HomeMy WebLinkAboutZ-4855-B Staff AnalysisApril 25, 1996
ITEM A FILE N Z--48 -B
NAME: TRAMMELL 5323 BASELINE RD. -- SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the south side of Baseline Rd., approximately 0.25
mile west of Stanton Rd., -at 5323 Baseline Rd. '
DEVELOPER:
Allen W. Trammell
TRAMMELL & CO.
7009 Geyer Springs Rd.
Little Rock, AR 72209
568-5652
AREA: 0.71 ACRES
ERZ EER:
Troy D. Laha
ENGINEERS, INC.
P. O. Box 190251
Little Rock, AR 72219-0251
565-7384
NUMBER OF LOTS: 1 FT. NEW TREET: 0
ZONING:
I-2 & R-2
'PROPOSEDUSES:
Mini -Warehouse and Office
PLANNING
DISTRICT:
Geyer Springs
West
(15)
CENSOS TRACT: 41.08
VARTANQES RE E TED: None
BACKGROUND
The item was on the January 30, 1996 Planning Commission agenda
as a rezoning request. The proposal, at that time, was for a
rezoning of the C-3 and R-2 site to C-4. Staff recommended
denial of the C-4 rezoning, but there was agreement among
Commissioners and staff that a deferral would be appropriate to
permit the applicant to amend his request to seek approval of a
planned development in lieu of the C-4 rezoning.
STATEMENT QF PROPOSAL:
Proposed is a planned development of a 0.71 acre tract to include
construction of a mini -warehouse facility and the conversion of
the existing residential structure on the tract to an office use.
The applicant proposes to construct approximately 10,000 square
feet of mini -warehouse buildings, with a total of 68 rental
units. The existing residential structure is proposed to be
"totally remodeled" to bring it into conformance with applicable
codes and to provide the amenities needed to make it attractive
office space for general and professional offices. The mini -
warehouse facility is proposed to be accessible only during
specified hours, typically until 9:00 at night, and not on a 24-
April 25, 1996
SDIVI I
ITEM A(Cont.)FILE r7-4 -B
Little Rock Municipal Water Works comments that on-site fire
protection may be required. A water main extension would be
needed to provide additional fire protection, if the fire
hydrant is required.
Little Rock Wastewater utility comments that the existing
structure has sewer available, but that, if sewer service is
required for the mini -storage units, a main extension will
be retried to provide service.
Arkansas Power and Light Co. commented that a 25 foot right-
of-way will be required along the north side of the property
bordering Baseline Rd. for possible future construction of a
single or 3 phase circuit.
Arkansas Louisiana Gas Company approved the submittal.
The Fire Department commented that there is a fire hydrant
location within 500 feet of the proposed buildings. The
drives should be a minimum of 20 feet in width, and should
be able to support fire apparatus.
D. ISSUES/LEGAL/TECHNICALZDESIGN:
The Neighborhoods and Planning staff comments include:
The applicant has indicated that he proposes to
use the existing house for general and
professional office space, or for the office and
residence for the mini -warehouse manager. If a
broader use choice is desired, the applicant needs
to specify the types of uses he desires to include
in the approval; e.g., "by right" uses as listed
in the 0-3 zoning district. The term "office"
will not permit use of the building for other
types of uses which are normally permitted in the
office zoning districts (beauty shops, sit-down
restaurants, etc.).
The existing house has 1086 square feet; the
carport, 240 square feet, for a total of 1,326
square feet. Sec. 36-502 requires, for general
business and retail sales, one parking space for
each 300 feet of gross floor area; therefore, for
this building, 5 spaces are required. The site
plan shows a concrete area for parking, but does
not show how vehicles will be accommodated in the
area. The 34 foot long by 26.7 foot wide area
will not accommodate 5 vehicles, with maneuvering
area.
3
April 25, 1996
ITEM A n FILE 7-4 -B
Commercial) uses for the area. Although the rear 92 (±)
feet extends into the"MR" (Mixed Residential) area to the
south, because the tract is a single tract, not taking
access to the area to the south, and because land use
district lines are not "fixed" lines, no conflict with the
Land Use plan is seen. The proposed development, then, is
in conformance with the adopted Land Use Plan.
