HomeMy WebLinkAboutZ-4645-D Staff AnalysisJuly 23, 1998
ITEM NO.: 13
NAME:
LOCATION•
OWNER/APPLICANT-
PROPOSAL•
ORDINANCE DESIGN STANDARDS:
1. Site Location:
FILE NO.: Z -4645-D
Rick's LP Gas - Revised
Conditional Use Permit
5715 Patterson Road
Rick's LP Gas
To amend an existing
conditional use permit to
allow for an additional 60' X
40' building to be located on
this I-3 zoned property.
This site is located on the east side of Patterson
Road, a few blocks north of 65th Street, near the
intersection with Hoffman Road.
2. Compatibility with Neighborhood:
This site is located in -an area of mixed industrial and
commercial uses on the northern fringe of the 65th
Street Industrial District. Other uses in the area
include an oil distribution company, industrial bakery,
auto repair garage, and a small strip center containing
a variety of uses.
The properties immediately adjacent on all sides of
this I-3 zoned property are zoned I-2. The property
is bounded on the east by a spur of the MoPac railroad
line with a 180' right-of-way. The proposed use is
compatible with the neighborhood.
The Geyer Springs and Wakefield Neighborhood
Associations were notified of the public hearing.
3. On -Site Drives and Parking:
There is a single existing 36' wide entrance/exit
driveway to the property which will not change. The
existing graveled area will be extended to and around
the new building. Existing parking exceeds
requirements for the current building and the
requirements generated by this additional building.
July 23, 1998
SUBDIVISION
ITEM NO.: 13 (Cont.) FILE NO.: Z -4645-D
The applicant is requesting a variance from the paving
requirement for the new driveway extension.
4. Screening and Buffers:
No additional landscaping is required.
5. Public Works Comments:
1. Patterson Street is listed on the Master Street
Plan as a collector street. Dedicate right-of-way
to 30 feet from centerline.
2. Stormwater detention Ordinance applies to this
property.
3. Easements for proposed stormwater detention
facilities are required.
4. Patterson Road has a 1996 average daily traffic
count of 6,000 ADT.
6. Utility and Fire Department Comments:
Water: Contact the Water Works if additional water
service is required. The Fire Department must
review these plans to determine whether -additional
fire protection is required.
Wastewater: Sewer available in Patterson Road, not
adversely affected. _
Southwestern Bell: Approved as submitted.
ARKLA and AP&L: No Comment received.
Fire Department: Maintain open access all around new
building.
LATA: This site is not located on a CATA bus route.
7. Staff Analysis:
Rezoning this property from I-2 to I-3 and a
conditional use permit were approved November 30, 1993.
The conditional use permit was to allow Rick's LP Gas
business to locate on this 5.01 acre tract. The
applicant now proposes to add towards the rear of the
property an additional 40' X 60' building for storage
of gas cylinders, merchandise, and to provide a covered
work area.
Existing parking is more than sufficient to meet
requirements for the proposed added building. The
applicant proposes to provide access to and around the
2
July 23, 1998
SUBDIVISION
ITEM NO.: 13 (Cont.)
FILE NO.: Z -4645-D
new building by extending the gravel area to the new
building rather than with solid paving. This would
require a waiver to the ordinance requirement in
Section 36-508 for paving of all areas subject to
wheeled traffic. Staff supports this waiver request
since this area is not for public use, but only for
employees access to the new building.
8. Staff Recommendation:
Staff recommends approval of the application subject to
compliance with Public Works and Fire Department
Comments.
Staff also recommends approval of the waiver of the
requirement for paved access to the new building.
SUBDIVISION COMMITTEE COMMENT: (JULY 2, 1998)
Bob Roddy was present representing the application. Staff
gave a brief description of the proposal.
Public Works restated the need for a 30' right-of-way
dedication on Patterson Drive. Applicant needs to show
proof of dedication or accomplish the dedication prior to
issuance of a building permit.
Staff also reminded the applicant of the need to maintain
open access all around the new building of at least 15 feet
as shown on site plan.
A revised site plan will be submitted showing parking space
layout in front parking lot and the revision of new gravel
area in and around the new building. Applicant was told to
submit a variance request letter regarding use of gravel
versus paving.
There being no further issues, the Committee accepted the
proposal and forwarded the item to the full Commission for
final resolution.
PLANNING COMMISSION ACTION:
(JULY 23, 1998)
Bob Roddy was present representing the application. There
were no objectors present. Staff presented the item with a
recommendation for approval subject to compliance with staff
comments.
3
July 23, 1998
SUBDIVISION
ITEM NO.: 13 {Cont.}
FILE NO.: Z -4645-D
Staff also recommended approval of the variance to have a
gravel drive and parking area to and around the new building
area.
The item was placed on the Consent Agenda and approved as
recommended by staff. The vote was 11 ayes, 0 noes and
0 absent.