Loading...
HomeMy WebLinkAboutZ-4973-D Map- < Rogp THIS PROJECT —/ VICINITY MAP 1" = 300' CAR WASH Hours of Operation: 6 am — 10 pm/ 7 days a week Employee — 1 Part Time Employee 2 hr on Sun — Thurs 6 hr on Fri & Sat Scale 1" 20 = 20 ft LEGAL DESCRIPTION LOT 6, COOK—ALWORTH SUBDIVISION, CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS. .11 ALL BOUNDARY INFORMATION WAS PROVIDED BY A SURVEY PERFORMED BY BROOKS & CURRY, INC. ON DEC. 30, 1987. ALL TOPOGRAPHIC INFORMATION WAS PROVIDED BY THE CITY OF LITTLE ROCK'S P.A.G.I.S I HEREBY CERTIFY THAT I HAVE SURVEYED THE PROPERTY SHOWN AND DESCRIBED HEREON. PROPERTY LINES ARE LOCATED IN ACCORDANCE WITH ESTABLISHED PROPERTY LINES. THERE ARE NO APPARENT ENCROACHMENTS EXCEPT AS SHOWN. i"viiii]i....q•M NO THIS PROERTY IS .. THE 100 YEAR WITH ;yam•• Si C 51E: ^: •°°;BOUNDARYO ASO SHOWN ON TH FLOODWAY, FLOOD IBOUNDARY AND FLOOD FLOOD sTnrr:o INSURANCE WORK MAP FOR PULASKI COUNTY, ARKANSAS. o ' % Q SfCFq W, o LAI S� ' Paul M."White, PLS #1281 Ark ,,.••. GENERAL NOTES 1. Plans of work within the right—of—way will be submitted. 2. Stormwater detention ordinance does apply. 3. A grading plan will be provided and a grading permit will be, -obtained if required. 4. Sidewalks and handicap ramps will conform to "MSP" & current ADA standards. 5. Any damages to curb, gutter or sidewalk in the right—of— way will be repaired or replaced. 6. Street improvement plans shall include signage and striping. GENERAL NOTES: 1. Owner: Mike Ibsen Ibsen Enterprises 3021 Cantrell Road Little Rock, AR 72202 Phone (501) 664-2736 2. Developer: Paul Stagg 5016 Calico Creek Cove Little Rock, AR 72116 Phone (501) 758-3190 3. All site lighting shall be 30' Tall Pole Lights w/ 1000 watt Metal Halide directed away from adjacent properties. Site lighting will be illuminated all night. Site will be monitored 24 hr/ 7 days. Employee is automatically paged if malfunction w/ equipment. 4. Hours of operation: 6 am — 10 pm, 7 days/week 5. Synopsis: Land Area 0.86 AC Building Area 2,800 SF 6. Building height is 22'-3" 7. The building structure is concrete block & glazed block. The veneer of the building is EIFS & simulated stone. The roof system is wood truss 7/12 pitch w/ OSB decking & simulated slate shingles. 8. Building will have the "Splash" neon sign. CUP APPLICATION SPLASH C/-AJL101 WASH ON CANTRELL ROAD Date: June 30, 2003 Revised: August 1, 2003 n © VV LL11111( 1Cs=1(l�� 1C LLJ11�161� Cirri tii6i�61�®lLl(�'il 11 1Ce4i19 11WO. CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING RECEIVED 0 24 RAHLING CIRCLE LITTLE ROCK, ARKANSAS 72223 LITTLE ROCK PLANNING COMMISSION AUG 12003 APPROVED, SU&9�.CT TO TrlE CONDITIONS AS NOTED IN i; -?E: f ', P!NG CEJP%iISSION BY: — 1411tvU'iE D U,h _D BY: Job No. 03-0433