HomeMy WebLinkAboutZ-4567 Staff AnalysisNovember 12, 1985
SUBDIVISIONS
Item No. 24
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
Central Baptist Church
Conditional Use Permit
(Z-4567)
Between W. 10th and 12th Sts.,
West of S. Filmore
Central Baptist Church/Lee
Clements
To construct a 22,000 square foot addition (750 seat
auditorium, office and classroom space) and approximately 81
additional parking spaces to an existing church facility on
4.641 acres of land that is zoned "R-2."
ORDINANCE DESIGN STANDARDS
1. Site Location
This site is located adjacent to a principle arterial
(West 12th Street) and a minor arterial (West 10th
Street).
2. Compatibility with Neighborhood
This property lies in a mixed use area. A commercial
lies to the south, a light industrial use to the east,
an office use to the west, and vacant land to the
north. The church is an existing use, and the staff
foresees no adverse impact to the surrounding area by
expanding this use.
3. On -Site Drives and Parking
Two access drives will and do serve this site (West
10th Street and West 12th Street). This site now
contains 70 parking spaces, but will contain 151 paved
parking spaces when the project is complete.
4. Screening and Buffers
The applicant has submitted a landscape plan.
November 12, 1985
SUBDIVISIONS
Item No. 24 - Continued
5. Analysis
The staff foresees no adverse impact to the surrounding
area. The applicant does, however, need to submit a
revised site plan which shows the setback dimensions of
the two proposed storage buildings and increases the
width of the West 10th Street access drive to 20 feet.
6. City Engineering Comments
1. The traffic engineer requires that the applicant
meet with him as soon as possible to review the
overall -traffic flow.
2. Parking spaces and entry drive from 12th Street
are located in the designated floodway of Coleman
Creek. Therefore, the applicant must obtain a
variance from the Board of Adjustment to use these
spaces and drives. Engineering will support this
if the following items are agreed to: (a) no
increase in the existing ground service within the
floodway area, and no fill to accommodate parking;
(b) that the church is made aware that the
proposed parking spaces are at an elevation of
approximately 323 feet to 322 feet M.S.L. The 100
year flood elevation in this area is approximately
329 feet to 328 feet M.S.L..
3. Show preliminary detention calculations and area
locations.
STAFF RECOMMENDATION:
Approval, provided the applicant agrees to: (1) submit a
revised site plan that shows the setback dimensions of the
two proposed storage buildings, (2) increases the width of
the West 10th access drive to 20 feet; (3) comply with City
engineering comments Nos. 1, 2 and 3.
SUBDIVISION COMMITTEE REVIEW:
The applicant was present and agreed to submit a revised
site plan. There was a lengthy discussion about the parking
area being within the floodway of Coleman Creek. The staff
stated that their recommendation of approval was subject
to the Board of Adjustment approving the variance request
for parking within the floodway. The Water Works stated
that on-site fire system was required.
f_
November 12, 1985
SUBDIVISIONS
Item No. 24 - Continued
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. The
Commission voted 11 ayes, 0 noes and 0 absent to approve the
application as recommended by staff, reviewed by the
Subdivision Committee and agreed to by the applicant.
1
November 12, 1985
SUBDIVISIONS
Item No. 24
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
Central Baptist Church
Conditional Use Permit
(Z-4567)
Between W. 10th and 12th Sts.,
West of S. Filmore
Central Baptist Church/Lee
Clements
To construct a 22,000 square foot addition (750 seat
auditorium, office and classroom space) and approximately 81
additional parking spaces to an existing church facility on
4.641 acres of land that is zoned "R-2."
ORDINANCE DESIGN STANDARDS
1. Site Location
This site is located adjacent to a principle arterial
(West 12th Street) and a minor arterial (West 10th
Street).
2. Compatibility with Neighborhood
This property lies in a mixed use area. A commercial
lies to the south, a light industrial use to the east,
an office use to the west, and vacant land to the
north. The church is an existing use, and the staff
foresees no adverse impact to the surrounding area -by
expanding this use.
3. On -Site Drives and Parkin
Two access drives will and do serve this site (West
10th Street and West 12th Street). This site now
contains 70 parking spaces, but will contain 151 paved
parking spaces when the project is complete.
4. Screening and Buffers
The applicant has submitted a landscape plan.
November 12, 1985
SUBDIVISIONS
Item No. 24 - Continued
5. Analysis
The staff foresees no adverse impact to the surrounding
area. The applicant does, however, need to submit a
revised site plan which shows the setback dimensions of
the two proposed storage buildings and increases the
width of the West 10th Street access drive to 20 feet.
6. City Engineering Comments
to The traffic engineer requires that the applicant
meet with him as soon as possible to review the
overall traffic flow.
2. Parking spaces and entry drive from 12th Street
are located in the designated floodway of Coleman
Creek. Therefore, the applicant must obtain a
variance from the Board of Adjustment to use these
spaces and drives. Engineering will support this
if the following items are agreed to: (a) no
increase in the existing ground service within the
floodway area, and no fill to accommodate parking;
(b) that the church is made aware that the
proposed parking spaces are at an elevation of
approximately 323 feet to 322 feet M.S.L. The 100
year flood elevation in this area is approximately
329 feet to 328 feet M.S.L..
3. Show.preliminary detention calculations and area
locations.
STAFF RECOMMENDATION:
Approval, provided the applicant agrees to: (1) submit a
revised site plan that shows the setback dimensions of the
1 two proposed storage buildings, (2) increases the width of
the West 10th access drive to 20 feet; (3) comply with City
engineering comments Nos. 1, 2 and 3.
SUBDIVISION COMMITTEE REVIEW:
The applicant was present and agreed to submit a revised
site pl-an. There was a lengthy discussion about the parking
area being within the floodway of Coleman Creek. The staff
stated that their recommendation of approval was subject
to the Board of Adjustment approving the variance request
for parking within the floodway. The Water Works stated
that on-site fire system was required.
November 12, 1985
SUBDIVISIONS
Item No, 24 - Continued
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. The.
Commission voted 11 ayes, 0 noes and 0 absent to approve the
application as recommended by staff, reviewed by the
Subdivision Committee and agreed to by the applicant.