HomeMy WebLinkAboutZ-4796-A Staff AnalysisFILE NO.: Z-47 6-A
NAME: RIVERSIDE BOX SUPPLY, INC. -- SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION:-- On. -the -north side of Fourche Dam Pike, at 7008 Fourche
Dam Pike
DEVELOPER:
ENGINEER:
Kenneth R. Ring Samuel L. Davis
RIVERSIDE BOX SUPPLY CO., INC. S. DAVIS CONSULTING, INC.
P. O. Box 95004 5301 West 8th. Street
Little Rock, AR 72295-5004 Little Rock, AR 72204
490-1569 664-0324
AREA: 9.1 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2 PROPOSED USES: Warehouse & Distribution;
Mini -storage facility; and
single-family residential
PLANNING DISTRICT: 25
CENSUS TRACT: 40.03
VARIANCES RE RESTED:
1. Approval of a 5 -year deferral of boundary street
improvements to Fourche Dam Pike.
2. Approval of a waiver of the sidewalk along the Fourche
Dam Pike frontage of the site.
3. Approval of a waiver of the requirement to provide a
paved driveway and maneuvering area to and around the
mini -storage facility.
4. Approval of a variance from the requirement to provide
24 foot wide driveways on the site.
STATEMENT OF PROPOSAL:
The applicant proposes a mixed-use planned development in order
to: 1) construct an addition to an existing warehousing and
distribution business facility; 2) construct two additional
mini -warehouse buildings; and, 3) continue using a residential
structure located on the property for residential use.
The existing warehouse and distribution building is an 18,000±
building. There is a loading dock and covered loading area in
conjunction with this building. Offices for the business are
located in a detached 950 square foot building. An asphalt
FILE-47 -A C nt.
parking area for 15 vehicles is provided. There is an existing
10 foot wide asphalt drive extending northward from Fourche Dam
Pike to the north edge of the distribution-warehouse building.
This drive provides access-to, not only the distribution-
warehouse building, but to the office structure, the existing
mini-storage buildings, and the residence located on the
property.
The existing mini-storage buildings are located north of the
existing distribution-warehouse building. There are two
buildings, one with 3,000 square feet; the second, 6,000 square
feet.
There is a residence on the property, immediately off Fourche Dam
Pike, plus two storage buildings.
The applicant proposes, as a phase I development, to construct a
29,000 square foot addition to the distribution-warehouse
building. This addition is planned to be built along the west
side of the existing building. It is to house, not only
additional warehousing space, but office space for the business.
It is to be a single-story building, with walls at 14 feet high
and the roof peak at 20 feet. Phase I is to be undertaken in
1995.
The phase II development is to involve the first of two
additional mini-storage buildings. This building is planned to
be a 6,000 square foot building containing 40 storage spaces.
The building is proposed to be a single-story building, with 8
foot high walls. Phase II development is proposed to take place
in 1997, or later.
The phase III development involves constructing another addition
to the distribution-warehouse building. The addition is to
provide another 40,000 square feet of warehousing area, and is to
be an extension of the phase I building to the north. This phase
is planned for 2000 or later.
The phase IV development is the construction of the second mini-
storage building. It, too, is a 6,000 square foot building,
containing 40 units, and with 8 foot high walls. This phase is
planned for 2001 or later.
The hours of operation of the business and of the mini-storage
are, currently, 8:00 AM to 5:00 PM, Monday through Friday. The
present hours of operation are not planned to be changed. The
applicant proposes to install fencing and lighting for the
security of the site. The existing 10 foot wide asphalt driveway
is proposed to remain "as-is". No extension of the driveway is
proposed or is, according to the applicant, needed. The
applicant explains that, due to the very flat topography of the
site, paving around the mini-storage buildings would cause
flooding of these units; therefore, the applicant seeks a waiver
of the requirement that the access to and maneuvering space
FILE NO.: Z-47 -A (Cont-)
around the mini -storage units be paved. These drives are
currently gravel, and, according to the applicant, provide
acceptable access to the mini -storage facility. The applicant
explains that there are seven employees, and that the 15 parking
spaces is sufficient. The 10 foot wide drive, the applicant
states, serves the needs of the site without any problems. A
variance from the requirement that a 24 foot drive be provided is
sought. Fourche Dam Pike is built to county road standards, and
there is no other development in the area which would cause the
roadway to be widened. The applicant, then, seeks a five-year
deferral of the requirement that Fourche Dam Pike be widened to
Master Street Plan standards. The applicant is, however,
amenable to dedicating the required right-of-way for Fourche Dam
Pike. The area is in a rural setting. There are no other
sidewalks along Fourche Dam Pike, states the applicant. A wavier
of the requirement to construct a sidewalk along the Fourche Dam
Pike frontage of the site, then, is requested.
A. PROPOSAL RE UEST:
Review by the Planning Commission and approval by the Board
of Directors is requested for a Planned Commercial
Development for a mixed use development involving a
distribution and warehousing use, a mini -storage use, and a
residential use.
A five-year deferral is requested for having to provide
boundary street improvements to Fourche Dam Pike; a wavier
is requested from the requirement that a sidewalk be
constructed along the Fourche Dam Pike frontage of the
property; a waiver is sought from the requirement that a
paved driveway and maneuvering space be provided to and
around the mini -storage buildings; and, a variance is
requested from the requirement that the on-site drives be 20
feet, and permit the existing 10 foot wide drive to remain
"as -is".
