HomeMy WebLinkAboutZ-4853-C Staff AnalysisOctober 10, 1996
ITEM NO.: 8
NAME: EAGLE HILL COUNTRY CLUB
DEVELOPER:
Lindsey Management Company
300 Front Street
Fayetteville, AR 72702
FILE
ENGINEER•
.. Z -4853 -
Tim Daters
WHITE-DATERS AND ASSOC.
401 South Victory
Little Rock, AR 72201
AREA: 239 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: MF -6 (Multifamily District 6 du/ac)
PLANNING DISTRICT: 17, Crystal Valley
CENSUS TRACT: 42.08
VARIANCES REQUESTED: Defer improvements to Colonel Miller Road
until future phases.
BACKGROUND:
This property was rezoned by the Planning Commission in July 1996
to Multifamily District with a maximum density of six units per
acre. In the end of August 1996, the applicant filed a
conditional use permit (Z -4853-B) to permit an 18 hole golf
course and a Site Plan Review (Z -4853-C) for apartments.
A. PROPOSAL/REQUEST:
The site totals 239 acres generally located north of
Baseline Road and east of Colonel Miller Road. An 18 hole
golf course (Z -4853-B), 32 two-story apartment buildings
totaling 384 units, 889 open parking spaces, golf club
house, and other recreation areas are planned. The 384
residential units breakdown as 128 one bedroom and 256 two
bedroom apartments. The detailed site plan illustrates the
apartment building locations along the golf course and the
internal roadway network.
B. EXISTING CONDITIONS:
The Otter Creek Community is situated to the south of the
proposed Eagle Hill Country Club. The primary access to The
Club will be opposite Wimbleton Drive. The land use on the
west side of Colonel Miller Road includes an auto salvage
yard, mini -storage, church and single family. The land use
to the north including adjacent Crystal Valley Road is a
October 10, 1996
SUBDIVISION
ITEM NO • 8 Cont.) FILE NO.: Z -4853-C
mixture of vacant and single family residential. The
Henderson United Methodist Church is situated at the
southeast corner of the proposed Eagle Hill Golf Club.
C. NEIGHBORHOOD COMMENTS:
One letter to date not taking a position on the proposal.
D. ENGINEERING COMMENTS:
PUBLIC WORKS COMMENTS
Considerable topographic, grading, drainage plan, special
flood hazard permit, and other appropriate information will
be required prior to construction. Including ADPC&E
approval and United States Army Corp of Engineers, Little
Rock District approval will be required prior to start of
work. The submitted plan does not properly show the
floodway boundaries, the floodplain boundaries and the
required drainage improvements. It should show those
required improvements and should be discussed prior to
approval of this site plan. Construction of the lakes,
fairways, tee boxes, and greens within the floodway area as
represented will not be approved, as shown, until extensive
engineering study work has been done for this large drainage
basin map floodway. Plans submitted, are therefore, subject
to change, based upon being able to certify that this
construction can be done and approved by the various
determining agencies relative to the floodplain and
floodway. Baseline Road is a principal arterial that
requires dedication of right-of-way to 55 feet from
centerline and initial construction requires dedication of
right-of-way to 55 feet from centerline and initial
construction requires widening to 30 feet from centerline
with curb and gutter and sidewalk. Colonel Miller Road is a
minor arterial with 45 foot of right-of-way from centerline
and 30 feet of construction from centerline. A right turn
lane on Baseline at Colonel Miller is required with
additional right-of-way. There is extensive drainage on
West Baseline Road and Colonel Miller and a 1 in 50 year
storm for Baseline will be required including improvements
of any cost drains. 100 percent of cost drains will be
required with the construction improvements for West
Baseline and Colonel Miller Road. The first entry drive off
of Colonel Miller Road does appear to have a crossing than
is less than 75 feet from the right-of-way of Colonel Road
in conflict with City ordinance. Staff recommends that
internal sidewalks be connected to the public sidewalk to be
constructed on Baseline Road and Colonel Miller Road. The
sidewalk requirements for Baseline Road will need meet ADA
standards. Staff recommends a 5 foot sidewalk at the
property line versus a sidewalk at the back of curb.
2
October 10, 1996
SUBDIVISION
ITEM NO.: 8 Cont. FILE NO.: Z -4853-C
Stormwater detention provisions of the drainage ordinances
do apply to this development. A phasing line should be
shown and any roads or drives that cross the floodway. All
structures will have to be design for the 100 year storm
event. Prior to Planning Commission, plans indicating the
floodway limits and floodplain contours will be required.
Minimum floor elevations for all structures and all
exteriors components of those structures shall be raised to
one foot above all BFE elevations. They should be indicated
on the plan. There is a large bold line shown on the plan
that indicates that the ownership on the apartments units
will be separated from the ownership of the golf facility.
