area. Finally, the
applicant will be required to provide a permanent
foundation for the temporary building and to construct
the future parking areas (at least a total of 100
parking spaces) at the time the new sanctuary is
constructed.
6. City Engineer Comments
Meet detention and excavation ordinance requirements.
7. StaffRecommendation:
Approval provided the applicant agrees to: (1) submit
a revised site p -I -an as outlined in the Analysis
section; (2) provide a permanent foundation for the
temporary classroom building; (3) construct the
necessary parking at the time of the construction of
the new sanctuary; and (4) meet detention and
excavation ordinance requirements.
July 12, 1988
SUBDIVISIONS
Item No. 12 - Continued
SUBDIVISON COMMITTEE REVIEW:
The applicant was present and agreed to comply with staff
recommendations. The applicant also informed the Water
Works representative that no construction would occur over
the existing 42" water main.
.....................
PLANNING COMMISSION ACTION: (July 12, 1988)
The applicant was present. There were no objectors. The
Commission voted 9 ayes, 0 noes, 1 abstention (Perkins) and
1 absent to approve the application as recommended by the
Staff, reviewed by the Subdivision Committee, and agreed to
by the applicant.