B. EXISTINGCONDITIONS:
The site is currently occupied by the applicant. It
contains the existing 18,000 square foot warehouse and a
covered dock area, a 950 square foot office structure, two
mini -storage buildings, a residence, and two out -buildings.
The site, reports the applicant, was purchased, with the
current warehouse and mini -storage buildings being built, in
1980-82, when the area was outside the City Limits. The
City, the applicant reports, annexed the area in 1983, from
which time there has been no additional construction
undertaken.
The site is currently zoned R-2, with the R-2 zoning
district extending to all properties surrounding the site.
3
FILE Z-47 6-A nt.
W
42
ENGI EERI TILITY MMENT :
The Public Works staff notes the following:
1) The property is located in Zone X, per FIRM 050181
0014E, dated 11/3/93. A grading and NPDES Permit
Notice of Intent must be submitted prior to beginning
work on the site.
2) All drives should asphalt and be a minimum of 24' in
width to provide adequate access for emergency
vehicles. A cul-de-sac or suitable alternative must be
provided at the end of the drive to allow vehicles to
turn around. The apron at the public street should
have minimum turn -out radii per City standards.
3) Right-of-way to meet City standards must be dedicated.
Fourche Dam Pike is a collector street, which requires
60' of right-of-way (wider if open ditches are provided
along the roadway). The minimum width of pavement is
361, and a sidewalk is required along the Fourche Dam
Pike frontage of the site. Construct 1/2 of the
required boundary street section.
4) A stormwater detention analysis is required.
Water Works comments that on-site fire protection will be
required.
Wastewater Utility comments that a sewer main extension,
with easements, will be required.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. approved the submittal
without comment.
The Fire Department commented that a 20' asphalt driveway
will be required to be added. On-site fire hydrants may be
required.
ISSUES/LEGAL/TECHNICAL/DES_TGN:
Sec. 31-201.h of the Code states: "Whenever a (development)
abuts a partially dedicated or constructed public street,
the developer shall provide the minimum of one-half of the
required improvements and right-of-way." The applicant is
seeking a 5 -year deferral from the requirement that Fourche
Dam Pike be constructed to Master Street Plan standards, and
a waiver of the requirement to construct the sidewalk.
These two requests, the deferral and wavier of boundary
street and sidewalk requirements must be approved by the
Board of Directors. The variance involving pavement width
4
FILE NO.: Z-47 -A Cont.
and the waiver of the requirement to proved a paved driveway
and maneuvering space are staff -level matters.
The Neighborhoods and Planning Site Plan Review Specialist
comments that a 6' high opaque screen, either a wooden fence
with the face directed outward or dense evergreen planting,
is required along the north, east, and west property lines.
Additional screening may not be required west of the
proposed main building, provided the building has no windows
or doors on its west side. Trees with an average spacing of
40' and shrubs at 10' are required within the land use
buffers along the north, east, and west property lines.
Compliance with the Landscape Ordinance will be required.
The Planning staff reports that the planned development is
in the Port District. The adopted Land Use Plan recommends
single-family use of the site. The existing use is in
conflict with the plan.
E. ANALYSIS:
Although the existing use is in conflict with the adopted
Land Use Plan, it is an existing use. The applicant
maintains that the proposed building additions and
structures are being requested in order to continue the
present non -conforming use; no change in use, or addition of
other uses is proposed. Staff can support the applicant's
request on that basis.
Because the area of the applicant's property along Fourche
Dam Pike is in an area that is not developing at this time,
staff can support the deferral of the improvements to
Fourche Dam Pike and the waiver of the sidewalk requirement.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development and of
the boundary street deferral and sidewalk waiver.
SUBDIVISION COMMITTEE COMMENT:
(JUNE 8, 1995)
Mr. Kenneth Ring, the applicant, was present. The Planning staff
outlined the request and reviewed with Mr. King the comments
contained in the discussion outline. The Public Works staff
explained the Public Works comments; specifically, the comments
concerning the Master Street Plan requirements. The Planning
staff commented that the site plan needed to have more detail
provided concerning landscaping, buffer fencing, and access
drives to the existing and new mini -storage buildings. Mr. King
responded that he would get with his design professional, and
that they would meet with staff in the following days. The
Committee forwarded the item to the full Commission for the
public hearing.
5
FILE O.: Z-47 6-A Cont.
PLANNING COMMISSION ACTION: (TUNE 27, 1995)
The Chairman asked Bobby Sims, of the Planning Staff, to present
the item and staff recommendation. Sims outlined the
application, the various variances and waivers that have been
requested
1. A deferral of the street improvements on the boundary
street, Fourche Dam Pike, for a period of 5 years
2. Approval of a waiver of sidewalk along Fourche Dam Pike
3. Approval of a waiver of parking and driveway maneuvering
space internal to the development to be retained as it
currently exists.
4. A waiver of the driveway width providing circulation from
the street to the various elements of the project. Normal
requirement is 20 to 24 feet. Applicant desires to retain
the approximate 10 foot driveway as it now exists.
Staff recommendation is approval of the project with a specific
position on the waivers. The recommendation concerning the
physical improvements and waivers to be offered by Public Works.
The Chairman then asked that David Scherer, of Public Works, come
forward and address this issue.
Scherer announced that Public Works did not have a problem with
the deferral of the improvements on the street, Fourche Dam Pike.
He pointed out they normally prefer less than 5 years, normally
2 or 3 years is what is offered by the Commission. He added an
additional comment, that, on some recent developments that an
additional condition was added. The additional condition was
that the improvements be installed before the time limit or at
such time as adjacent developments install improvements.