Therefore the access drive to this multiple lot facility
shown to be a 36 foot drive is to be constructed. Recommend
a turn -around device prior to accessing the parking for the
club house and the 36 foot drive should have sidewalks on
both sides required by the subdivision ordinances. The Plan
shows a private drive that connects Baseline Road to the
drive that enters and connects to the club house area. This
makes a private drive that connects two public streets in
violation of City ordinance. The private street that
accesses across the golf course lot and connects the two
complexes should be built to commercial standards with
sidewalks. Staff recommends the minimum width of all
interior drives be 27 feet which is a minor commercial
standard and include a sidewalk. The Traffic Engineer
recommends several drive changes to be discussed at the
Subdivision Committee meeting. 1992 Arkansas Highway
Department daily traffic count numbers for Baseline Road is
3,200 vehicles per day. Colonel Miller Road extension to
Crystal Valley shows a count at the junction of Crystal
Valley Road and Lawson Road of 1,840 vehicles per day. Each
unit from within this complex will add approximately 10
trips per day to these traffic numbers.
E. UTILTTIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements.
Capacity analysis is required.
Arkla: No comment
Southwestern Bell: OK
Water: Pro rata footage charges of $15/foot on Baseline
Road and $150/acre apply.
AP&L : No comment
Fire Department: Submit revised Site Plan for Fire
Department review.
County Plannin : See attachment
3
October 10, 1996
SUBDIVISION
ITEM NO.: 8(Cont.)FILE NO.: Z -4853-C
F. ISSUES/TECHNICAL/DESIGN
Landscape:
The proposed street and land use buffers meet and exceed
ordinance requirements when averaged out. However, a
portion of the street buffer along Colonel Miller Road drops
to an approximate width of 18 feet. The full width
requirement in this area is 40 feet. Also, portions of the
proposed parking lots intrude considerably into the 50 foot
full street buffer requirement along Baseline Road and the
50 foot eastern land use buffer adjacent to Henderson United
Methodist Church.
Areas set aside for landscaping appear to meet with
Landscape Ordinance requirements. A six foot high opaque
wooden fence with its face directed outward or dense
evergreen plantings are required to screen this site from
the residential properties to the north and east. Credit
can be given for existing dense vegetation to remain. If
dumpsters are to be used, they must be shown on the site
plan and screened to a height of eight feet on three sides.
This screen must be either a wood fence or wall.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
Issues•
The following are unresolved items on the site plan review
submittal.
9 Sign dimensions and design
■ Lighting Plan
• How will areas designated for future development be
maintained? Will they be landscaped?
• Will the volleyball, basketball or tennis courts be
lighted?
These items are conditions as agreed to by the developer
September 25, 1996.
■ The drive connection between buildings 1 and 4 to Colonel
Miller would be gated and closed. This access would be
available for use by emergency vehicles.
■ Defer improvements to Colonel Miller Road until that
portion of the project adjacent to that road is
developed. The required street improvements would be
constructed at the Baseline Road/Colonel Miller
intersection.
4
October 10, 1996
SUBDIVISION
ITEM NO.- 8 Cont. FILE NO.: Z -4853-C
G. ANALYSIS
The applicant and project engineer have largely answered
staff questions concerning Phase 1 of the development.
Phase 1 as addressed in this Site Plan Review application
(Z -4853-C) will consist of 32 two-story apartment buildings.
Each building will include 8 -two bedroom and 4 -one bedroom
units. The totals are 256 -two bedroom and 128 -one bedroom
units for 384 units overall. There will be a minimum of 889
open apartment parking spaces exclusive of the club house
area.
H. STAFF RECOMMENDATIONS:
APPROVAL of the site plan subject to the project description
and conditions outlined in Sections D, E, F and G of this
report.
SUBDIVISION COMMITTEE COMMENT:
(SEPTEMBER 19, 1996)
Tim Daters, project engineer, presented the Site Plan Review and
Conditional Use Permit. Both items were discussed by the
Committee as part of the overall development. The applicants
clearly defined the various elements of the Phase 1 portion of
Eagle Hill Country Club.
The Subdivision Committee determined that the item should be
forwarded to the full Commission for consideration.
PLANNING COMMISSION ACTION:
(OCTOBER 10, 1996)
Tim Daters presented the project and explained the phasing of
road improvements for Colonel Miller and Baseline Roads. The
applicant proposes a left turn lane built to rural standards at
the clubhouse entrance from Colonel Miller Road. All
improvements on Baseline Road from wimbleton Drive east will be
constructed. The -balance of road improvements on Baseline to
Colonel Miller and all improvements on Colonel Miller except the
rural standard left turn lane will be deferred for a maximum of
three years. These roadway improvements could be done sooner
than three years if one of the two following conditions occur.
If during that period a 24 hour traffic count on the impacted
roads shows volume of 5,000 + ADT or if phase 2 is developed. If
one or both of these conditions exist than the applicant has the
choice of putting in the deferred road improvements or closing
the project access to Colonel Miller Road. The improvements will
be installed regardless after three years. Mr. Lawson stated
that staff recommends approval of the stated deferral request.
6i
October 10, 1996
SUBDIVISION
ITEM NO.• 8 (Cont.) FILE NO.: Z -4853-C
A motion to approve the site plan review passed with 9 ayes,
0 nays and 2 absent. A motion to approve the waiver of road
improvements as stated in this minute record for up to three
years. Motion passed with 9 ayes, 0 nays and 2 absent.
6