F. STAFF RE MME ATI
Staff recommends approval of the planned development,
subject to the applicant complying with Public Works and
landscaping requirements.
BDIVI ION COMMITTEE COMMENT: (FEBRUARY 22, 1996)
Mac. Alan Trammell, the applicant, was present. The Neighborhoods
and Planning staff presented the request and the proposed site
plan. The Public Works staff person, David Scherer, presented
the Public works comments, noting the need to eliminate one of
the drives and to provide adequate vehicle parking and
maneuvering space. The Neighborhoods and Planing staff presented
the discussion outline comments, and discussed the issues of
landscaping and buffering, parking requirements, and maintenance
of the perimeter of the property between the mini -warehouse
buildings and the property lines. Mr. Trammell indicated that
the 2 foot space between the buildings and the property line
would provide sufficient space for maintenance of the grounds.
He explained that, at the existing residential structure, the
carport would be included in the office building, and that
required parking would be provided on-site. He said that the
site plan would be revised, as needed. Following the discussion,
the Committee forwarded the item to the full Commission for the
public hearing.
STAFFUPDATE:
The applicant submitted a revised site plan which addresses all
Planning and Public Works staff concerns. The second drive
approach off Baseline was removed; the internal driveways were
re -designed to provide required off-street parking; adequate
parking, to meet Ordinance requirements was provided; the
landscaping requirements were provided for; land use buffers were
provided; etc. Staff recommends approval of the PCD.
pLANNINg COMMISSION A TI N: (APRIL 25, 1996)
Staff reported that all issues had been resolved. The use issues
have been clarified; the site plan has been revised to conform to
5
April 25, 1996
ITEM NO. A FILE NO.: Z-4855
NAME: TRAMMELL 5323 BASELINE RD. -- SHORT --FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the south side of Baseline Rd., approximately 0.25
mile west of Stanton Rd., at 5323 Baseline Rd.
DEVELOPER:
Allen W. Trammell
TRAMMELL & CO.
7009 Geyer Springs Rd.
Little Rock, AR 72209
568-5652
AREA: 0.71 ACRES
ZONING• I-2 & R-2
PLANNING DISTRICT:
CENSUS TRACT: 41.08
VARIANCES RE ESTER:
BACKGROUND:
ENGINEER:
Troy D. Laha
ENGINEERS, INC.
P. O. Box 190251
Little Rock, AR 72219-0251
565-7384
NUMBER OF LOTS: 1 FT NEW STREET: 0
PR POSED SES: Mini -Warehouse and Office
Geyer Springs West (15)
None
The item was on the January 30, 1996 Planning Commission agenda
as a rezoning request. The proposal, at that time, was for a
rezoning of the C-3 and R-2 site to C-4. Staff recommended
denial of the C-4 rezoning, but there was agreement among
Commissioners and staff that a deferral would be appropriate to
permit the applicant to amend his request to seek approval of a
planned development in lieu of the C-4 rezoning.
STATEMENT OF PROPOSAL:
Proposed is a planned development of a 0.71 acre tract to include
construction of a mini -warehouse facility and the conversion of
the existing residential structure on the tract to an office use.
The applicant proposes to construct approximately 10,000 square
feet of mini -warehouse buildings, with a total of 68 rental
units. The existing residential structure is proposed to be
"totally remodeled" to bring it into conformance with applicable
codes and to provide the amenities needed to make it attractive
office space for general and professional offices. The mini -
warehouse facility is proposed to be accessible only during
specified hours, typically until 9:00 at night, and not on a 24 -
Aprli 25,1996
S BDIVISION
ITEM NO -: A AcontFII%? N❑. Z-4855-8
hour per day basis. A security fence is to be installed:_at. the --
perimeter of the mini -warehouse area, and a security gate will be
provided to control access. No on-site manager or dwelling is
proposed initially, but use of the existing dwelling for these
purposes may be instituted at a later date. Site lighting is to
be located and designed to limit "bleed -over" onto abutting
properties, and will provide security lighting on the site.