David Scherer stated he would prefer that the sidewalk waiver be
tied to the street and not waived in its entirety. He stated the
Traffic Engineering Division of Public Works still maintains that
the minimum 20 foot driveway be provided internal to the project.
He opposes the retention of the narrow drive to serve such a
development. He stated, that, as to the parking and other
maneuvering areas within the site, there was some general
opposition to that request.
The Chairman then asked the applicant to come forward and present
his application. Mr. Kenneth Ring, representing Riverside Box,
came to the lectern and offered a lengthy outline of the history
of their business, the type of business performed there and the
specific request he was placing before the Commission.
He stated this business absolutely does not have additional floor
space and expansion is imperative. He then moved his
r
FILE NO.: Z -47967_A (Cont.
conversation to the area of identifying businesses in the Little
Rock area, especially nearby in the port that utilize his
business facilities. King then offered a brief overview of the
geography of the area identifying streets, vacant lands and
adjacent land users. He also offered some commentary of the
composition of the proposed mini -storage. It being approximately
50150 as far as business and residential uses. As to the
variances, he addressed the street deferral by saying he did not
think that it would make the property very attractive by adding
those improvements at this time.
The Chairman then asked Mr. King if he would respond to what
David Scherer, of Public works, had commented on with respect to
the variances and deferral. The Chairman specifically asked him
to address the point of whether or not he was willing to add a
condition if other adjacent properties improve the street or were
required to, that he would do likewise.
Mr. King responded by saying that it would be acceptable.
Mr. King also added some comments as to the paving requirements
internal to the site. He stated that this is very sandy soil and
that there is no runoff problem at this time. But, he added that
the construction of paving, he felt like, might create a drainage
problem.
The Chairman asked Mr. King to explain some of the graphic
information presented on his site plan. Mr. King gave a brief
overview of the buildings and the development areas. The
conversation between the Chairman and Mr. King then moved to the
subject of how the internal drives maneuvering and parking could
possibly be improved over time. A consensus was reached between
Mr. King and the Chairman. Phase I of the project would be
allowed to construct buildings without improving drives or
parking, but when Phase II and III are brought on-line and those
permits were issued the parking, drives and maneuvering areas
will be brought up to code. Mr. King felt that this was an
acceptable arrangement and agreed a deferral in this manner could
work.
Mr. King also offered at this point that the drive servicing this
project through Phase I could be widened with initial
construction. In clarification of a question by Commissioner
Chachere, Mr. King stated that Phase I includes only the large
building addition to the existing warehouse structure, thereby,
no need to extend the gravel or paved areas for the other later
buildings at this time. Mr. King stated that access to the
building and the new expansion of Phase I will continue to
utilize the current access and drive. when the initial buildings
come for permits, the drives around the other buildings and
parking areas would be improved. Mr. King's engineer, Mr. Sam
Davis, pointed out that he would have to phase this in a way that
the drives and improvements control not the various structures
that were being proposed in that phase.
7
FILE NO,: Z-4795-A (C_ont._)
After this discussion, the Chairman asked David Scherer, of
Public Works, if the discussion here was nearing Public Works'
requirements or recommendations. Mr. Scherer stated emphatically
that the City did not support the retention or construction of
gravel parking lots. He stated that Public Works would have not
trouble accepting the phased deferral of the improvements.
Scherer identified some of the problems attendant to utilizing
gravel parking lots.
There being no further comments offered by members of the
Commission, the Chairman placed the item before the Commission
for a vote as amended by the applicant. The waivers now being
modified as follows:
1. Fourche Dam Pike street improvements to be deferred for a
period of 5 years or until adjacent improvements are
initiated by others. That deferral would also include
sidewalk with the street.
2. The next and last would be a variance that would permit
Phase I to be constructed without the construction of
on-site drives or improvements. But with the initiation of
Phase II, the driveway through the site to serve that parcel
and later phases would be widened to 24 feet. Each
subsequent phase would be improved with paved drives,
parking and maneuvering.
The Chairman then asked for the vote. The vote was produced as
9 ayes, 0 nays and 2 absent. At the point of the completion of
the votes, a member of the audience gained the attention of the
Chairman and asked if she was not permitted to speak on this
matter.
The Chairman said for the moment that the vote would be suspended
until a determination was made about the speaker's position.
There were two persons present, Mr. and Mrs. Jones, adjacent
residents. Mrs. Jones came to the lectern and expressed one
question which was whether or not this was a rezoning of the
property. Several persons including the Chairman and Bobby Sims,
of the Planning Staff, addressed her question by identifying the
type of classification action before the Commission and said it
was a, form of rezoning. The Chairman asked if Mrs. Jones'
question had been adequately answered. She indicated that she
was satisfied.
The Chairman then returned the issue to the Commission to confirm
the vote as previously offered. The vote was 9 ayes, 0 nays and
2 absent. The PCD application is approved with recommendation on
the variances and deferrals to the City Board.
8
FILE z-4? -A nt.
After this discussion, the Chairman asked David Scherer, of
Public Works, if the discussion here was nearing Public Works'
requirements or recommendations. Mr. Scherer stated emphatically
that the City did not support the retention or construction of
gravel parking lots. He stated that Public Works would have not
trouble accepting the phased deferral of the improvements.
Scherer identified some of the problems attendant to utilizing
gravel parking lots.
There being no further comments offered by members of the
Commission, the Chairman placed the item before the Commission
for a vote as amended by the applicant. The waivers now being
modified as follows:
1. Fourche Dam Pike street improvements to be deferred for a
period of 5 years or until adjacent improvements are
initiated by others. That deferral would also include
sidewalk with the street.
