HomeMy WebLinkAboutZ-4649-D Staff AnalysisOctober 31, 2013
ITEM NO.: 3 FILE NO.: Z -4649-D
NAME: First Baptist Church Highland Park — Conditional Use
Permit
LOCATION: 3800 West 18th Street
OWNER/APPLICANT: First Baptist Church Highland Park/Ronald Ross,
Architect
PROPOSAL: A conditional use permit is requested to allow for the
construction of a church; including a sanctuary, family
life center and additional parking on this R-3 zoned
block.
O►:
3
SITE LOCATION:
The church occupies the block bounded by West 17th, West 18th, Pine and
Oak Streets.
COMPATIBILITY WITH NEIGHBORHOOD:
The church was located on this site for many years and has been an
important part of the community. On April 7, 2011, the Commission
approved a conditional use permit to allow for construction of this same
sanctuary building. The old sanctuary building was to be converted into
other church use. Earlier this year, the old sanctuary was destroyed by
fire. These current plans include the previously approved sanctuary, a
new family life center building and additional parking. It will allow the
church to rebuild and to continue to be a part of the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 500 feet of the site and the Stephens Area Faith, Hope, Love and
Midway Neighborhood Associations.
ON SITE DRIVES AND BARKING:
The new sanctuary is proposed to have a total seating capacity of
700 persons, requiring 175 parking spaces (4/700). 82 spaces are
existing or proposed to be located on the block. The church has other
existing parking located across the street for an additional 83 spaces. On
street parking is available and some church members will likely walk from
the surrounding neighborhood. Staff supports the variance to allow the
163 parking spaces as proposed.
October 31, 2013
ITEM NO.: 3(Cont.)FILE NO.; Z -4649-D
4. SCREENING AND BUFFERS:
1. Compliance with the City's Landscape and Buffer Ordinances is
required.
2. The site is located in the designated mature area and may qualify for
a twenty-five (25) percent reduction in buffer and landscape
requirements.
3. An eighteen (18) foot street buffer (in no case less than nine (9) feet) is
required on all perimeters.
4. Landscaping, including interior landscape islands, is required for the
new parking lot.
5. An upgrade to all existing landscaping is required due to the
redevelopment.
6. An automatic irrigation system is required for landscape areas.
7. Prior to issuance of a building permit, it will be necessary to submit an
approved landscape plan stamped with the seal of a Registered
Landscape Architect.
5. PUBLIC WORKS COMMENTS:
1. Due to the proposed use of the property, the Master Street Plan
specifies that 17th Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to thirty (30) feet
from centerline.
2. Due to the proposed use of the property, the Master Street Plan
specifies that Pine Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to thirty (30) feet
from centerline.
3. Due to the proposed use of the property, the Master Street Plan
specifies that W. 18th Street for the frontage of this property must
meet commercial street standards. Dedicate right-of-way to thirty
(30) feet from centerline.
4. Due to the proposed use of the property, the Master Street Plan
specifies that Oak Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to thirty (30) feet
from centerline.
5. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of 17th Street and Pine Street.
2
October 31, 2013
ITEM NO.: 3 Cont. FILE NO.: Z -4649-D
6. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of 18th Street and Pine Street.
7. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of 17th Street and Oak Street.
8. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of 18th Street and Oak Street.
9. Obtain a franchise agreement from Public Works (Bennie Nicolo,
371-4818) for the private improvements located in the right-of-way.
10. At time of issuance of a building permit, repair or replace any curb
and gutter or sidewalk that is damaged in the public right-of-way prior
to occupancy.
11. At the time of development, a grading permit in accordance with
Section 29-186 (c) and (d) will be required prior to any land clearing
or grading activities at the site. Other than residential subdivisions,
site grading and drainage plans must be submitted and approved
prior to the start of construction.
12. The proposed driveway locations do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. The width of
driveway must not exceed thirty-six (36) feet. Variances for driveway
locations must be requested.
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project
Entergy: Approved as submitted. Entergy currently has a distribution
power line running east and west in the alley between Pine and Oak
Streets. This line and easement will need to remain in place or customer
will to need to work with Entergy to relocate it. Relocation reimbursement
may be required.
Centerpoint Energy: No comment received.
AT&T (SBC): No comment received.
Water: No objection. All Central Arkansas Water requirements in effect at
the time of request for water service must be met.
Contact Central Arkansas Water regarding the size and location of the
water meter.
3
October 31, 2013
ITEM NO.: 3 Cont. FILE NO.: Z -4649-D
If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
Contact Central Arkansas Water if additional fire protection or metered
water service is required.