Construction of the facility is proposed to be accomplished in
phases, as financing permits.
A. PROPOSALRE UF -ST:
Planning Commission review and a recommendation of approval
to the Board of Directors is requested for a planned
development.
B, ECISTING CONDITIONS:
The site currently has a 1,086 square foot residential
structure located approximately 34 feet off the Baseline Rd.
right-of-way. The remainder of the tract is vacant.
The existing zoning of the tract includes C-3 property (the
front/north 200 feet) and R-2 property (the rear/south 91-96
feet). The C-3 portion of the tact abuts 1-2 property to
the west and a PCD to the east. The rear R-2 property abuts
R-2 property on the east, south and west. Across Baseline
rd. to the north is C-4 and R-2 property.
C. ENGINEERING IITILITY COMMENTS:
The Public works comments include:
A site grading plan must be submitted and an excavation
permit form the City must be obtained prior to
beginning any work on the site.
The Traffic Engineer requests a revised site plan
showing 24 foot drives and a layout with improved
maneuvering space. The two access drives must be
combined into one drive, preferably on the west side of
the property. Drives must be asphalt, not gravel.
The existing apron off Baseline Rd. must be removed and
the curb and sidewalk must be reconstructed.
An AHTD permit for the driveway is required.
Right-of-way must be dedicated along Baseline Rd. to
provide a minimum of 45 feet of right-of-way from the
centerline of Baseline Rd.
2
,�april 25, 1996
SU8DIVIIaION
ITEM A Can FILE NO.: Z-4$ -B
Little Rock Municipal Water Works comments that on-site fire
protection may be required. A water main extension would be
needed to provide additional fire protection, if the fire
hydrant is required.
Little Rock Wastewater Utility comments that the existing
structure has sewer available, but that, if sewer service is
required for the mini -storage units, a main extension will
be retried to provide service.
Arkansas Power and Light Co. commented that a 25 foot right-
of-way will be required along the north side of the property
bordering Baseline Rd. -for possible future construction of a
single or 3 phase circuit.
Arkansas Louisiana Gas Company approved the submittal.
The Fire Department commented that there is a fire hydrant
location within 500 feet of the proposed buildings. The
drives should be a minimum of 20 feet in width, and should
be able to support fire apparatus.
D. I E5 LEGAL TECH I AL DE IG :
The Neighborhoods and Planning staff comments include:
The applicant has indicated that he proposes to
use the existing house for general and
professional office space, or for the office and
residence for the mini -warehouse manager. If a
broader use choice is desired, the applicant needs
to specify the types of uses he desires to include
in the approval; e.g., "by right" uses as listed
in the 0-3 zoning district. The term "office"
will not permit use of the building for other
types of uses which are normally permitted in the
office zoning districts (beauty shops, sit-down
restaurants, etc.).
The existing house has 1086 square feet; the
carport, 240 square feet, for a total of 1,326
square feet. Sec. 36-502 requires, for general
business and retail sales, one parking space for
each 300 feet of gross floor area; therefore, for
this building, 5 spaces are required. The site
plan shows a concrete area for parking, but does
not show how vehicles will be accommodated in the
area. The 34 foot long by 26.7 foot wide area
will not accommodate 5 vehicles, with maneuvering
area.
April 25; 1996
SUBDIVISION
ITEM No.: A(Cont.FILE NO.: Z -4855-B
The code requires, for warehouse and-storage:_uses,
5 parking spaces, plus 1 space per 2000 square fee
of gross floor area, up to 50,000 SF. The storage
use has 10,486 SF of area. Therefore, 10 spaces
are required. Historically, in mini -storage uses,
it is viewed that each storage space has its own
parking area in the driveway, and this requirement
is not applied strictly. As long as there are
spaces provided for the office use (for those
renting spaces and paying rents), parking is
deemed sufficient.
The Ordinance requires that the applicant submit a
general schematic landscape plan. This must be
prepared prior to a building permit being issued.
At this time, the notation of areas to receive
landscaping is sufficient.