2. The next and last would be a variance that would permit
Phase I to be constructed without the construction of
on-site drives or improvements. But with the initiation of
Phase II, the driveway through the site to serve that parcel
and later phases would be widened to 24 feet. Each
subsequent phase would be improved with paved drives,
parking and maneuvering.
The Chairman then asked for the vote. The vote was produced as
9 ayes, 0 nays and 2 absent. At the point of the completion of
the votes, a member of the audience gained the attention of the
Chairman and asked if she was not permitted to speak on this
matter.
The Chairman said for the moment that the vote would be suspended
until a determination was made about the speaker's position.
There were two persons present, Mr. and Mrs. Jones, adjacent
residents. Mrs. Jones came to the lectern and expressed one
question which was whether or not this was a rezoning of the
property. Several persons including the Chairman and Bobby Sims,
of the Planning Staff, addressed her question by identifying the
type of classification action before the Commission and said it
was a, form of rezoning. The Chairman asked if Mrs. Jones'
question had been adequately answered. She indicated that she
was satisfied.
The Chairman then returned the issue to the Commission to confirm
the vote as previously offered. The vote was 9 ayes, 0 nays and
2 absent. The PCD application is approved with recommendation on
the variances and deferrals to the City Board.
8
FILE 2-47 -A
NAME: RIVERSIDE BOX SUPPLY, INC. -- SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the north side of Fourche Dam Pike, at 7008 Fourche
Dam Pike
DEVELOPER:
Kenneth R. Ring
RIVERSIDE BOX SUPPLY CO., INC.
P. O. Box 95004
Little Rock, AR 72295-5004
490-1569
AREA: 9.1 ACRES NTTMBER OF LOT : 1
ENGINEER:
Samuel L. Davis
S. DAVIS CONSULTING, INC.
5301 West 8th. Street
Little Rock, AR 72204
664-0324
FT. NEW STREET: 0
ZONING: R-2 PROPOSED USE Warehouse & Distribution;
Mini -storage facility; and
single-family residential
PLANNING DISTRICT: 25
CENSUS TRACT: 40.03
VARIANCES REQUESTED:
1. Approval of a 5 -year deferral of boundary street
improvements to Fourche Dam Pike.
2. Approval of a waiver of the sidewalk along the Fourche
Dam Pike frontage of the site.
3. Approval of a waiver of the requirement to provide a
paved driveway and maneuvering area to and around the
mini -storage facility.
4. Approval of a variance from the requirement to provide
24 foot wide driveways on the site.
STATEMENT QF PRQPQSAL:
The applicant proposes a mixed-use planned development in order
to: 1) construct an addition to an existing warehousing and
distribution business facility; 2) construct two additional
mini -warehouse buildings; and, 3) continue using a residential
structure located on the property for residential use.
The existing warehouse and distribution building is an 18,000±
building. There is a loading dock and covered loading area in
conjunction with this building. Offices for the business are
located in a detached 950 square foot building. An asphalt
ILE NQ.: Z -4796-A _.
(-C-ant
parking area for 15 vehicles is provided. There is an existing
10 foot wide asphalt drive extending northward from Fourche Dam
Pike to the north edge of the distribution -warehouse building.
This drive provides access to, not only the distribution -
warehouse building, but to the office structure, the existing
mini -storage buildings, and the residence located on the
property.
The existing mini -storage buildings are located north of the
existing distribution -warehouse building. There are two
buildings, one with 3,000 square feet; the second, 6,000 square
feet.
There is a residence on the property, immediately off Fourche Dam
Pike, plus two storage buildings.
The applicant proposes, as a phase I development, to construct a
29,000 square foot addition to the distribution -warehouse
building. This addition is planned to be built along the west
side of the existing building. It is to house, not only
additional warehousing space, but office space for the business.
It is to be a single -story building, with walls at 14 feet high
and the roof peak at 20 feet. Phase I is to be undertaken in
1995.
The phase II development is to involve the first of two
additional mini -storage buildings. This building is planned to
be a 6,000 square foot building containing 40 storage spaces.
The building is proposed to be a single -story building, with 8
foot high walls. Phase II development is proposed to take place
in 1997, or later.
The phase III development involves constructing another addition
to the distribution -warehouse building. The addition is to
provide another 40,000 square feet of warehousing area, and is to
be an extension of the phase I building to the north. This phase
is planned for 2000 or later.
The phase IV development is the construction of the second mini -
storage building. It, too, is a 6,000 square foot building,
containing 40 units, and with 8 foot high walls. This phase is
planned for 2001 or later.
The hours of operation of the business and of the mini -storage
are, currently, 8:00 AM to 5:00 PM, Monday through Friday. The
present hours of operation are not planned to be changed. The
applicant proposes to install fencing and lighting for the
security of the site. The existing 10 foot wide asphalt driveway
is proposed to remain "as -is". No extension of the driveway is
proposed or is, according to the applicant, needed. The
applicant explains that, due to the very flat topography of the
site, paving around the mini -storage buildings would cause
flooding of these units; therefore, the applicant seeks a waiver
of the requirement that the access to and maneuvering space
2
FILE Z-47 -A (Cont.)
around the mini -storage units be paved. These drives are
currently gravel, and, according to the applicant, provide
acceptable access to the mini -storage facility. The applicant
explains that there are seven employees, and that the 15 parking
spaces is sufficient. The 10 foot wide drive, the applicant
states, serves the needs of the site without any problems. A
variance from the requirement that a 24 foot drive be provided is
sought. Fourche Dam Pike is built to county road standards, and
there is no other development in the area which would cause the
roadway to be widened. The applicant, then, seeks a five-year
deferral of the requirement that Fourche Dam Pike be widened to
Master Street Plan standards. The applicant is, however,
amenable to dedicating the required right-of-way for Fourche Dam
Pike. The area is in a rural setting. There are no other
sidewalks along Fourche Dam Pike, states the applicant. A wavier
of the requirement to construct a sidewalk along the Fourche Dam
Pike frontage of the site, then, is requested.