The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required.
If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the
first point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The test results must be sent to CAW's
Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
Fire Department: Approved as submitted. Fire hydrants (per Code),
maintain access.
County Planning: No Comments.
CATA: The site is located two (2) blocks from #16 UALR bus route.
SUBDIVISION COMMITTEE COMMENT: (OCTOBER 9, 2013)
Rev. Willis Walker and Architect Ronald Ross were present. Staff presented
the item and noted some additional information was needed regarding building
design and signage. In response to a question, Mr. Ross stated the church
desired to continue an after school program it currently operates. Staff noted
setback, buffer and parking variances would be required.
Public Works, Landscape and Utility Comments were presented. Staff noted
the requirement to dedicate right-of-way on all four streets and at all four
intersections. It was noted that variances would be needed for driveway
spacing and separations. Staff stated they would support the variances.
October 31, 2013
ITEM NO.: 3 (Cont.) FILE NO.: Z-4649-❑
It was noted that the church had a seating over 500 persons and additional
notification was required; including expanded notice to property owners within
500 feet rather than the typical 200 feet as well as the requirement of a public
meeting to be held prior to the Commission meeting. The applicants stated they
were prepared to meet those requirements.
The applicants were advised to submit responses to staff issues by Wednesday
October 16, 2013. The committee determined there were no other issues and
forwarded the item to the full Commission.
STAFF ANALYSIS:
First Baptist Church Highland Park is requesting approval of a conditional use
permit to allow for the construction of a new sanctuary, family life center and
additional parking on the R-3 zoned block bounded by West 17th, West 18th, Oak
and Pine Streets. On April 17, 2011, the Commission approved a conditional use
permit to allow for construction of this new sanctuary building in virtually this
same location. At that time, the existing sanctuary was located at the southeast
corner of the block. The old sanctuary building was proposed to be repurposed
for other church functions. Earlier this year, prior to construction of the new
sanctuary, the church suffered the total loss of the existing church building to fire.
The church now proposes to construct the new sanctuary and a separate family
life center building. The foundation of the former sanctuary building will be used
for additional parking. Associated with the redevelopment, the church is
requesting continued operation of its after-school program for approximately
60 children ages kindergarten — 5th grade.
The site slopes downward approximately 18 feet from Pine Street to Oak Street.
The sanctuary will be split-level with the sanctuary on the main level and
classroom and meeting space on the east side of the building on the lower level.
The building will have a brick exterior with metal roof. Building height is 39 feet
8 inches from finished floor to top of roof. A 39 foot tall steeple will top the
building.
The family life center building will have a brick and metal panel exterior with
metal roof. Total height of this building is proposed at 50 feet.
Signage will comply with that allowed in office and institutional zones. The
dumpster site is located off of the alley, between the sanctuary and FLC
buildings.
5
October 31, 2013
ITEM NO.: 3 (Cont.
FILE NO.: Z -4649-D
The project as proposed does require several variances, some precipitated by
the required right-of-way dedication. Setbacks of five (5) feet are proposed on
the north (17th Street) and south (alley). The covered drop-off at the front of the
church has a setback of fifteen (15) ± feet. These are somewhat less than what
is typically required. The building height exceeds the R-3 district height of
35 feet., Street buffers actually appear to meet or exceed the requirements
other than at the points along 17 h Street where the two buildings are at the 5 foot
setback. The applicant has requested and staff recommends approval of the
driveway spacing and separation variances to allow the driveways as proposed.
The applicants did send notices and held the required pre -hearing neighborhood
meeting at the Centre at University Park (formerly the Adult Leisure Center) on
October 10, 2013 from 4:00 — 7:00 p.m. The applicant stated no one from the
neighborhood attended and voiced any concerns.
To staff's knowledge, there are no outstanding issues. The bill of assurance for
Braddock's Addition does not address use issues.
STAFF RECOMMENDATION:
Staff recommends approval of the requested CUP subject to compliance with
the comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff
report.
Staff recommends approval of the requested building height, building setback,
street buffer, on-site parking and driveway spacing and separation variances.
PLANNING COMMISSION ACTION: (OCTOBER 31, 2013)
The applicant was present. There were no objectors present. Staff presented the
item and a recommendation of approval as outlined in the "staff recommendation"
above. There was no further discussion. The item was placed on the consent
agenda and approved as recommended by staff, including all staff comments and
conditions and recommended variances. The vote was 9 ayes, 0 noes, 1 absent
and 1 open position.
n