Fencing, or other approved means, is required to
buffer commercial uses from residentially zoned or
use areas. The blank face of a building can be an
approved means of doing this. In the part of the
site abutting residential zoned land, the blank
wall of the building serves as the screening
device. Any change in the configuration of the
buildings to accommodate staff's recommendation
also needs to take the need for the land use
buffer requirement into consideration.
The Pians Review Specialist notes:
The proposed structure encroaches 12 1/2 feet
into the required 14 1/2 foot wide land use
buffer along the southern perimeter, and 3
feet into that portion of the eastern
perimeter adjacent to the residentially zoned
property. Trees and shrubs will be required
within these buffer areas.
Curb and gutter, or other approved landscape
border, will be required to protect
landscaped areas from vehicular traffic.
It will be necessary to bring this
development into compliance with the
Landscape Ordinance.
E. ANALYSIS:
The Planning staff comments that the proposed development is
in the Geyer Springs West zoning district, and that the
adopted Land Use Plan recommends "MOC" (Mixed Office and
\4
P:pri,l 25, 1996
SUDIV18IQN
IT M NO.: A Cont. FILE NQ.: Z -4855-B
Commercial) uses for the area. Although the rear 92 (t)
feet extends into the "MR" (Mixed Residential) area to the
south, because the tract is a single tract, not taking
access to the area to the south, and because land use
district lines are not "fixed" lines, no conflict with the
Land Use plan is seen. The proposed development, then, is
in conformance with the adopted Land Use Plan.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development,
subject to the applicant complying with Public Works and
landscaping requirements.
SUBDIVISION CQ MMITTEE COMMENT: (FEBRUARY 22, 1996)
Mr. Alan Trammell, the applicant, was present. The Neighborhoods
and Planning staff presented the request and the proposed site
plan. The Public Works staff person, David Scherer, presented
the Public Works comments, noting the need to eliminate one of
the drives and to provide adequate vehicle parking and
maneuvering space. The Neighborhoods and Planing staff presented
the discussion outline comments, and discussed the issues of
landscaping and buffering, parking requirements, and maintenance
of the perimeter of the property between the mini -warehouse
buildings and the property lines. Mr. Trammell indicated that
the 2 foot space between the buildings and the property line
would provide sufficient space for maintenance of the grounds.
He explained that, at the existing residential structure, the
carport would be included in the office building, and that
required parking would be provided on-site. He said that the
site plan would be revised, as needed. Following the discussion,
the Committee forwarded the item to the full Commission for the
public hearing.
STAFF UPDATE•
The applicant submitted a revised site plan which addresses all
Planning and Public Works staff concerns. The second drive
approach off Baseline was removed; the internal driveways were
re -designed to provide required off-street parking; adequate
parking, to meet Ordinance requirements was provided; the
landscaping requirements were provided for; land use buffers were
provided; etc. Staff recommends approval of the PCD.
5
March 14, 1996 ti
ITEM O.: D FILE NO.: Z -4855-B
NAME: TRAMMELL 5323 BASELINE RD. -- SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the south side of Baseline Rd., approximately 0.25
mile west of Stanton Rd., at 5323 Baseline Rd.
DEVELOPER:
Allen W. Trammell
TRAMMELL & CO.
7009 Geyer Springs Rd.
Little Rock, AR 72209
568-5652
AREA: 0.71 ACRES
ENGINEER:
Troy D. Laha
ENGINEERS, INC.
P. 0. Box 190251
Little Rock, AR 72219-0251
565-7384
NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: I-2 & R-2 PROPOSED USES: Mini -Warehouse and Office
PLANNING DISTRICT: Geyer Springs West (15)
CENSUS TRACT: 41.08
VARIANCES REQUESTED: None
BACKGROUND:
The item was on the January 30, 1996 Planning Commission agenda
as a rezoning request. The proposal, at that time, was for a
rezoning of the C-3 and R-2 site to C-4. Staff recommended
denial of the C-4 rezoning, but there was agreement among
Commissioners and staff that a deferral would be appropriate to
permit the applicant to amend his request to seek approval of a
planned development in lieu of the C-4 rezoning.