A. PROPOSAL1_REOIIEST:
Review by the Planning Commission and approval by the Board
of Directors is requested for a Planned Commercial
Development for a mixed use development involving a
distribution and warehousing use, a mini -storage use, and a
residential use.
A five-year deferral is requested for having to provide
boundary street improvements to Fourche Dam Pike; a wavier
is requested from the requirement that a sidewalk be
constructed along the Fourche Dam Pike frontage of the
property; a waiver is sought from the requirement that a
paved driveway and maneuvering space be provided to and
around the mini -storage buildings; and, a variance is
requested from the requirement that the on-site drives be 20
feet, and permit the existing 10 foot wide drive to remain
"as -is".
B. EXISTING ONDITIONS:
The site is currently occupied by the applicant. It
contains the existing 18,000 square foot warehouse and a
covered dock area, a 950 square foot office structure, two
mini -storage buildings, a residence, and two out -buildings.
The site, reports the applicant, was purchased, with the
current warehouse and mini -storage buildings being built, in
1980-82, when the area was outside the City Limits. The
City, the applicant reports, annexed the area in 1983, from
which time there has been no additional construction
undertaken.
The site is currently zoned R-2, with the R-2 zoning
district extending to all properties surrounding the site.
3
FILE Z-47 -A n'
C.
LM
ENGINEERIN(33IUTILITY COMMENTS:
The Public Works staff notes the following:
1) The property is located in Zone X, per FIRM 050181
0014E, dated 11/3/93. A grading and NPDES Permit
Notice of Intent must be submitted prior to beginning
work on the site.
2) All drives should asphalt and be a minimum of 24, in
width to provide adequate access for emergency
vehicles. A cul-de-sac or suitable alternative must be
provided at the end of the drive to allow vehicles to
turn around. The apron at the public street should
have minimum turn -out radii per City standards.
3) Right-of-way to meet City standards must be dedicated.
Fourche Dam Pike is a collector street, which requires
60' of right-of-way (wider if open ditches are provided
along the roadway). The minimum width of pavement is
361, and a sidewalk is required along the Fourche Dam
Pike frontage of the site. Construct 1/2 of the
required boundary street section.
4) A stormwater detention analysis is required.
Water Works comments that on-site fire protection will be
required.
Wastewater Utility comments that a sewer main extension,
with easements, will be required.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. approved the submittal
without comment.
The Fire Department commented that a 20' asphalt driveway
will be required to be added. On-site fire hydrants may be
required.
ISSUESILEGALITECHNICAL/DE_STGN:
Sec. 31-201.h of the Code states: "Whenever a (development)
abuts a partially dedicated or constructed public street,
the developer shall provide the minimum of one-half of the
required improvements and right-of-way." The applicant is
seeking a 5 -year deferral from the requirement that Fourche
Dam Pike be constructed to Master Street Plan standards, and
a waiver of the requirement to construct the sidewalk.
These two requests, the deferral and wavier of boundary
street and sidewalk requirements must be approved by the
Board of Directors. The variance involving pavement width
4
FTLE Z-47 -A(Cont)
and the waiver of the requirement to proved a paved driveway
and maneuvering space are staff -level matters.
The Neighborhoods and Planning Site Plan Review Specialist
comments that a 6' high opaque screen, either a wooden fence
with the face directed outward or dense evergreen planting,
is required along the north, east, and west property lines.
Additional screening may not be required west of the
proposed main building, provided the building has no windows
or doors on its west side. Trees with an average spacing of
40' and shrubs at 10' are required within the land use
buffers along the north, east, and west property lines.
Compliance with the Landscape Ordinance will be required.
The Planning staff reports that the planned development is
in the Port District. The adopted Land Use Plan recommends
single-family use of the site. The existing use is in
conflict with the plan.
E. ANALYSIS:
Although the existing use is in conflict with the adopted
Land Use Plan, it is an existing use. The applicant
maintains that the proposed building additions and
structures are being requested in order to continue the
present non -conforming use; no change in use, or addition of
other uses is proposed. Staff can support the applicant's
request on that basis.
Because the area of the applicant's property along Fourche
Dam Pike is in an area that is not developing at this time,
staff can support the deferral of the improvements to
Fourche Dam Pike and the waiver of the sidewalk requirement.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development and of
the boundary street deferral and sidewalk waiver.
SUBDIVISION COMMITTEE COMMENT: (JUNE 8, 1995)
Mr. Kenneth Ring, the applicant, was present. The Planning staff
outlined the request and reviewed with Mr. King the comments
contained in the discussion outline. The Public Works staff
explained the Public Works comments; specifically, the comments
concerning the Master Street Plan requirements. The Planning
staff commented that the site plan needed to have more detail
provided concerning landscaping, buffer fencing, and access
drives to the existing and new mini -storage buildings. Mr. King
responded that he would get with his design professional, and
that they would meet with staff in the following days. The
Committee forwarded the item to the full Commission for the
public hearing.
