HomeMy WebLinkAboutZ-4756-A Map 7--1�Xi'.�s1NGr
T 2Zv�r�
i
i'IMIR"F.l'� /f-'iJf,ca LEGEND
- G 2" GAS LINE
SS 8" SANITARY SEWER LINE
3 SANITARY SEWER MANHOLE
P. P. ELECTRICAL POWER POLE
f J
7m,Ry'' r
{1'.4 \� , 0.E--- OVERHEAD ELECTRICAL LINES
I
W 8" WATER LINE
WATER METER
l
FIRE HYDRANT
F
'� ) ■ TELEPHONE PEDESTAL
i EXISTING CONSTRUCTION
\ (BUILDINGS / PARKING LOT / STREETS)
PHASE 1 DEVELOPMENT
PROPOSED CONSTRUCTION
�G1�!t�LLLGLd PHASE 2 DEVELOPMENT
FUTURE CONSTRUCTION
I U_ PHASE 3 DEVELOPMENT
LO I I . Ex(STII.LGe /4S("ftAcl.'�"
e- I P1N4 KEYED NOTES
1 EXISTING CONCRETE PAVED PARKING LOT
e % 2 CONCRETE DRIVEWAYS AND APRONS
Exi5r1'INGt A6at'IHOL 1s.T
3O LANDSCAPE AREAS (PHASE 3 WORK SHOWN DOTTED)
•� 4O CONCRETE SIDEWALK (PHASE 2 WORK SHOWN TEXTURED)
t
`UNL�LGr��GtN%71..�
/'` �, . z '�+r•�, � 'p' �LP.G'it�iG�L. I w.�,,,� ,
/ ' �jCi�fltJh $L '"' � "T�.�Lr✓.��+�lE S �fIG�
f \p
( g„; Aoo.v� NOTE: THIS SITE PLAN HAS BEEN PREPARED FROM INFORMATION
j OBTAINED FROM THE FOLLOWING SOURCES
iso
8
4 -
Fes— I24
NATIONAL DRINrFASf N0, WA 24x%e.,:
0
L-An4r; - `Ap
PUMP t-tnu5� �o t3�, i
Illy
Na.SN � A saw -n+ P I I
�' -INIn I.lJ1" all /(nit -1, GCLiPE�, I
Spur! } SI P Oso1�sT
00
i
I
i
�I(LE "'w A-0
►�R T
is r-.Aw, �
z��c,4Tlaau13
�Ii
1. A PHYSICAL SITE SURVEY OF EXISTING CONDITIONS CONDUCTED BY
ALDERFER & ASSOCIATES VERIFYING SIZE AND RELATIONSHIPS OF
EXISTING BUILDINGS, PARKING LOTS & SPACES, AND ENTRANCE
DRIVEWAYS. EXISTING UTILITIES SERVING THE BUILDING AND
ADJACENT -TO THE PROPERTY WHERE ALSO VERIFIED.
2.. SITE PLAN -1 ST PHASE DATED 10.9.86 AND REVISED 3.3.87 AS DRAWN
BY T. FRANCE FOR INFORMATION REGARDING SITE UTILITIES, PHASE 1
DEVELOPMENT AND HISTORICAL DATA RELATED TO THE CONDITIONAL
USE PERMIT APPROVED ON 11.11.86 (ZONING FILE NO. Z4756).
3. LEGAL SURVEY DATED MAY 15, 1985 AS PREPARED BY BROOKS &
CURRY, INC. FOR INFORMATION REGARDING PROPERTY BOUNDARY
LOCATIONS AND DIMENSIONS, NASH CREEK CENTER LINE AND
FLOODWAY PARAMETERS AND SANITARY SEWER EASEMENT LOCATION.
EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE
INFORMATION AS PRESENTED HERE. ANY DISCREPANCIES FOUND SHOULD
BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AS SOON AS POSSIBLE.
PARKING ANALYSIS
PHASE 1 (EXISTING FACILITY):
MAIN SANCTUARY SEATS 275
SEC. 36-417 REQUIRES 1 PARKING SPACE PER 3 SEATS
REQUIRED PARKING: 275 / 3 91 PARKING SPACES
PROVIDED PARKING: 91 PARKING SPACES
INCLUDES 4 HANDICAPPED SPACES
PHASE 2:
PROPOSED ADDITION OF SUNDAY SCHOOL FACILITIES. NO INCREASE IN
SEATING CAPACITY OF MAIN AUDITORIUM, THEREFORE, NO ADDITIONAL
PARKING REQUIRED.
PHASE 3:
FUTURE AUDITIORIUM WITH 850 SEATING CAPACITY REQUIRES 283
PARKING SPACES. SITE PLAN PROVIDES 284 PARKING SPACES.
�. A
— s �
}' RECISTEREC E
ARCHITECT
r
t�W�lEa�le1Y NoTE� y
_Gpt-�I�IiIoNL (.15>v. f"F.-�N��T"f�rp
Ohl ND�l , I , 1�1 Cb Co C fr- L ZQI�i IreiGr F ►t.1r I�Jp. �z 4 7td�.
I=
DRAWN
��
CHECKED
MJ A”
JD/ATTE4y
1b 1
SCALE
40'
Joe No.
CWNP
NP
SHEET
OF SHEETS
iii
U
c
,JcaN�
cu
O
tf
ch
�
U
0
aor�
M
N
N
�C0
06T--
O
C
r)
cn
cn
t6
x
Q
00
X
(.0
O
X
u -
co
M1�Q1N
y)�
O
til
a
-
WJ
I=
DRAWN
��
CHECKED
MJ A”
JD/ATTE4y
1b 1
SCALE
40'
Joe No.
CWNP
NP
SHEET
OF SHEETS
iii
U
c
cu
�
U
0
0U
U.
0
O
MJ
-
WJ
c
,a
U.
J
LL
0
N
Ii
z
W
o
>
O
00
I=
DRAWN
��
CHECKED
MJ A”
JD/ATTE4y
1b 1
SCALE
40'
Joe No.
CWNP
NP
SHEET
OF SHEETS