STATEMENT OF PROPOSAL:
Proposed is a planned development of a 0.71 acre tract to include
construction of a mini -warehouse facility and the conversion of
the existing residential structure on the tract to an office use.
The applicant proposes to construct approximately 10,000 square
feet of mini -warehouse buildings, with a total of 68 rental
units. The existing residential structure is proposed to be
"totally remodeled" to bring it into conformance with applicable
codes and to provide the amenities needed to make it attractive
office space for general and professional offices. The mini -
warehouse facility is proposed to be accessible only during
specified hours, typically until 9:00 at night, and not on a 24-
March 14, 1996
BDIVT IO
L
ITEM NQ.: D(COnt_ FILE Z-48 5-B
hour per day basis. A security fence is to be installed at the
perimeter of the mini -warehouse area, and a security gate will be
provided to control access. No on-site manager or dwelling is
proposed initially, but use of the existing dwelling for these
purposes may be instituted at a later date. site lighting is to
be located and designed to limit "bleed -over" onto abutting
properties, and will provide security lighting on the site.
Construction of the facility is proposed to be accomplished in
phases, as financing permits.
A. PROPOSAL RE ❑EST:
Planning Commission review
to the Board of Directors
development.
B. EXISTING CONDITIONS:
and a recommendation of approval
is requested for a planned
The site currently has a 1,086 square foot residential
structure located approximately 34 feet off the Baseline Rd.
right-of-way. The remainder of the tract is vacant.
The existing zoning of the tract includes C-3 property (the
front/north 200 feet) and R-2 property (the rear/south 91.96
feet). The C-3 portion of the tact abuts I-2 property to
the west and a PCD to the east. The rear R-2 property abuts
R-2 property on the east, south and west. Across Baseline
rd. to the north is C-4 and R-2 property.
C. ENGINEERING UTILITY COMMENTS:
The Public Works comments include:
A site grading plan must be submitted and an excavation
permit form the City must be obtained prior to
beginning any work on the site.
The Traffic Engineer requests a revised site plan
showing 24 foot drives and a layout with improved
maneuvering space. The two access drives must be
combined into one drive, preferably on the west side of
the property. Drives must be asphalt, not gravel.
The existing apron off Baseline Rd. must be removed and
the curb and sidewalk must be reconstructed.
An AHTD permit for the driveway is required.
Right-of-way must be dedicated along Baseline Rd. to
provide a minimum of 45 feet of right-of-way from the
centerline of Baseline Rd.
2
March 14, 1996
SQBDIVIS_I 1+
4
ITEM O.: D Cont. FILE NO-: Z-4 5-B
Little Rock Municipal Water Works comments that on -site --fire
protection may be required. A water main extension would be
needed to provide additional fire protection, if the fire
hydrant is required.
Little Rock Wastewater Utility comments that the existing
structure has sewer available, but that, if sewer service is
required for the mini -storage units, a main extension will
be retried to provide service.
Arkansas Power and Light Co. commented that a 25 foot right-
of-way will be required along the north side of the property
bordering Base -line Rd. for possible future construction of a
single or 3 phase circuit.
Arkansas Louisiana Gas Company approved the submittal.
The Fire Department commented that there is a fire hydrant
location within 500 feet of the proposed buildings. The
drives should be a minimum of 20 feet in width, and should
be able to support fire apparatus.
D. I6aUESLLEGALITECHNICAL/DESIGN:
The Neighborhoods and Planning staff comments include:
The applicant has indicated that he proposes to
use the existing house for general and
professional office space, or for the office and
residence for the mini -warehouse manager. If a
broader use choice is desired, the applicant needs
to specify the types of uses he desires to include
in the approval; e.g., "by right" uses as listed
in the 0-3 zoning district. The term "office"
will not permit use of the building for other
types of uses which are normally permitted in the
office zoning districts (beauty shops, sit-down
restaurants, etc.).
