HomeMy WebLinkAboutZ-4875 Staff AnalysisNovember 3, 1987
SUBDIVISIONS
Item No. C - Z-4875
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
Thomas Memorial Baptist Church
Conditional Use Permit
(Z-4875)
The northwest corner of Brown
and 14th Streets (1316 Brown
Street)
Board of Trustees Thomas
Memorial Baptist Church/John B.
Sewall
To expand an existing church facility in two phases which
are: (1) to construct a 20 feet two story addition (west),
add a second floor on the west 42 feet (35 feet in height)
of the existing building plus a one level corridor on both
sides of the building, and add a 17 space off -site parking
lot; and in Phase II to add a second floor to the remaining
area (auditorium) increasing the capacity from 90 to 150
persons (the church hopes to purchase Lot 6 and construct an
additional 16 parking spaces) on land that zoned "R-3."
ORDINANCE DESIGN STANDARDS:
1.
Site Location
Adjacent to two residential streets (14th Street and
Brown Street).
2. Compatibility With Neighborhood
This property lies within the Stephens School
Neighborhood Plan. The land use plan calls for single
family in the entire area. The existing facility is
compatible with the surrounding area even though it
does not have any off-street parking. The proposed
second story addition (35 feet) would have a tendency
November 3, 1987
SUBDIVISIONS
Item No. C - Continued
to overshadow adjacent single family uses especially
considering that two setback variances would be
required (14th Street and on the alley). The staff
feels that this proposal would constitute an
overbuilding of the site and would be incompatible with
the surrounding area.
3. On -Site Drives and Parking
The existing site has no parking. The proposal
contains one access (dropoff) off Brown Street and a
paved 17 space parking lot. The applicant is also
proposing a future 16 space parking lot (once acquired)
at the time of Phase II construction.
4. Screeninq and Buffers
The applicant has proposed landscaping on the parking
areas.
5. Analysis
The staff does not feel that this proposal would be
compatible with the surrounding area (see note number
2). The staff feels that the proposed addition (35
feet in height) would infringe on the single family
located adjacent to the north and the east. The
overbuilding would result in two setback variances (25
feet rear/alley and 25 feet corner lot/14th Street).
Finally, the staff cannot recommend approval of a
parking lot on land that is not owned by the
applicant.
6. City Engineer Comments
Pave the alley to a width of 20 feet (from 14th Street
to the proposed parking lot) and use for two-way
traffic.
7. Staff Recommendation
Denial of the proposed church expansion.
November 3, 1987
SUBDIVISIONS
Item No. C - Continued
SUBDIVISION COMMITTEE REVIEW:
The agent for the applicant was present and stated that the
height of the proposed second story would probably be closer
to 22 feet. The City Engineer also stated that half of the
proposed drop-off/drive would be located in the right-of-way
and that a franchise from the Board of Directors would be
required. A lengthy discussion ensued about the amount of
the proposed construction upon the site. The Committee
advised the applicant to consider scaling down the proposal.
The Water Works stated that a water main extension for
fire protection would be required because the nearest fire
hydrant is 600 feet away.
PLANNING COMMISSION ACTION: (8-17-87)
The applicant was not present. There was one objector
present. The staff stated that they had received a letter
requesting deferral until the September 22, 1987, Planning
Commission meeting. The Commission then voted 9 ayes,
1 absent, and 1 open position to defer this item until the
September 22, 1987, Planning Commission meeting.
SUBDIVISION COMMITTEE REVIEW:
The applicant was not present. The item was not discussed.
PLANNING COMMISSION ACTION: (9-22-87)
The applicant was not present. There were no objectors.
The staff stated that they had received a letter requesting
deferral of this item until the November 3, 1987, Planning
Commission meeting. The Commission then voted 10 ayes,
1 absent to defer this item until the November 3, 1987,
Planning Commission meeting.
November 3, 1987
SUBDIVISIONS
Item No. C - Continued
SUBDIVISION COMMITTEE REVIEW:
The applicant was present. The staff stated that they had
received a revised proposal, but they would have to
recommend the withdrawal of the item without prejudice due
to the fact that the new proposal contained property that
the church did not own. The Committee told the applicant to
get with the staff as soon as possible to provide proof of
an option to buy or ownership.
PLANNING COMMISSION ACTION: (11-3-87)
The applicant was present. There were no objectors. The
staff stated that they had received a revised site plan that
included converting the structure on the lot immediately to
the north to a fellowship building by tying on to the
existing structure. The staff stated that they could
support the new proposal due to the fact that it would be
one-story in height with adequate setback from the adjacent
single family located to the west and also because of
additional City Engineer approved off-street parking. The
Commission voted 10 ayes, 0 noes, 1 absent to approve the
revised proposal as recommended by the staff.