HomeMy WebLinkAboutZ-4738 Staff AnalysisNovember 11, 1986
SUBDIVISIONS
Item No. E
NAME:
Central Church of the Nazarene
Conditional Use Permit
(Z-4738)
LOCATION: The south side of Baseline Road
just east of Loetscher Lane
(5121 Baseline Road)
OWNER/APPLICANT: Central Church of the Nazarene/
Dallas Hudspeth
PROPOSAL: To construct six buildings (temporary/portable? -
3,372 square feet) for use as a christian school (K-12th/150
capacity) within an existing church facility (250 capacity)
on land that is zoned "R-2."
1. Site Location
Adjacent to an arterial street (Baseline Road).
2. Compatibility with Neighborhood
The church is an existing use. It is surrounded by
single family uses on three sides with an office use
located to the north. The existing facility is
compatible with the surrounding area.
3. On -Site Drives and Parki
The property contains an ingress and two egresses to
Baseline Road. The property also contains 60 paved
parking spaces.
4. Screening and Buffers
No landscape plan has been submitted.
November 11, 1986
SUBDIVISIONS
Item No. E - Continued
5. Analysis
The staff feels that a church use on this property is
compatible with the surrounding area. The staff does,
however, have serious reservations about the proposal.
The staff cannot support the location of the six
Proposed classrooms. The lack of setback (eight feet
side yard and 25 feet rear yard as required in "R-2")
and the proximity of the other building creates a
Potential safety problem. The applicant needs to
investigate the possibility of relocating the
classrooms on the west side of the property and
Providing the appropriate screening and landscaping on
the south property line.
6. City Engineering Comments
(1) There are a series of landscape and layout
problems as shown.
(2) Right-of-way dedication of 45 feet from the
centerline of Baseline Road is required.
(3) Stormwater detention is required - show
preliminary volume calculation.
(4) Redesign the driveway as shown by the Traffic
Engineer.
(5) Only one driveway is allowed - this can be
accomplished by redesign.
(6) Forty-five degree parking is required on the east
side of the property in order to back a car out
properly - wheel stops are required on the new
parking area between the family life center and
the church.
6. Staff Recommendtion
Approval, provided the applicant agrees to: (1) submit
a revised site plan that includes relocation of the six
proposed classrooms, the appropriate screening and
landscaping, and the City Engineering concerns; and (2)
comply with City Engineering comments numbered 1
through 6 as listed above.
November 11, 1986
SUBDIVISIONS
Item No. E - Continued
SUBDIVISION COMMITTEE REVIEW:
The applicant was not present. The issue was not discussed.
Additional comments are: (1) The Fire Department states
that the proposed structures cannot be occupied as is; and
(2) the Water works states that on-site fire service is
recommended.
PLANNING COMMISSION ACTION: (10-14-86)
The applicant was present. There were no objectors. The
staff" reiterated its recommendation of approval provided the
applicant agreed to meet staff recommendations. The
Commission noted that the applicant had not attended the
Subdivision Committee meeting and that no revised proposal
had been submitted. The Commission instructed the applicant
to contact the Fire Department immediately because of the
expressed safety concerns. The applicant agreed to comply.
The Commission then voted 6 ayes, 0 noes and 5 absent to
defer the application until the November 11, 1986, Planning
Commission meeting.
SUBDIVISION COMMITTEE REVIEW:
The applicant was present and submitted a revised site plan
that reversed the location of the temporary buildings from
the southeast corner to the southwest corner of the
property. The applicant stated that the new proposal was
approved by the Fire Department and the City Traffic
Engineer. The staff stated that the proposed 3' side yard
and 5' rear yard were inadequate in that "R-2" zoning
requires an 8' side yard and a 25' rear yard. There was
some discussion about the temporary nature of the buildings.
The applicant stated that they would only need the buildings
for three years. The Committee stated that the applicant
should try to relocate the proposed temporary structures to
allow for a more side yard and rear yard setback, and that
if the applicant agreed to al -year time limit, the
Commission would consider the mitigating circumstances. The
applicant agreed to comply.
November 11, 1986
SUBDIVISIONS
Item No. E - Continued
PLANNING COMMISSION ACTION:
(11-11-86)
The applicant was present and submitted -a revised site plan
that met ordinance setback requirements. The Commission
voted 8 ayes, 0 noes, 3 absent to approve the application as
recommended by the staff, reviewed by the Subdivision
Committee, and agreed to by the applicant.
October 14, 1986
SUBDIVISIONS
Item No. 17
WIMUiMP
LOCATION:
OWNER/APPLICANT:
Central Church of the Nazarene
Conditional Use Permit
(Z-4738)
The south side of Baseline Road
just east of Loetscher Lane
(5121 Baseline Road)
Central Church of the Nazarene/
Dallas Hudspeth
PROPOSAL: To construct six buildings (temporary/portable? -
3,372 square feet) for use as a christian school (K-12th/150
capacity) within an existing church facility (250 capacity)
on land that is zoned "R-2."
1. Site Location
Adjacent to an arterial street (Baseline Road).
2. Compatibility with Neighborhood
The church is an existing use. It is surrounded by
single family uses on three sides with an office use
located to the north. The existing facility is
compatible with the surrounding area.
3. On -Site Drives and Parki
The property contains an ingress and two egresses to
Baseline Road. The property also contains 60 paved
parking spaces.
4. Screening and Buffers
No landscape plan has been submitted.
