Loading...
HomeMy WebLinkAboutZ-4555-C Staff AnalysisJanuary 20, 2005 [TEM NO.: 10 FILE NO.: Z NAME: Lot 1, Ardoin Industrial Subdivision Zoning Site Plan Review LOCATION: NW corner of Clearwater Drive and Shackleford Road DEVELOPER: Pete Ardoin 7400 Enmar Drive Little Rock, AR 72209 ENGINEER: McGetrick and McGetrick #10 Otter Creek Court, Suite "A" Little Rock, AR 72209 501-455-8899 AREA: 2.5t Acres ZONING: 1-1 NUMBER OF LOTS: 1 FT. NEW STREET: 0 ALLOWED USES: Light Industrial PROPOSED USE: Office/Showroom/Warehouse VARIANCES/WAIVERS REQUESTED: 1. 40 -foot setback from R-2 zoned property to the north; 100 feet required. BACKGROUND: In 1986, an 8.6t acre tract including this site was rezoned from MF -18 to 1-1. In 1995, a two -lot plat was approved along with a zoning site plan to build a 30,000 square foot light industrial building on Lot 2. A. PROPOSAL/REQUEST: 1-1 is a zoning site plan review district. The applicant is requesting approval of a site plan for Lot 1 which includes a 19,800 square foot warehouse building, a 27 space parking lot and a truck loading/unloading area. January 20, 2005 SUBDIVISION ITEM NO.: 10 [Cont. B. EXISTING CONDITIONS: FILE NO.: Z4 The site is cleared and undeveloped. The property is located in an industrial park setting that currently contains several office/warehouse buildings. Properties along this portion of Shackleford Road are zoned 1-1, PID and R-2. Many of the properties, including those to the north and east are undeveloped. C. NEIGHBORHOOD COMMENTS.- Notices OMMENTS: Notices were sent to all owners of property located within 200 feet of the site and the Stagecoach -Dodd Neighborhood Association. As of this writing, staff has received no comments. D. ENGINEERING COMMENTS: Public Works Conditions: 1. A 20 feet radial dedication of right-of-way is required at the intersection of Shackleford Road and Clearwater Drive. 2. Provide design of street conforming to the Master Street Plan. Construct one- half street improvement to these streets including 5 -foot sidewalks with planned development. Match curb line to the south. Show the improvements on the plan. 3. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield). 4. A grading permit in accordance with Section 29-186(c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 5. Storm water detention ordinance applies to this property. The detention facilities as shown on the plan appear to be too small. Provide calculations that demonstrate adequate area is provided. 6. Provide the direction of flow and all storm water flows (Q) entering and leaving the property and existing contours. 7. Prepare a letter of pending development addressing street lights as required by Section 31-403 of the Little Rock Code. Contact Traffic Engineering at January 20, 2005 SUBDIVISION ITEM NO.: 10 (Cont.) FILE NO.: Z -4555-C (501) 379-1813 (Steve Philpott) for more information regarding street light requirements. 8. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. Locate drive 300' from the adjacent Clearwater Drive right-of-way. The width of driveway must not exceed 36 feet. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available, not adversely affected. Entergy: No Comments received. Reliant: No Comments received. Southwestern Bell: Approved as submitted. Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). A Capital Investment Charge based on the size of connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Place fire hydrant per code. County Planning: No Comments. CATA: The site is not located on a CATA bus route. F. ISSUES/TECHNICAL/DESIGN: Plannina Division: No Comments. K January 20, 2005 UBDIVISION ITEM NO.: 10 Cont. FILE NO.: Z -4555-C Landscape Issues: Compliance with the City's Landscape and Buffer Ordinances is required. Interior landscape islands are 529 square feet less than the 1,213 square feet required by the landscape ordinance. A twenty-four (24) foot wide land use buffer is required to separate the proposed development from the residential property to the north. Seventy percent (70%) of this buffer is to remain undisturbed. A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the northern perimeter of the site. An automatic irrigation system to water the landscaped areas will be required. G. SUBDIVISION COMMITTEE COMMENTS: (DECEMBER 29, 2004) Patrick McGetrick was present representing the application. Staff presented the item and noted additional information was needed on signage, building design, use