HomeMy WebLinkAboutZ-5003-A Staff AnalysisOctober 15, 1998
SUBDIVISION
ITEM NO.: F Cont. FILE NO.: Z -5003-A
STAFF UPDATE:
Staff recommends that the item be deferred to the October 15,
1998 agenda. The deferral is requested by staff and will not be
charged to the applicant.
PLANNING COMMISSION ACTION:
(SEPTEMBER 3, 1998)
Staff informed the Commission that the applicant had submitted a
letter to staff requesting that the item be deferred to the
October 15, 1998 agenda. Staff supported the deferral request.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for deferral to the October 15, 1998
agenda. A motion to that effect was made. The motion passed by
a vote of 10 ayes, 0 nays and 1 absent.
STAFF UPDATE:
The applicant submitted a letter to staff on October 2, 1998.
The applicant states that they have preliminary drawings showing
the proposed relocation of Pinnacle Valley Road. However, the
necessary revisions will take longer than another deferral will
allow. Therefore, the applicant is requesting that the item be
withdrawn, without prejudice, so that the item may be refiled at
any time. Staff supports the withdrawal request.
PLANNING COMMISSION ACTION:
(OCTOBER 15, 1998)
Staff informed the Commission that the applicant had requested
that the item be withdrawn without prejudice. Staff supported
the withdrawal as requested.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for withdrawal without prejudice. A
motion to that effect was made. The motion passed by a vote of
8 ayes, 0 nays and 3 absent.
0
October 15, 1998
ITEM NO.• F FILE NO.: Z -5003-A
NAME: Pinnacle Valley Office -- Short -Form PD -0
LOCATION: Northwest corner of Pinnacle Valley Road
and Highway 10
DEVELOPER•
Bill Lusk
#7 Berwin Dr.
Little Rock, AR 72227
ENGINEER•
White-Daters and Associates
401 Victory Street
Little Rock, AR 72201
AREA: 0.92 Acres
NUMBER
OF LOTS:
1 FT. NEW
STREET: 0
ZONING: R-2
ALLOWED
USES:
Single -Family
Residential
PROPOSED USE: Office
VARIANCESIWAIVERS_REQUESTED:
1. Variance for reduced setback (less than 25 feet) from the
floodway.
2. Waiver of one-half street improvements to Pinnacle Valley
Road.
A. PROPOSAWREQUEST:
The applicant proposes to construct a 3,300 square foot
office building and small parking lot on the property at the
northwest corner of Pinnacle Valley Road and Hwy. 10. The
property contains an old church building and a mobile home,
both of which will be removed with development of the
property.
There is floodway which runs through the center of the
property, as noted on the site plan. The applicant proposes
to construct the building and parking area up to the
floodway line (0 foot setback). Therefore, the applicant is
requesting a variance from the required 25 foot setback from
the floodway.
The proposed use of the property is office. The applicant
proposes the remaining 0-3 (General Office District)
permitted uses as alternate uses.
October 15, 1998
SUBDIVISION
ITEM NO.: F (Cont.) FILE NO.: Z -5003 -
The applicant is also requesting a waiver of the required
one-half street improvements to Pinnacle Valley Road.
B. EXISTING CONDITIONS:
The partially wooded site contains an old church building
and an old mobile home, as noted above. The church has been
vacant for over a year.
Ison Creek is located along the south portion of the
property with Capers Restaurant located further south along
the north side of Hwy. 10. Single-family residences are
located east and north of the site along the east side of
Pinnacle Valley Road. A single-family residence and vacant
wooded property is located north and west of the site along
the west side of Pinnacle Valley Road.
C. NEIGHBORHOOD COMMENTS:
Staff has received no negative neighborhood comments as of
this writing. The Westbury and Secluded Hills Neighborhood
Associations were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Pinnacle Valley Road is listed on the Master Street Plan
as a minor arterial. A dedication of right-of-way to 45
feet from centerline is required.
2. Dedicate floodway to the City.
3. Any construction, including landscaping, will require
Corps of Engineers and FEMA approval.
4. Stormwater detention Ordinance applies to this property.
Ordinance requires 25 foot building setback from
floodway. Construct one-half street improvements or pay
15% in -lieu.
5. Pinnacle Valley Road has a 1996 average daily traffic
count of 2,400 ADT.
E. UTILITIES AND FIRE DEPARTMENT/ COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
AP&L: No Comment received.
ARKLA: No Comment received.
Southwestern Bell: No Comment.
2
October 15, 1998
SUBDIVISION
ITEM NO.: F Cont. FILE NO.: Z -5003-A
Water: Contact the Water Works if additional water service
is required. Acreage charge of $150 per acre may apply.