October 14, 1986
SUBDIVISIONS
Item No. 17 - Continued
5. Analysis
The staff feels that a church use on this property is
compatible with the surrounding area. The staff does,
however, have serious reservations about the proposal.
The staff cannot support the location of the six
proposed classrooms. The lack of setback (eight feet
side yard and 25 feet rear yard as required in "R-2")
and the proximity of the other building creates a
potential safety problem. The applicant needs to
investigate the possibility of relocating the
classrooms on the west side of the property and
providing the appropriate screening and landscaping on
the south property line.
6. City Engineering Comments
(1) There are a series of landscape and layout
problems as shown.
(2) Right-of-way dedication of 45 feet from the
centerline of Baseline Road is required.
(3) Stormwater detention is required - show
preliminary volume calculation.
(4) Redesign the driveway as shown by the Traffic
Engineer.
(5) Only one driveway is allowed'- this can be
accomplished by redesign.
(6) Forty-five degree parking is required on the east
side of the property in order to back a car out
properly - wheel stops are required on the new
parking area between the family life center and
the church.
6. Staff Recommendtion
Approval, provided the applicant agrees to: (1) submit
a revised site plan that includes relocation of the six
proposed classrooms, the appropriate screening and
landscaping, and the City Engineering concerns; and (2)
comply with City Engineering comments numbered 1
through 6 as listed above.
October 14, 1986
SUBDIVISIONS
Item No..17 - Continued
SUBDIVISION COMMITTEE REVIEW:
The applicant was not present. The issue was not discussed.
Additional comments are: (1) The Fire Department states
that the proposed structures cannot be occupied as is; and
(2) the Water Works states that on-site fire service is
recommended.
PLANNING COMMISSION ACTION: (10-14-86)
The applicant was present. There were no objectors. The
staff reiterated its recommendation of approval provided the
applicant agreed to meet staff recommendations. The
Commission noted that the applicant had not attended the
Subdivision Committee meeting and that no revised proposal
had been submitted. The Commission instructed the applicant
to contact the Fire Department immediately because of the
expressed safety concerns. The applicant agreed to comply.
The Commission then voted 6 ayes, 0 noes and 5 absent to
defer the application until the November 11, 1986, Planning
Commission meeting.
. r %
October 14, 1986
SUBDIVISIONS
Item No. 17
NAME: Central Church of the Nazarene
Conditional Use Permit
(Z-4738)
LOCATION: The south side of Baseline Road
just east of Loetscher Lane
(5121 Baseline Road)
OWNER/APPLICANT: Central Church of the Nazarene/
Dallas Hudspeth
PROPOSAL: To construct six buildings (temporary/portable? -
3,372 square feet) for use as a christian school (K-12th/150
capacity) within an existing church facility (250 capacity)
on land that is zoned "R-2."
1. Site Location
Adjacent to an arterial street (Baseline Road).
2. Compatibility with Neiqhborhood
The church is an existing use. It is surrounded by
single family uses on three sides with an office use
located to the north. The existing facility is
compatible with the surrounding area.
3. On -Site Drives and Parki
The property contains an ingress and two egresses to
Baseline Road. The property also contains 60 paved
parking spaces.
4. Screening and Buffers
No landscape plan has been submitted.
i
October 14, 1986
SUBDIVISIONS
Item No. 17 - Continued
5. Analysis
The staff feels that a church use on this property is
compatible with the surrounding area. The staff does,
however, have serious reservations about the proposal.
The staff cannot support the location of the six
proposed classrooms. The lack of setback (eight feet
side yard and 25 feet rear yard as required in "R-2")
and the proximity of the other building creates a
potential safety problem. The applicant needs to
investigate the possibility of relocating the
classrooms on the west side of the property and
providing the appropriate screening and landscaping on
the south property line.
6. Citv Enqineerinq Comments
(1) There are a series of landscape and layout
problems as shown.
(2) Right-of-way dedication of 45 feet from the
centerline of Baseline Road is required.
(3) Stormwater detention is required - show
preliminary volume calculation.
(4) Redesign the driveway as shown by the Traffic
Engineer.
(5) Only one driveway is allowed - this can be
accomplished by redesign.
(6) Forty-five degree parking is required on the east
side of the property in order to back a car out
properly - wheel stops are required on the new
parking area between the family life center and
the church.
6. Staff Recommendtion
Approval, provided the applicant agrees to: (1) submit
a revised site plan that includes relocation of the six
proposed classrooms, the appropriate screening and
landscaping, and the City Engineering concerns; and (2)
comply with City Engineering comments numbered 1
through 6 as listed above.
October 14, 1986
SUBDIVISIONS
Item No..17 - Continued
SUBDIVISION COMMITTEE REVIEW:
The applicant was not present. The issue was not discussed.
Additional comments are: (1) The Fire Department states
that the proposed structures cannot be occupied as is; and
(2) the Water Works states that on-site fire service is
recommended.
I
PLANNING COMMISSION ACTION: (10-14-86)
The applicant was present. There were no objectors. The
staff reiterated its recommendation of approval provided the
applicant agreed to meet staff recommendations. The
Commission noted that the applicant had not attended the
Subdivision Committee meeting and that no revised proposal
had been submitted. The Commission instructed the applicant
to contact the Fire Department immediately because o£.the
expressed safety concerns. The applicant agreed to comply.
The Commission then voted 6 ayes, 0 noes and 5 absent to
defer the application until the November 11, 1986, Planning
Commission meeting.