The existing house has 1086 square feet; the
carport, 240 square feet, for a total of 1,326
square feet. Sec. 36-502 requires, for general
business and retail sales, one parking space for
each 300 feet of gross floor area; therefore, for
this building, 5 spaces are required. The site
plan shows a concrete area for parking, but does
not show how vehicles will be accommodated in the
area. The 34 foot long by 26.7 foot wide area
Mill not accommodate 5 vehicles, with maneuvering
area.
3
March 14, 1996
SUBDIVISION
ITEM NO D(Cont. FILE "Q �
The Code requires, for warehouse and storage uses,
5 parking spaces, plus 1 space per 2000 square fee
of gross floor area, up to 50,000 SF. The storage
use has 10,486 SF of area. Therefore, 10 spaces
are required. Historically, in mini -storage uses,
it is viewed that each storage space has its own
parking area in the driveway, and this requirement
is not applied strictly. As long as there are
spaces provided for the office use (for those
renting spaces and paying rents), parking is
deemed sufficient.
The Ordinance requires that the applicant submit a
general schematic landscape plan. This must be
prepared prior to a building permit being issued.
At this time, the notation of areas to receive
landscaping is sufficient.
Fencing, or other approved means, is required to
buffer commercial uses from residentially zoned or
use areas. The blank face of a building can be an
approved means of doing this. In the part of the
site abutting residential zoned land, the blank
wall of the building serves as the screening
device. Any change in the configuration of the
buildings to accommodate staff's recommendation
also needs to take the need for the land use
buffer requirement into consideration.
The Plans Review Specialist notes:
The proposed structure encroaches 12 1/2 feet
into the required 14 1/2 foot wide land use
buffer along the southern perimeter, and 3
feet into that portion of the eastern
perimeter adjacent to the residentially zoned
property. Trees and shrubs will be required
within these buffer areas.
Curb and gutter, or other approved landscape
border, will be required to protect
landscaped areas from vehicular traffic.
It will be necessary to bring this
development into compliance with the
Landscape Ordinance.
E_ ANALYSIS•
The Planning staff comments that the proposed development is
in the Geyer Springs West zoning district, and that the
adopted Land Use Plan recommends "MOC" (Mixed Office and
4
March 14, 1996
k
ITEM D Mont , ) FILE Z-4 -B
Commercial) uses for the area. Although the rear 92 (t)
feet extends into the "Mit" (Mixed Residential) area to the
south, because the tract is a single tract, not taking
access to the area to the south, and because land use
district lines are not "fixed" lines, no conflict with the
Land Use plan is seen. The proposed development, then, is
in conformance with the adopted Land Use Plan.
F. STAFF RECOMMENDATIDN�_:
Staff recommends approval of the planned development,
subject to the applicant complying with Public works and
landscaping requirements.
SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 22, 1996)
Mr. Alan Trammell, the applicant, was present. The Neighborhoods
and Planning staff presented the request and the proposed site
plan. The Public Works staff person, David Scherer, presented
the Public works comments, noting the need to eliminate one of
the drives and to provide adequate vehicle parking and
maneuvering space. The Neighborhoods and Planing staff presented
the discussion outline comments, and discussed the issues of
landscaping and buffering, parking requirements, and maintenance
of the perimeter of the property between the mini -warehouse
buildings and the property lines. Mr. Trammell indicated that
the 2 foot space between the buildings and the property line
would provide sufficient space for maintenance of the grounds.
He explained that, at the existing residential structure, the
carport would be included in the office building, and that
required parking would be provided on-site. He said that the
site plan would be revised, as needed. Following the discussion,
the Committee forwarded the item to the full Commission for the
public hearing.
PLANNING COMMISSION ACTION: (MARCH 14, 1996)
Staff reported that the applicant had submitted a revised site
plan, but that the revised plan did not address the issues
discussed at the Subdivision committee meeting; e.g., that no
front or side yard landscape strips were provided; inadequate
parking and vehicle maneuvering space had been provided; one of
the two driveway access points from Baseline Rd. had not been
eliminated; etc. Staff reported that the applicant had amended
his request to seek approval of all C-3 uses by right for the
existing residential structure, plus the residential use for an
office manager,' and the general and professional uses originally
requested. Staff reported that the Planning staff did not object
to this amended use list, since the property is currently zoned
C-3. Staff noted, however, that uses may be limited by available
5
March 14, 1996
W0
y
I EM D n FILE Z-4855-
parking.