mix, fencing and dumpster location. The applicant was instructed to redesign the parking lot to provide minimum stall and driveway dimensions, to provide approval from Central Arkansas Water for use of the private access drive and to provide a completed owner authorization form. Staff noted that Lot 1 had not yet been final -platted. Staff informed the Committee of a variance to allow a 40 -foot setback on the north. It was felt that the adjacent property, although zoned R-2, would not develop as residential and the variances was appropriate. It was noted that the lot was platted with a 25 foot building line on Shackleford Road, which superceded the ordinance requirement of a 70 -foot setback. Public Works, Landscape and Utility Comments were all noted. Staff stated the proposed driveway on Clearwater Drive was allowed since it was shared with the property adjacent to the west. The applicant was directed to respond to staff issues by Wednesday, January 5, 2005. The Committee then forwarded the item to the full Commission. H. ANALYSIS: The applicant proposes the construction of a 19,800 square foot office, showroom and warehouse building on this 1-1 zoned, 1.92 acre tract. The 1-1, Industrial Park District, requires site plan review by the Planning Commission. 4 January 20, 2005 SUBDIVISION ITEM NO.: 10 Cont. FILE NO.: Z -4555-C The proposed development also includes a 27 space parking lot and a truck loading/unloading area. Access is from a driveway onto Shackleford Road and a shared driveway off of Clearwater Drive. The building will be sectioned -off into as many as 8 units with loading bays in the rear of the building. The building will be 22 feet in height and will be constructed of concrete tilt walls with a flat metal roof. Hours of operation for the businesses within the building are proposed to be 7:00 a.m. through 7:00 p.m., 7 days a week. On January 5, 2005, the applicant responded to issues raised at Subdivision Committee. A 6 -foot tall, wood privacy fence has been shown along the north property line. Three dumpster locations are shown at the rear of the building. They are to be screened to comply with code requirements. Interior landscaping has been increased and the parking lot has been redesigned to meet minimum stall depth and maneuvering area. A single, ground -mounted sign is shown at the southeast corner of the site. The sign will comply with ordinance standards for industrial districts; 30 feet in height and 72 square feet in area. Wall signage will comply with ordinance standards. Although the 1-1 district typically requires a 70 -foot front yard setback, this lot was platted with a 25 -foot building line. The building is set at 58 feet. The Ordinance requires a 100 -foot setback from buildings on 1-1 zoned properties to any residentially zoned property. The property to the north is zoned R-2 and the proposed building has a setback of 40 feet. That adjacent R-2 zoned property is vacant and it is staff's opinion that the property will not develop as residential. Also, since the adjacent property is zoned R-2, a 24 -foot land use buffer is required. The applicant has proposed an 18 -foot buffer and the installation of a 6 -foot tall, wood privacy fence. The driveway locations have been addressed. The applicant has not yet addressed Public Works' concerns about storm water detention and improvements to Shackleford Road (Public Work Comments 2, 5 and 6). Staff is supportive of variances from the building setback and land use buffer requirements. The proposed building is to have a use mix of 60% warehouse, 30% office and 10% showroom. Use of the building must comply with allowable uses in 1-1, including the definition of office, showroom and warehouse. STAFF RECOMMENDATIONS: Staff recommends approval of the proposed site plan subject to compliance with the following conditions: 1. Compliance with the comments and conditions outlined in Sections D, E and F of the Staff Report. Staff recommends approval of variances to allow a 40 -foot building setback on the north and to allow an 18 -foot buffer on the north. yi January 20, 2005 SUBDIVISION ITEM NO.. 10 (Cont.) FILE NO.: Z -4555-C PLANNING COMMISSION ACTION: (JANUARY 20, 2005) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the conditions outlined the "Staff Recommendation" above. There was no further discussion. The item was placed on the Consent Agenda and approved as recommended by staff by a vote of 10 ayes, 0 noes and 1 absent. D