CLEARING AND GRADING PLAN
LOT 5 & LOT 7
TUCKER'S COMMERCIAL ACRES
/ \ To the City of Little Rock,
/
/ Pulaski County, Arkansas
For use and benefit of. Gold Star Dairy & Turner Holdings, LLC
Address otProperty: 6901 Interstate 30, Little Rock, AR 72209
Date of Survey: August , 2001
Scale: 1"= 50'
LAHA ENGINEERS, INC.
P. 0. Box 190251
Little Rock, Arkansas 72219
501-565-7384
Fax 501-562-5467
e-mail: lahaengrls@msn.com
/
Ivcam
1y .
,y
S.
QO Finished Floor Elevation
256.23 @ Front Door
Height 19.4'
100 Year Flood Elevation 257.0
HT=49'
Other Ex Tanks HT = 32'
HT = 49'
1Ak ;
19
X \
O
Turner Holding LLC
2040 Madison Ave
Memphis, TN
^/
C6
mf
LANDSCAPE BUFFERS
ROW to back property line along NE line Lot 5 = 280'W = 280 x 6% = 16.8'
ROW to back fence along common line Lots 5 & 7 = 41 0' W = 410 x 6% = 24.6'
ROW to back fence along SW line Lot 7 = 41 0' W = 410 x 6% = 24.6'
Total area in Buffer = 14308 SF
Frontage = 262 + 310.1 = 622.1'
Average Width of Buffer = 23'
N
eo'
goo
-
SCALE I"= 50'
*
FOUND IRON PIN
*
SET NO, 4 REBAR
,1h•
OVERHEAD POWER LINE
CO
POWER POLE
i i
FIRE HYDRANT
y
GAS METER
O
EXISTING STRUCTURE
®
PROPOSED STRUCTURE
This material to be removed from site.
PROPOSED STRUCTURE IN FLOODWAY
E::�
4.
LIMIT OF CLEARING
M1
FINISHED GRADE
LANDSCAPE BUFFERS
ROW to back property line along NE line Lot 5 = 280'W = 280 x 6% = 16.8'
ROW to back fence along common line Lots 5 & 7 = 41 0' W = 410 x 6% = 24.6'
ROW to back fence along SW line Lot 7 = 41 0' W = 410 x 6% = 24.6'
Total area in Buffer = 14308 SF
Frontage = 262 + 310.1 = 622.1'
Average Width of Buffer = 23'
FINAL PLAT -LITTLE ROCK
SUBDIVISION & ZONING ORD SECTION 31-118 Certificates.
CERTIFICATE OF SURVEYING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a boundary survey
made or verified by me, all monuments required actually exist and are correctly
shown hereon and that all surveying requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Surveyor
No. 284, Arkansas
CERTIFICATE OF ENGINEERING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a plan made
by me, and that the engineering requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Engineer
No. 1735, Arkansas
CERTIFICATE OF OWNER
We, the undersigned, owners of the real estate shown and described herein, do hereby
ceritify that we have laid off , platted, and subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with this plat.
Date of Execution Turner Holdings LLC
+yl p 2040 Madison Ave
m �5h Notes Memphis, TN 38104
i / 1. All clearing and excavation shall be conducted in accordance with the Instrument No. 00 005689
City of Little Rock Ordinances in effect on the date of approval.
2. Trees and vegetation outside the clearing area shall not be disturbed.
3. All areas of excavation not covered with base course within two (2) weeks
\ shall be covered with straw mulch. Lot 1 at the rate of 2 tons per Acre loose.
Lot 2 at the rate of 2 tons per acre tacked.
CERTIFICATE OF FINAL APPROVAL
Pursuant to the Little Rock Subdivision Rules and Regulations, and all of the conditions
of approval having been completed, this document is hereby accepted, this certificate is
hereby executed under the authority of said Rules and Regulations.
Date of Execution Little Rock Planning Commission
N
29 28 CERTIFICATE OF RECORDING
-�
yam 32 33 This document number filed for record
\ \ y 7 C 2000 in Plat Book Page
i rM (Signed) _
REVISED o
EXCAVATION U) (Name) Clerk
't. AREA
8850 SF
AVG D-2'
I m
M
r% %
l V-7,
0,1d 9x22; jo4an,) �4 {M!
Relay O "ittingditrh »•eca, 726.02
MlD nVAE 4 7.26-137
fSYTEd Oti6(77.U7
� - W,2 7-6
C rn
CONSTRUCTION SEQUENCE
CO
CO
1.
Clear entire area to limits of clearing.
rn
2.
Place silt fence at edge of clearing.
y
3.
Strip 1 foot of top soil from grading and revised excavation areas.
U
o
This material to be removed from site.
4.
Place straw on revised excavation area at the rate of 2 tons per acre.
5.
Remove and stockpile existing base material from existing gravel parking lot.
J
6.
Grade existing parking lot to new grade. Place material on parking lot 1.
\
0
7
Place stockpiled base material on parking lot 1
U
8.
Under cut existing parking lot 8" and remove from site.
\
9.
Place 8" new base material on existing parking lot.
1o. Place 8" new base material on parking lot 1.
11. Place 12" new base on parking lot 2.
FINAL PLAT -LITTLE ROCK
SUBDIVISION & ZONING ORD SECTION 31-118 Certificates.
CERTIFICATE OF SURVEYING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a boundary survey
made or verified by me, all monuments required actually exist and are correctly
shown hereon and that all surveying requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Surveyor
No. 284, Arkansas
CERTIFICATE OF ENGINEERING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a plan made
by me, and that the engineering requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Engineer
No. 1735, Arkansas
CERTIFICATE OF OWNER
We, the undersigned, owners of the real estate shown and described herein, do hereby
ceritify that we have laid off , platted, and subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with this plat.
Date of Execution Turner Holdings LLC
+yl p 2040 Madison Ave
m �5h Notes Memphis, TN 38104
i / 1. All clearing and excavation shall be conducted in accordance with the Instrument No. 00 005689
City of Little Rock Ordinances in effect on the date of approval.
2. Trees and vegetation outside the clearing area shall not be disturbed.
3. All areas of excavation not covered with base course within two (2) weeks
\ shall be covered with straw mulch. Lot 1 at the rate of 2 tons per Acre loose.
Lot 2 at the rate of 2 tons per acre tacked.
CERTIFICATE OF FINAL APPROVAL
Pursuant to the Little Rock Subdivision Rules and Regulations, and all of the conditions
of approval having been completed, this document is hereby accepted, this certificate is
hereby executed under the authority of said Rules and Regulations.
Date of Execution Little Rock Planning Commission
N
29 28 CERTIFICATE OF RECORDING
-�
yam 32 33 This document number filed for record
\ \ y 7 C 2000 in Plat Book Page
i rM (Signed) _
REVISED o
EXCAVATION U) (Name) Clerk
't. AREA
8850 SF
AVG D-2'
I m
M
r% %
l V-7,
0,1d 9x22; jo4an,) �4 {M!
Relay O "ittingditrh »•eca, 726.02
MlD nVAE 4 7.26-137
fSYTEd Oti6(77.U7
� - W,2 7-6