- -
parking. Staff reported that there had been no communications
form area property owners concerning the issue. Staff
recommended approval of the planned development, subject to staff
working out the Neighborhoods and Planning and the Public works
concurs on the site plan.
Mr. Alan Trammell, the applicant, was present. He explained that
his engineer and evidently misunderstood the concerns which
needed to be addressed. He said that the revised drawing had
provided the required land use buffer along the rear of the
property, and that the eastern -most drive had been widened, as
required by Public Works. He said that, since the two drive
access points had been installed by the Highway Department when
the state widened Baseline Rd., he was under the impression that
they could both remain. He expressed concern about the expense,
safety, and rationale for requiring the access point to be
removed. He said that, in the discussion regarding landscaping
at the Subdivision Committee meeting, he had understood that
landscaping could be dealt with at staff level at the time a
building permit were requested.
Staff explained that the revised plan had, in an attempt to
provide the required parking, simply shown paving in the entire
front yard of the residential structure, eliminating any space
along the front and side yards for the required landscaping.
Staff noted that, in the original site plan, the areas set aside
for landscaping were provided for, and specific landscaping
requirements could be worked out at the time a building permit is
requested; however, since the areas were now eliminated and
included in paved areas, this deficiency must be addressed.
Bob Brown, Site Plan Review Specialist, cited the landscaping
requirements; that along the front of the property, the Land Use
Buffer ordinance requires a 14 1/2 foot landscape buffer, with a
10 foot minimum, with transfers; the Landscape ordinance would
require a minimum of a 6 foot strip. At the rear of the
property, the requirement would be the same as the Baseline Rd.
requirement. Along the side lot lines, a 6 foot minimum
landscape strip would be required, he said.
David Scherer, with the Public Works staff, explained that the
City ordinance permits only one access point for each 300 feet of
street frontage along arterial roadways; that, with the subject
site being only 105 feet wide, the second access point would be
required to be removed. He explained that, when the Highway
Department widened the roadway, since the property was a
residential property with two existing driveways, new aprons were
provided for these two existing driveways. With the change in
zoning and use, -conformance with the regulation permitting only
one driveway would be enforced.
6
March 14, 1996
SDBDIVISIQN
L
ITEM D FILE Z-485 -B
Commissioner Putnam recommended that the item be deferred, and
that the applicant make needed changes, present them to the
Subdivision Committee at the Committee's next meeting, and be
heard by the Commission on April 25th. Addressing Mr. Trammell,
Mr. Putnam indicated that Mr. Trammell might want to seek
approval of a waiver of the restriction on the second drive
access point.
Chairperson Woods, saying that there were a number of issues to
be resolved, suggested that the item be deferred.
Mr. Trammell reported that he would, indeed, wish to seek a
wavier of the restriction on the second driveway.
Directors of Neighborhoods and Planning, Jim Lawson, suggested
that the PCD site plan be approved, subject to meeting the
landscaping, buffer, and parking requirements, with one driveway,
then, make a recommendation on the requested wavier from the
restriction on the second driveway.
Commissioner Daniel echoed Commissioner Putnam and Chairperson
Woods suggestion that the item be deferred.
Commissioner Brandon voiced her concern that the landscape areas
are not shown on the plan.
Commissioner Adcock said that the presented site plan did not
reflect what had been explained to her as the planned
development.
Mr. Trammell said that he would prefer to resolve the concerns
during the process of staff review in view of a building permit,
but if the Commissioner required it, he would request the
suggested deferral.
A motion was made and seconded to defer the hearing of the item
until the April 25th. Commission meeting, with the requirement
that the applicant will submit revised drawings by the March
18th. filing date and be reviewed by the Subdivision Committee on
April 4th. The motion carried with the vote of 10 ayes, 0 nays,
1 absent, 0 abstentions, and 1 open position.
7