5
FILE NO.: Z -4796-A (Cont.)
PLANNING COMMISSION ACTION: (JUNE 27, 1995)
The Chairman asked Bobby Sims, of the Planning Staff, to present
the item and staff recommendation. Sims outlined the
application, the various variances and waivers that have been
requested
1. A deferral of the street improvements on the boundary
street, Fourche Dam Pike, for a period of 5 years
2. Approval of a waiver of sidewalk along Fourche Dam Pike
3. Approval of a waiver of parking and driveway maneuvering
space internal to the development to be retained as it
currently exists.
4. A waiver of the driveway width providing circulation from
the street to the various elements of the project. Normal
requirement is 20 to 24 feet. Applicant desires to retain
the approximate 10 foot driveway as it now exists.
Staff recommendation is approval of the project with a specific
position on the waivers. The recommendation concerning the
physical improvements and waivers to be offered by Public Works.
The Chairman then asked that David Scherer, of Public Works, come
forward and address this issue.
Scherer announced that Public Works did not have a problem with
the deferral of the improvements on the street, Fourche Dam Pike.
He pointed out they normally prefer less than 5 years, normally
2 or 3 years is what is offered by the Commission. He added an
additional comment, that, on some recent developments that an
additional condition was added. The additional condition was
that the improvements be installed before the time limit or at
such time as adjacent developments install improvements.
David Scherer stated he would prefer that the sidewalk waiver be
tied to the street and not waived in its entirety. He stated the
Traffic Engineering Division of Public Works still maintains that
the minimum 20 foot driveway be provided internal to the project.
He opposes the retention of the narrow drive to serve such a
development. He stated, that, as to the parking and other
maneuvering areas within the site, there was some general
opposition to that request.
The Chairman then asked the applicant to come forward and present
his application. Mr. Kenneth Ring, representing Riverside Box,
came to the lectern and offered a lengthy outline of the history
of their business, the type of business performed there and the
specific request he was placing before the Commission.
He stated this business absolutely does not have additional floor
space and expansion is imperative. He then moved his
6
FILE NO.: z -4796-A (Co
conversation to the area of identifying businesses in the Little
Rock area, especially nearby in the port that utilize his
business facilities. Ring then offered a brief overview of the
geography of the area identifying streets, vacant lands and
adjacent land users. He also offered some commentary of the
composition of the proposed mini -storage. It being approximately
50/50 as far as business and residential uses. As to the
variances, he addressed the street deferral by saying he did not
think that it would make the property very attractive by adding
those improvements at this time.
The Chairman then asked Mr. Ring if he would respond to what
David Scherer, of Public Works, had commented on with respect to
the variances and deferral. The Chairman specifically asked him
to address the point of whether or not he was willing to add a
condition if other adjacent properties improve the street or were
required to, that he would do likewise.
Mr. Ring responded by saying that it would be acceptable.
Mr. Ring also added some comments as to the paving requirements
internal to the site. He stated that this is very sandy soil and
that there is no runoff problem at this time. But, he added that
the construction of paving, he felt like, might create a drainage
problem.
The Chairman asked Mr. Ring to explain some of the graphic
information presented on his site plan. Mr. Ring gave a brief
overview of the buildings and the development areas. The
conversation between the Chairman and Mr. Ring then moved to the
subject of how the internal drives maneuvering and parking could
possibly be improved over time. A consensus was reached between
Mr. Ring and the Chairman. Phase I of the project would be
allowed to construct buildings without improving drives or
parking, but when Phase II and III are brought on-line and those
permits were issued the parking, drives and maneuvering areas
will be brought up to code. Mr. Ring felt that this was an
acceptable arrangement and agreed a deferral in this manner could
work.
Mr. Ring also offered at this point that the drive servicing this
project through Phase I could be widened with initial
construction. In clarification of a question by Commissioner
Chachere, Mr. Ring stated that Phase I includes only the large
building addition to the existing warehouse structure, thereby,
no need to extend the gravel or paved areas for the other later
buildings at this time. Mr. Ring stated that access to the
building and the new expansion of Phase I will continue to
utilize the current access and drive. When the initial buildings
come for permits, the drives around the other buildings and
parking areas would be improved. Mr. King's engineer, Mr. Sam
Davis, pointed out that he would have to phase this in a way that
the drives and improvements control not the various structures
that were being proposed in that phase.
7
FILE N Z-47 -A n •.
After this discussion, the Chairman asked David Scherer, of
Public Works, if the discussion here was nearing Public Works'
requirements or recommendations. Mr. Scherer stated emphatically
that the City did not support the retention or construction of
gravel parking lots. He stated that Public Works would have not
trouble accepting the phased deferral of the improvements.
Scherer identified some of the problems attendant to utilizing
gravel parking lots.
There being no further comments offered by members of the
Commission, the Chairman placed the item before the Commission
for a vote as amended by the applicant. The waivers now being
modified as follows:
1. Fourche Dam Pike street improvements to be deferred for a
period of 5 years or until adjacent improvements are
initiated by others. That deferral would also include
sidewalk with the street.
2. The next and last would be a variance that would permit
Phase I to be constructed without the construction of
on-site drives or improvements. But with the initiation of
Phase II, the driveway through the site to serve that parcel
and later phases would be widened to 24 feet. Each
subsequent phase would be improved with paved drives,
parking and maneuvering.
