HomeMy WebLinkAboutZ-4653-D Staff AnalysisNAME: City Land Use Plan
Amendment - Ellis
Mountain District
LOCATION: West of Bowman Road,
north of Cherry Laurel
REQUEST: Multifamily to
Transition Zone
SOURCE: Staff - Z -4653-D
STAFF REPORT•
As part of a staff review for a rezoning request, the City
Land Use Plan in the area was reviewed. The Plan recommends
Multifamily for the site. The: proposal is for Office use.
Over the last couple of years, the land use plan for this
area of Little Rock has been changed significantly. The
City has removed all of the multifamily north of this
location to the Chenal Parkway and replaced it with
Commercial and some Office. This change has added to the
traffic congestion of the area.
To the east of Bowman the last multifamily area (which was
Low Density Multifamily) will be recommended for Suburban
Office by the Neighborhoods and Planning Staff. These
changes raise the appropriateness of preventing office
development for this site. while Planning Staff would
encourage a mix of residential use in the area and has
serious concerns about the loss of residential use in the
area, Transition Zone appears to be an appropriate land use
category. Transition Zone allows Office and Residential
use, thus options are made available for the site.
STAFF RECOMMENDATION:
Approval, to Transition Zone
'April °25', 1996
ITEM NO_: 8 FILE NO_: Z -4553-D
NAME: UNITED PROPERTIES SUBDIVISION, LOT 2
-- SHORT -FORM PLANNED DEVELOPMENT -COMMERCIAL
LOCATION: On the west side of Bowman Rd., approximately 400 feet
south of Kanis Rd.
DEVELOPER:
ENGINEER:
Pat McGetrick
UNITED PROPERTIES MCGETRICK ENGINEERING
c/o 11225 Huron Ln. Suite 200 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
223-9900 223-9900
AREA: 0.95 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2
PLANNING DISTRICT:
CENSUS TRACT: 42.07
PROPO, ED USES :
Ellis Mountain (18)
VARIANCES REOUESTED: None
BACKGROUND:
General office and
Enclosed retail uses
The lot on which the "Office/Retail" development is to take place
is Lot 2 of the United Properties Subdivision, the Preliminary
Plat of which is being reviewed for approval as Item 2 of the
Planning Commission agenda of April 25, 1996.
STATEMENT OF PROPOSAL:
The applicant proposes the development of a 0.95 acre tract for
"Office/Retail" uses. Proposed is construction of a 10,000
square foot building and the provision of 31 parking spaces. The
required dedication of right-of-way for and constriction of
improvements for Bowman Rd. are proposed, including construction
of the required sidewalk. Sections of retaining walls will be
needed to be constructed at the northwest and southwest corners
of the property.
Review by the Planning Commission and a recommendation for
approval to the Board of Directors is requested for a PCD.
April 25, 1996
giUBDIVISION
ITEM NO.: 8(Cont.)FILE NO.: Z -4653-D
B. E){_I_STING CONDITIONS:
The site is zoned residential, and has had a residential
structure located on iT for decades. The topography rises
from an elevation of approximately 310 feet MSL (Mean Sea
Level), to over 347 feet at the northwest corner, a
differential of 37 feet. (Thus the requirement for
construction of sections of retaining walls on the site.)
To the north of the site is a -non-conforming" commercial
use in an R-2 zoned area. To the west is the PCD site for
the Kanis Mini -Storage facility. To the south is R-2 zoned
property. Across Bowman Rd. is R-2 zoned property (but with
the non -conforming skating rink use located there), and,
across Bowman Rd., northeast of the tract, is C-3 zoned
property.
C. ENGINEERING/UTILITY COMMENTS:
Public works comments:
Lot 2 requires dedication of right-of-way for Bowman
Rd. to minor arterial standards and one-half street
widening, including relocation of City -owned utilities.
An "In -Lieu" is not recommended for this frontage.
This widening will allow for vehicles to get off the
traveled lanes prior to accessing the drive. The
entrance drive should be relocated to the south at
least 25 feet from the property line so that trucks can
access the dumpster which is assumed to be located in
an area to the south of the buildings. widen the drive
to 27 feet.
A grading permit is required.
The Stormwater Detention Ordinance applies.
Southwestern Bell Telephone Co. will required a 5 foot ease-
ment along the north, west, and south lot lines of Lot 2.
