HomeMy WebLinkAboutZ-4805 Staff AnalysisMay 5, 1987
Item No. 4 - Z-4805
Owner: Glen Buchanan
Applicant: Same
Location: 4919 Baseline Road
Request: Rezone from "R-2" to 11I-2"
Purpose: Manufacturing (Millwork)
Size: 1.04 acres
Existing Use: Industrial and Single Family
SURROUNDING LAND USE AND ZONING:
North - Vacant and Commercial, Zoned "R-2"
South - Church, Zoned "R-2"
East - Single Family, Zoned "R-2"
West - Commercial, Zoned "R-2"
PLANNING CONSIDERATIONS:
1. The issue before the Commission is to rezone a tract of
land on Baseline Road from "R-2" to "I-2." The
property has a nonconforming use on it, and the owner
desires to have the use and zoning conform. The site
is located approximately one mile east of Geyer Springs
Road and in an area that.has a very mixed land use
pattern. The uses include residential, office,
commercial, churches and a school. In addition to the
industrial use on this tract, there are several vehicle
repair facilities to the north on Stanton and Dreher
Lane which could be considered industrial but do not
necessary require industrial zoning. The zoning is
primarily "R-2" Single Family with the exception of the
northeast corner of Stanton and Baseline which is
"C-3." Other zonings in the vicinity include "R-4,"
"0-3" and "PRD." This property abuts residential
zoning on three sides and across Baseline the land is
zoned "R-2."
2. The site is approximately one acre in size and occupied
by a total of seven structures. Five of the buildings
are used for the industrial operation and on the front
portion of the property there is a single family
residence with a detached garage.
May 5,1987
Item No. 4 - Continued
3. Baseline Road is classified as a principle arterial
which normally requires a right-of-way at least 100
feet. Dedication of additional right-of-way will be
required because the survey shows a right-of-way of
approximately 35 feet from the center line.
4. There have been no adverse comments received from the
reviewing agencies as of this writing.
5. There are no legal issues.
6. There is no documented neighborhood position on the
property. The area was annexed to the City in
April 1985 through the court decision on the referendum
area.
7. This location is part of the Geyer Springs East
District Plan which was adopted by the City in May
1986. For this section of Baseline Road, the Land Use
Plan recommends commercial development for both sides
and there is no industrial identified in the immediate
vicinity. Staff's position is that the plan's concept
should be maintained and does not support the "I-2"
request. The plan shows large industrial areas to be
located adjacent to I-30 and Arch Street Pike which are
more suitable for continued industrial development
and/or expansion. Supporting an industrial rezoning
for this property could create some problems and set
precedent for an undesirable zoning configuration along
this portion of Baseline. Finally, the 11I-2" request,
if granted, would establish an industrial spot zoning
which is not good planning.
STAFF RECOMMENDATION:
Staff recommends denial of the 11I-2" rezoning.
PLANNING COMMISSION ACTION:
The applicant, Glen Buchanan, was present. There were no
objectors. Mr. Buchanan said that he manufactures wood
products and the use has been in operation for approximately
14 years. He told the Commission that he wanted the
property rezoned because of being nonconforming and he could
not rebuild if the structures were destroyed. There was a
long discussion about Mr. Buchanan's use and the Geyer
Springs East District Plan. Mr. Buchanan addressed the
Commission again about various issues including his concerns
with potential problems because of being zoned "R-2." After
some additional comments, Mr. Buchanan requested a vote on
May 5, 1987
Item No. 4 - Continued
the "I-2" rezoning. Before action was taken on the request,
the Commission discussed Mr. Buchanan's use which he
described as being more of a woodworking shop with the work
being done on a job -by -job basis. There was some discussion
about a possible "C-3" rezoning instead of "I-2" because of
the use. This was debated for awhile, and then a motion was
offered to defer the rezoning request and refer the
definition question to the Board of Adjustment. The motion
failed for lack of a second. The Commission then questioned
the need for right-of-way and staff reported that additional
right-of-way would be required because Baseline Road is
classified as a principal arterial. Mr. Buchanan told the
Commission that he would not agree to -dedicating the
right-of-way and requested a vote on the 1I-2" application.
A motion was made to recommend approval of the "I-2" request
as filed. The vote was 0 ayes, 10 noes, and 1 absent. The
rezoning was denied.