The Chairman then asked for the vote. The vote was produced as
9 ayes, 0 nays and 2 absent. At the point of the completion of
the votes, a member of the audience gained the attention of the
Chairman and asked if she was not permitted to speak on this
matter.
The Chairman said for the moment that the vote would be suspended
until a determination was made about the speaker's position.
There were two persons present, Mr. and Mrs. Jones, adjacent
residents. Mrs. Jones came to the lectern and expressed one
question which was whether or not this was a rezoning of the
property. Several persons including the Chairman and Bobby Sims,
of the Planning Staff, addressed her question by identifying the
type of classification action before the Commission and said it
was a, form of rezoning. The Chairman asked if Mrs. Jones'
question had been adequately answered. She indicated that she
was satisfied.
The Chairman then returned the issue to the Commission to confirm
the vote as previously offered. The vote was 9 ayes, 0 nays and
2 absent. The PCD application is approved with recommendation on
the variances and deferrals to the City Board.
8
June 27, 1995
IT�Q. ; _3 _ FILE NO, _ Z-47 2& -A
NAME: RIVERSIDE BOX SUPPLY, INC. SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the north side of Fourche Dam Pike, at 7008 Fourche
Dam Pike
DEVELOPER:
ENGINEER:
Kenneth R. King Samuel L. Davis
RIVERSIDE BOX SUPPLY CO., INC. S. DAVIS CONSULTING, INC.
P. O. Box 95004 5301 West 8th. Street
Little Rock, AR 72295-5004 Little Rock, AR 72204
490-1569 664-0324
AREA: 9.1 ACRES NUMEER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2 PROPOSED USES: Warehouse & Distribution;
Mini -storage facility; and
single-family residential
PLANNING DISTRICT: 25
CEN$U$_TRACT: 40.03
VARIANCES REQUESTED:
1. Approval of a 5 -year deferral of boundary street
improvements to Fourche Dam Pike.
2. Approval of a waiver of the sidewalk along the Fourche
Dam Pike frontage of the site.
3. Approval of a waiver of the requirement to provide a
paved driveway and maneuvering area to and around the
mini -storage facility.
4. Approval of a variance from the requirement to provide
24 foot wide driveways on the site.
STATEMENT OF PROPOSAL:
The applicant proposes a mixed-use planned development in order
to: 1) construct an addition to an existing warehousing and
distribution business facility; 2) construct two additional
mini -warehouse buildings; and, 3) continue using a residential
structure located on the property for residential use.
June 27, 1995
HDIVI
ITEM NQ • 3 Cont.) FILE NO,: Z -4796 -
The existing warehouse and distribution building is an 18,000±
building. There is a loading dock -and covered loading area in
conjunction with this building. Offices for the business are
located in a detached 950 square foot building. An asphalt
parking area for 15 vehicles is provided. There is an existing
10 foot wide asphalt drive extending northward from Fourche Dam
Pike to the north edge of the distribution -warehouse building.
This drive provides access to, not only the distribution -
warehouse building, but to the office structure, the existing
mini -storage buildings, and the residence located on the
property.
The existing mini -storage buildings are located north of the
existing distribution -warehouse building. There are two
buildings, one with 3,000 square feet; the second, 6,000 square
feet.
There is a residence on the property, immediately off Fourche Dam
Pike, plus two storage buildings.
The applicant proposes, as a phase I development, to construct a
29,000 square foot addition to the distribution -warehouse
building. This addition is planned to be built along the west
side of the existing building. It is to house, not only
additional warehousing space, but office space for the business.
It is to be a single -story building, with walls at 14 feet high
and the roof peak at 20 feet. Phase I is to be undertaken in
1995.
The phase II development is to involve the first of two
additional mini -storage buildings. This building is planned to
be a 6,000 square foot building containing 40 storage spaces.
The builO.ing is proposed to be a single -story building, with 8
foot high walls. Phase II development is proposed to take place
in 1997, or later.
The phase III development involves constructing another addition
to the distribution -warehouse building. The addition is to
provide another 40,000 square feet of warehousing area, and is to
be an extension of the phase I building to the north. This phase
is planned for 2000 or later.
The phase IV development is the
storage building. It, too, is
containing 40 units, and with 8
planned for 2001 or later.
construction of the second mini -
6,000 square foot building,
foot high walls. This phase is
The hours of operation of the business and of the mini -storage
are, currently, 8:00 AM to 5:00 PM, Monday through Friday. The
present hours of operation are not planned to be changed. The
applicant proposes to install fencing and lighting for the
security of the site. The existing 10 foot wide asphalt driveway
2
June 27, 1995
SUBDIVISION
ITEM NO.: 3 (Cont. ) __FIL_E_ NQ_; Z_-47.96.
-A
is proposed to remain "as -is". No extension of the driveway is
propos@d or is, according to the ap$licant, needed. The
applicant explains that, due to the very flat topography of the
site, paving around the mini -storage buildings would cause
flooding of these units; therefore, the applicant seeks a waiver
of the requirement that the access to 4nd maneuvering space
around the mini -storage units be paved. These drives are
currently gravel, and, according to the applicant, provide
acceptable access to the mini -storage facility. The applicant
explains that there are seven employees, and that the 15 parking
spaces is sufficient. The 10 foot wide drive, the applicant
states, serves the needs of the site without any problems. A
variance from the requirement that a 24 foot drive be provided is
sought. Fourche Dam Pike is built to county road standards, and
there is no other development in the area which would cause the
roadway to be widened. The applicant, then, seeks a five-year
deferral of the requirement that Fourche Dam Pike be widened to
Master Street Plan standards. The applicant is, however,
amenable to dedicating the required right-of-way for Fourche Dam
Pike. The area is in a rural setting. There are no other
sidewalks along Fourche Dam Pike, states the applicant. A wavier
of the requirement to construct a sidewalk along the Fourche Dam
Pike frontage of the site, then, is requested.
