CLEARING AND GRADING PLAN
LOT 5 & LOT 7
TUPKER'S COMMERCIAL ACRES
To the City of Little Rock,
/
/ Pulaski County, Arkansas
wr.--
/ For use and benefit of: Gold Star Dairy & Turner Holdings, LLC
Address of Property: 6901 Interstate 30, Little Rock, AR 72209
Date of Survey: August , 2001
Scale: 1"= 50'
LAHA ENGINEERS, INC.
P. 0. Box 190251
Little Rock, Arkansas 72219
501-565-7384
Fax 501-562-5467
e-mail: lahaengrls@msn.com
QCs
�Q.
r
o�
R
/j
{ ss7o Turner Holding LLC
�7• 2040 Madison Ave
\ �9% Memphis, TNS
41
Oev i,
FINAL PLAT -LITTLE ROCK
SUBDIVISION & ZONING ORD SECTION 31-118 Certificates.
CERTIFICATE OF SURVEYING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a boundary survey
made or verified by me, all monuments required actually exist and are correctly
shown hereon and that all surveying requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
yfi I� Date of Execution
S.
O� Finished Floor Elevation
256.23 @ Front Door
Height 19.4'
100 Year Flood Elevation 257.0
HT = 49'
Other Ex Tanks HT = 32'
HT 49' R
A^.
A III I
/
X
a
REVISED
EXCAVATION
AREA
3850 SF
AVG D=2'
LANDSCAPE BUFFERS
ROW to back property line along NE line Lot 5 = 280'W = 280 x 6% = 16.8'
ROW to back fence along common line Lots 5 & 7 = 410' W = 410 x 6% = 24.6'
ROW to back fence along SW line Lot 7 = 41 0' W = 410 x 6% = 24.6'
Total area in Buffer = 14308 SF
Frontage = 262 + 310.1 = 622.1'
Average Width of Buffer = 23'
N
TRUCTION SEQUENCE
601 11001
U) LO
SCALE V = 50'
*
FOUND IRON PIN
o
SET NO, 4 REBAR
-Irv-
OVERHEAD POWER LINE
C?
POWER POLE
r
U
FIRE HYDRANT
Strip 1 foot of top soil from grading and revised excavation areas.
GAS METER
O
EXISTING STRUCTURE
®
PROPOSED STRUCTURE
PROPOSED STRUCTURE IN FLOODWAY
O
LIMIT OF CLEARING
5.
FINISHED GRADE
FINAL PLAT -LITTLE ROCK
SUBDIVISION & ZONING ORD SECTION 31-118 Certificates.
CERTIFICATE OF SURVEYING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a boundary survey
made or verified by me, all monuments required actually exist and are correctly
shown hereon and that all surveying requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
yfi I� Date of Execution
S.
O� Finished Floor Elevation
256.23 @ Front Door
Height 19.4'
100 Year Flood Elevation 257.0
HT = 49'
Other Ex Tanks HT = 32'
HT 49' R
A^.
A III I
/
X
a
REVISED
EXCAVATION
AREA
3850 SF
AVG D=2'
LANDSCAPE BUFFERS
ROW to back property line along NE line Lot 5 = 280'W = 280 x 6% = 16.8'
ROW to back fence along common line Lots 5 & 7 = 410' W = 410 x 6% = 24.6'
ROW to back fence along SW line Lot 7 = 41 0' W = 410 x 6% = 24.6'
Total area in Buffer = 14308 SF
Frontage = 262 + 310.1 = 622.1'
Average Width of Buffer = 23'
/ 29,28
32 33
zo
N
O
M
L0
C1
O
M
0
Q
Notes
1. All clearing and excavation shall be conducted in accordance with the
City of Little Rock Ordinances in effect on the date of approval.
2. Trees and vegetation outside the clearing area shall not be disturbed.
3. All areas of excavation not covered with base course within two (2) weeks
shall be covered with straw mulch. Lot 1 at the rate of 2 tons per Acre loose.
