HomeMy WebLinkAboutZ-4765-C Staff AnalysisMay 11, 2006
ITEM NO.: D
FILE NO.: Z -4765-C
NAME: Lots 7R, 9 and 10 West Highlands Zoning Site Plan Review
LOCATION: Located on Autumn Road, North of Chenal Parkway
DEVELOPER:
Colliers Dickson Flake Partners, Inc.
P.O. Box 3456
Little Rock, AR 72203
ENGINEER:
Cromwell Architects Engineers
101 S. Spring Street
Little Rock, AR 72201
AREA: 8+ acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
0-2, Office and Institutional District, with conditions
11-1-430
24.04
VARIANCESNVAIVERS REQUESTED: None requested.
On March 7, 2006, the applicant requested this item be deferred to the May 11, 2006,
Public Hearing. Staff is supportive of this request.
PLANNING COMMISSION ACTION:
(MARCH 30, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item indicating the applicant had submitted a
request dated March 7, 2006, requesting a deferral of the item to the May 11, 2006,
public hearing. Staff stated they were supportive of the deferral request.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for Deferral. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
May 11, 2006
SUBDIVISION
ITEM NO.: D Cont. FILE NO.: Z -4765-C
STAFF UPDATE:
The applicant submitted a request dated April 21, 2006, requesting this item be
withdrawn from consideration without prejudice. Staff is supportive of the withdrawal
request.
PLANNING COMMISSION ACTION: (MAY 11, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item indicating the applicant had submitted a
request dated April 21, 2006, requesting the item be withdrawn from consideration
without prejudice. Staff stated they were supportive of the withdrawal request.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for withdrawal. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
K
ITEM NO.: 11
NAME: Lots 7R, 9 and 10 West Highlands Zoning Site Plan Review
LOCATION: located on Autumn Road, North of Chenal Parkway
Planning Staff Comments -
1 .
omments:
Z -4765-C
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than March 15, 2006. The Office of
Planning and Development must receive the proof of notice no later than March 24,
2006.
2. The previous approval indicated the placement of evergreen trees along the western
perimeter of the site. Does the current proposal include the placement of the trees
in this area as well? If so indicate the location on the proposed site plan and a note
concerning the tree type and planting spacing.
3. The site plan indicates the construction of the buildings in phases. Provide an
anticipated time frame for beginning of each of the phases.
4. Indicate the total number of parking spaces proposed for the development and the
total number of parking spaces proposed for Phase I of the development. Provide
the total number of doctors to staff the facility and the total number of doctors for the
Phase I portion of the development.
5. Provide the days and hours of operation of the facility.
Variance/Waivers: None requested.
Public Works Conditions:
1. Autumn Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
2. A request should be made to abandon existing 30 feet right-of-way located on east
property line with a utility and drainage easement to remain.
3. With the site development, provide the design of the street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -foot
sidewalks with the planned development.
4. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1817 (Derrick Bergfield).
5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
6. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan if different from previous
Item # 11
application
7. A Sketch Grading and Drainage Plan will be required per Section 29-186 (e) if
grading and drainage plan has changed since last application.
8. Hauling of fill material on or off site over municipal streets and roads requires
approval prior to a grading permit being issued. Contact Public Works Traffic
Engineering at 621 S. Broadway, (501) 379-1817 (Derrick Bergfield) for more
information.
9. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy:
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A looped water main extension may be
required in order to provide adequate service to this property. Some or all of the
facilities on-site may be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's material and construction
specifications and installation will be inspected by an engineer, licensed to practice in
the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Please submit four copies of the plans for the fire protection system to Central Arkansas
Water for review. Contact Central Arkansas Water regarding procedures for installation
of fire service. Approval of plans by the Arkansas Department of Health Engineering
Division and Little Rock Fire Department is required. Fire sprinkler systems which do
not contain additives such as antifreeze shall be isolated with a double detector check
valve assembly. If additives are used, a reduced pressure zone backflow preventer shall
be required. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: No comment.
Landscape:
Item # 11
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, March 15, 2006.
Item # 11
ITEM NO.: 11
NAME: Lots 7R, 9 and 10 West Highlands Zoning Site Plan Review
LOCATION: located on Autumn Road, North of Chenal Parkway
Planning Staff Comments:
Z -4765-C
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than March 15, 2006. The Office of
Planning and Development must receive the proof of notice no later than March 24,
2006.
2. The previous approval indicated the placement of evergreen trees along the western
perimeter of the site. Does the current proposal include the placement of the trees
in this area as well? If so indicate the location on the proposed site plan and a note
concerning the tree type and planting spacing.
3. The site plan indicates the construction of the buildings in phases. Provide an
anticipated time frame for beginning of each of the phases.
4. Indicate the total number of parking spaces proposed for the development and the
total number of parking spaces proposed for Phase I of the development. Provide
the total number of doctors to staff the facility and the total number of doctors for the
Phase I portion of the development.
5. Provide the days and hours of operation of the facility.
Variance/Waivers: None requested.
Public Works Conditions:
1. Autumn Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
2. A request should be made to abandon existing 30 feet right-of-way located on east
property line with a utility and drainage easement to remain.
3. With the site development, provide the design of the street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -foot
sidewalks with the planned development.
4_ Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1817 (Derrick Bergfield).
5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
6. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan if different from previous
Item # 11
application
7. A Sketch Grading and Drainage Plan will be required per Section 29-186 (e) if
grading and drainage plan has changed since last application.
8. Hauling of fill material on or off site over municipal streets and roads requires
approval prior to a grading permit being issued. Contact Public Works Traffic
Engineering at 621 S. Broadway, (501) 379-1817 (Derrick Bergfield) for more
information.
9. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A looped water main extension may be
required in order to provide adequate service to this property. Some or all of the
facilities on-site may be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's material and construction
specifications and installation will be inspected by an engineer, licensed to practice in
the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Please submit four copies of the plans for the fire protection system to Central Arkansas
Water for review. Contact Central Arkansas Water regarding procedures for installation
of fire service. Approval of plans by the Arkansas Department of Health Engineering
Division and Little Rock Fire Department is required. Fire sprinkler systems which do
not contain additives such as antifreeze shall be isolated with a double detector check
valve assembly. If additives are used, a reduced pressure zone backflow preventer shall
be required. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATH: The site is not located on a dedicated CATA Bus Route.
Plan nin Division: No comment.
Landscape:
Item # I I
0
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, March 15, 2006.
Item # 11
Additional Landscaping Comments:
11. West Highlands Z -4765-C
No comment. Approved as submitted.