A. PROPOSALLREODES_T:
Review by the Planning Commission and approval by the Board
of Directors is requested for a Planned Commercial
Development for a mixed use development involving a
distribution and warehousing use, a mini -storage use, and a
residential use.
A five-year deferral is requested for having to provide
boundary street improvements to Fourche Dam Pike; a wavier
is requested from the requirement that a sidewalk be
constructed along the Fourche Dam Pike frontage of the
property; a waiver is sought from the requirement that a
paved driveway and maneuvering space be provided to and
around the mini -storage buildings; and, a variance is
requested from the requirement that the on-site drives be 20
feet, and permit the existing 10 foot wide drive to remain
"as -is".
B. EXISTING, _COUD-ITI.ONS :
The site is currently occupied by the applicant. It
contains the existing 18,000 square foot warehouse and a
covered dock area, a 950 square foot office structure, two
mini -storage buildings, a residence, and two out -buildings.
The site, reports the applicant, was purchased, with the
current warehouse and mini -storage buildings being built, in
1980-82, when the area was outside the City Limits. The
3
June 27, 1995
S 11VI I
ITEM 3 Cant.) FILE NQ.--,- Z-4796-
City, the applicant reports, annexed the area in 1983, from
which time there has been no additional construction
undertaken.
The site is currently zoned R-2, with the R-2 zoning
district extending to all properties surrounding the site.
C. ENGINEERING/UTILITY COMMENTS:
The Public Works staff notes the following:
1) The property is located in Zone X, per FIRM 050181
0014E, dated 11/3/93. A grading and NPDES Permit
Notice of Intent must be submitted prior to beginning
work on the site.
2) All drives should asphalt and be a minimum of 24' in
width to provide adequate access for emergency
vehicles. A cul-de-sac or suitable alternative must be
provided at the end of the drive to allow vehicles to
turn around. The apron at the public street should
have minimum turn -out radii per City standards.
3) Right-of-way to meet City standards must be dedicated.
Fourche Dam Pike is a collector street, which requires
60' of right-of-way (wider if open ditches are provided
along the roadway). The minimum width of pavement is
361, and a sidewalk is required along the Fourche Dam
Pike frontage of the site. Construct 1/2 of the
required boundary street section.
4) A stormwater detention analysis is required.
Water Works comments that on-site fire protection will be
required.
Wastewater Utility comments that a sewer main extension,
with easements, will be required.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Hell Telephone Co. approved the submittal
without comment.
The Fire Department commented that a 20' asphalt driveway
will be required to be added. On-site fire hydrants may be
required.
4
ane 27, 1995
SUBDIVISION
ITEM NO.: 3 (Cont ) FILE N(].: Z -4796-A
D. I E LE AL TE HNI AL DE IG
Sec. 31-201.h of the Code states: "Whenever a (development)
abuts a partially dedicated or constructed public street,
the developer shall provide the minimum of one-half of the
required improvements and right-of-way." The applicant is
seeking a 5 -year deferral from the requirement that Fourche
Dam Pike be constructed to Master Street Plan standards, and
a waiver of the requirement to construct the sidewalk.
These two requests, the deferral and wavier of boundary
street and sidewalk requirements must be approved by the
Board of Directors. The variance involving pavement width
and the waiver of the requirement to proved a paved driveway
and maneuvering space are staff -level matters.
The Neighborhoods and Planning Site Plan Review Specialist
comments that a 6' high opaque screen, either a wooden fence
with the face directed outward or dense evergreen planting,
is required along the north, east, and west property lines.
Additional screening may not be required west of the
proposed main building, provided the building has no windows
or doors on its west side. Trees with an average spacing of
40' and shrubs at 10' are required within the land use
buffers along the north, east, and west property lines.
Compliance with the Landscape ordinance will be required.
The Planning staff reports that the planned development is
in the Port District. The adopted Land Use Plan recommends
single-family use of the site. The existing use is in
conflict with the plan.
E. ANALYSIS•
Although the existing use is in conflict with the adopted
Land Use Plan, it is an existing use. The applicant
maintains that the proposed building additions and
structures are being requested in order to continue the
present non -conforming use; no change in use, or addition of
other uses is proposed. Staff can support the applicant's
request on that basis.
Because the area of the applicant's property along Fourche
Dam Pike is in an area that is not developing at this time,
staff can support the deferral of the improvements to
Fourche Dam Pike and the waiver of the sidewalk requirement.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development and of
the boundary street deferral and sidewalk waiver.
5
June 27, 1995
.
SUBDIVISION
ITEM NO.; 3(Cont, ) FILE NO.: Z -4796-A
,gBDIVI ION COMMITTEE COMMENT: (June 8, 1995)
Mr. Kenneth King, the applicant, was present. The Planning staff
outlined the request and reviewed with Mr. King the comments
contained in the discussion outline. The Public Works staff
explained the Public Works comments; specifically, the comments
concerning the Master Street Plan requirements. The Planning
staff commented that the site plan needed to have more detail
provided concerning landscaping, buffer fencing, and access
drives to the existing and new mini -storage buildings. Mr. King
responded that he would get with his design professional, and
that they would meet with staff in the following days. The
Committee forwarded the item to the full Commission for the
hearing.
6