Lot 2 at the rate of 2 tons per acre tacked.
Troy D. Laha
Registered Professional Surveyor
No. 284, Arkansas
CERTIFICATE OF ENGINEERING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a plan made
by me, and that the engineering requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Engineer
No, 1735, Arkansas
CERTIFICATE OF OWNER
We, the undersigned, owners of the real estate shown and described herein, do hereby
ceritify that we have laid off , platted, and subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with this plat.
Date of Execution
Instrument No. 00 005689
Turner Holdings LLC
2040 Madison Ave
Memphis, TN 38104
CERTIFICATE OF FINAL APPROVAL
Pursuant to the Little Rock Subdivision Rules and Regulations, and all of the conditions
of approval having been completed, this document is hereby accepted, this certificate is
hereby executed under the authority of said Rules and Regulations.
Date of Execution Little Rock Planning Commission
CERTIFICATE OF RECORDING
This document number filed for record
2000 in Plat Book Page
(Signed)
(Name) Clerk
C.1
7126 z.
Md fkS�(}r�argna L;g-lG?
Nekef9e exiNutptlifCr, e�c[x 7-76112
MlrrnME4 7.26-01
Po'ettwr] 07.::7-0:!
CCONS
TRUCTION SEQUENCE
U) LO
Ce)
1.
Clear entire area to limits of clearing.
rn
2.
Place silt fence at edge of clearing.
r
U
3.
Strip 1 foot of top soil from grading and revised excavation areas.
This material to be removed from site.
4.
Place straw on revised excavation area at the rate of 2 tons per acre.
5.
Remove and stockpile existing base material from existing gravel parking lot.
6-
Grade existing parking lot to new grade. Place material on parking lot 1.
7.
Place stockpiled base material on parking lot 1.
\
T
U
8.
Under cut existing parking lot 8" and remove from site.
\
9.
Place 8" new base material on existing parking lot.
10. Place 8" new base material on parking lot 1.
\
11. Place 12" new base on parking lot 2.
/ 29,28
32 33
zo
N
O
M
L0
C1
O
M
0
Q
Notes
1. All clearing and excavation shall be conducted in accordance with the
City of Little Rock Ordinances in effect on the date of approval.
2. Trees and vegetation outside the clearing area shall not be disturbed.
3. All areas of excavation not covered with base course within two (2) weeks
shall be covered with straw mulch. Lot 1 at the rate of 2 tons per Acre loose.
Lot 2 at the rate of 2 tons per acre tacked.
Troy D. Laha
Registered Professional Surveyor
No. 284, Arkansas
CERTIFICATE OF ENGINEERING ACCURACY
I, Troy D. Laha, hereby certify that this plat correctly represents a plan made
by me, and that the engineering requirements of the Little Rock Subdivision
Rules and Regulations have been complied with.
Signed,
Date of Execution
Troy D. Laha
Registered Professional Engineer
No, 1735, Arkansas
CERTIFICATE OF OWNER
We, the undersigned, owners of the real estate shown and described herein, do hereby
ceritify that we have laid off , platted, and subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with this plat.
Date of Execution
Instrument No. 00 005689
Turner Holdings LLC
2040 Madison Ave
Memphis, TN 38104
CERTIFICATE OF FINAL APPROVAL
Pursuant to the Little Rock Subdivision Rules and Regulations, and all of the conditions
of approval having been completed, this document is hereby accepted, this certificate is
hereby executed under the authority of said Rules and Regulations.
Date of Execution Little Rock Planning Commission
CERTIFICATE OF RECORDING
This document number filed for record
2000 in Plat Book Page
(Signed)
(Name) Clerk
C.1
7126 z.
Md fkS�(}r�argna L;g-lG?
Nekef9e exiNutptlifCr, e�c[x 7-76112
MlrrnME4 7.26-01
Po'ettwr] 07.::7-0:!