Fire Department: No Comment.
County Planning: No Comment received.
LATA: No Comment.
F. ISSUES TECHNICAL DESIGN:
Planning Division:
The site is in the. River Mountain District. The Plan
recommends Transition and Park/Open Space. The River
Mountain Neighborhoods Plan did not propose any Land Use
Plan changes (approved in May 1998). The proposal is for an
office use. With single family use to the east and north,.
care must be given in reviewing signage, parking layout,
dumpster location and massing. Because of the site location
off Cantrell Road, no drive-in or -through facilities should
be included. Ison Creek is a priority two green finger, if
area is not provided with this application then the
opportunity will be lost.
Landscane Issues:
The proposed parking lot nearest Pinnacle Valley Road does
nor provide for the 6 foot wide on site landscape buffer
required by the zoning and landscape ordinances.
The proposed parking area along the southern perimeter
extends over into the adjacent property and in that area
does not allow for the 6 foot wide landscapes buffer
required. Additionally, the proposed parking lot within the
western area of the property does not provide for the
minimum 6 foot wide landscape buffer along a portion of the
western and northern site perimeters.
A 6 foot high opaque screen is required along the sites
northern, western and southern perimeters adjacent to
residential zoned properties. This screen may be a wooden
fence with its face side directed outward or dense evergreen
plantings.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
Prior to a building permit being issued, three copies of a
detailed landscape plan must be submitted to and approved by
Bob Brown, Plans Review Specialist. He may be reached at
371-4864.
3
October 15, 1998
SUBDIVISION
ITEM NO.: F Cont. FILE NO.: Z -5003-A
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
July 8, 1998. The revised site plan addresses most of the
concerns raised by staff and the Subdivision Committee. The
applicant has taken all proposed improvements (drives and
parking) out of the floodway area.
The following minor details need to be shown on a revised
site plan:
1. Building's height
2. Six foot landscape buffer between parking area and
Pinnacle Valley Road right-of-way
3. Signage
4. Screening fence
5. Drop last two parking spaces (last space on each side).
from parking lot and provide back out area.
The applicant has noted that the floodway located on this
property will be dedicated as an easement. The Parks and
Recreation Department was contacted by staff regarding this
issue and had no objection to dedication of the floodway in
this manner. It was noted that this area should remain in
its current, natural state.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the PD -O subject to the
following conditions:
1. Compliance with the comments noted in paragraphs D, E, F
and G of this report.
2. The floodway area within this property will need to be
dedicated as an easement and remain in its current,
natural state.
3. Staff recommends approval of the requested variance for
reduced setback from the floodway.
4. Staff recommends denial of the requested waiver of
one-half street improvements to Pinnacle Valley Road.
5. The parking on this property is not to be used for
overflow parking for the restaurant to the south.
4
October 15, 1998
SUBDIVISION
ITEM NO.: F Cont. FILE NO.: Z -5003-A
SUBDIVISION COMMITTEE COMMENT: (JULY 2, 1998)
Tim Daters was present, representing the application. Staff gave
a brief description of the proposal.
Staff noted that the parking and driveway shown within the
floodway would need to be removed. Staff also noted several
minor detail's which needed to be shown on the site plan.
Mr. Daters noted that none of the parking on this site would be
used as overflow parking for Capers Restaurant.
The Public Works requirements were briefly discussed. It was
noted that Pinnacle Valley Road would possibly have a future
alignment which moves the right-of-way further north and east,
straightening out the existing curve. Mr. Daters was asked to
check with the county on the future alignment and determine
whether or not to make it part of the proposal.
After the brief discussion, the Committee forwarded the issue to
the full Commission for final action.
PLANNING COMMISSION ACTION: (JULY 23, 1998)
Staff informed the Commission that the applicant had submitted a
letter to staff requesting that the item be deferred to the
September 3, 1998 agenda. Staff supported the deferral request.
The Commission voted to waive their bylaws and accept the request
for deferral (being less than 5 working days prior to the public
hearing) with a vote of 11 ayes and 0 nays.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for deferral to the September 3, 1998
agenda. A motion to that effect was made. The motion passed by
a vote of 11 ayes, and 0 nays.
SUBDIVISION COMMITTEE COMMENT: (AUGUST 13, 1998)
Tim Daters was present, representing the application. Mr. Daters
stated that he is continuing to work out details associated with
the future realignment of Pinnacle Valley Road.
Staff stated that another deferral would be in order, to allow
the applicant more time to work out these issues. The
Subdivision Committee concurred with staff.