Little Rock Water Works comments that a pro -rata frontage
charge of $2.50/foot on Bowman Rd. applies. On-site fire
protection may be required.
Little Rock Wastewater Utility comments that sewer is
located along Bowman Rd. Contact Little Rock Wastewater
Utility for details.
The Fire Department approved the plat, but notes that there
is concern regarding the lack of access to the rear of the
building.
2
" April` 25, 1996
SUBDIVISION
ITEM NO.: 8 _c nt. FILE NO.: Z -46Q -DD
D. ISSUES/LEGAL/TECHNICAL I DUIGN:
No "Project Narrative"/"Cover Letter" has been submitted.
This is needed to relate the development rationale and to
outline the development plan, proposed uses, hours of
operation, lighting, signage, etc. It is a "statement
describing the character of the development...." It needs
to describe the types of uses requested ("Office" and
"Retail" is not a sufficient description), as well as
establish a ratio for the mixture of the various uses. The
development schedule, indicating The approximate date when
construction can be expected to begin and be completed,
needs to be included. The building height needs to be
noted.
No PCD application form has been filled out.
Information on the proposed treatment of the perimeter of
the property, including materials and techniques used for
screening, fencing, etc., has not been furnished..
A general schematic landscaping plan has not been furnished.
Provision for any dumpsters must be made. If dumpsters are
to be provided, the hours of servicing needs to be discussed
and established.
The Regulations require the applicant to submit a parking
analysis with the application, to address the adequacy of
the parking to be provided. This analysis has not been
furnished. Sec. 36-502 requires, for "business and
professional office" uses, 1 parking space for each 400
square feet of building area. This section requires, for
"general business and retail sales", 1 space for each 300
square feet of building area. Since the building is 10,000
square feet, if it is totally general business and retail
sales, it would require 33 parking spaces; if it is totally
"office", 25 spaces would be required. The applicant
proposes providing 31 parking spaces; therefore, if only a
small percentage of the building is "office" use, the
parking requirements will be satisfied. The ratio of the
mixture of the office versus the retail uses must be
established by the applicant to assure compliance with the
parking regulations.
The Site Plan Review Specialist Comments:
The building setback is sufficient to allow for the
required buffer areas to the south. A 6 foot high
opaque screen, either a wooden fence with its face
directed outward or dense evergreen plantings, are
3
April 25, 1996
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z -4653-D
required to screen this site from residential
properties to the south.
The Landscape Ordinance requires a 3 foot wide
landscape strip between the public parking areas and
the building; however, there is some flexibility in the
application of this provision.
Dumpster locations are required to be shown, and
dumpsters must be enclosed on three sides with a
minimum 8 foot tall masonry wall or wooden fence.
E. ANALYSIS -
The project engineer has submitted revised drawings which
are in substantial compliance with the regulations. The
dumpster location and proposed fencing must, however, be
shown.
The primary deficiency is the absence of the required
written documents, the "Project Narrative", or "Cover
Letter" and the applcation form. The applicant must
specifically note the uses, by Zoning District definitions
or classification, not just the generic "Office" and
"Retail", as shown on the plan.
The Planning staff notes that the site in the Ellis Mountain
District, and that the adopted Land Use Plan recommends
"Multi -Family" uses. During the review, staff reports, for
a previous zoning case, staff recommended a change to
"Transition Zone" for this area. Such a change will result
in their being no land use issue.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the PCD, subject to the
applicant defining the proposed uses and their "mix",
showing the dumpster location and addressing the hours of
servicing of the dumpster, and presenting the information
normally contained in the required "Project Narrative"/
"Cover Letter" (e.g., signage, hours of operation,
development schedule, etc.).
HDIVI I N g9MMITTEF C MMENT:
(APRIL 4, 1996)
Mr. Pat McGetrick, the project engineer, was present. Staff
outlined the request to the Subdivision Committee members, and
reviewed with Mr. McGetrick and the Committee the deficiencies
and comments contained in the discussion outline. The Committee
reviewed the proposed PCD site plan, and discussed the issues
with Mr. McGetrick. David Scherer, with the Public Works staff,
4
April` 25, 1996
' ,SUBDIVISION
ITEM N $
FILE NO,: Z-46 -D
discussed with Mr. McGetrick the right-of-way and street
improvements issues. Mr. McGetrick reported that he would make
the needed changes in the drawing and would supply staff with
revised drawings and information, as required. The Committee
forwarded the application to the full Commission for the public
hearing.
5