Loading...
HomeMy WebLinkAboutZ-4555-B Staff AnalysisFebruary 21, 1995 ITEM NQ_: 6 FILE NO.: Z -4555-B NAME: CAPITOL CITY PACKAGING, INC. -- SITE PLAN REVIEW LOCATION: On the west side of South Shackleford Road, approximately 0.4 mile south of the Colonel Glenn Road interseciton .DEVELOPER: ENGINEER• Pete Ardoin Pat McGetrick c/o James Osborne MCGETRICK ENGINEERING CENTRAL STRUCTURES COMPANY 11225 Huron Ln., Suite 200 P. O. Box 95031 Little Rock, AR 722111 Little Rock, AR 72295 223-9900 376-3694 AREA: 2.5 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0 ZONING: I-1 PROPOSED USES: Packaging Supplies and Service PLANNING DISTRICT: 12 CENSUS TRACT: 24.05 VARIANCES__REQUESTED : None STATEMENT OF PROPOSAL: The applicant proposes the development of a 2.5 acre lot, which is to have its frontage on and access from an existing private street, Waterworks Dr., and an access easement which lie along the lot's southern boundary. A 30,000 square foot, single -story, building is proposed to be erected, and parking for 58 vehicles is to be provided. Landscaping, to meet City standards, is proposed. STAFF REPORT: The application is coupled with Item 2a, Ardoin Industrial Subdivision Preliminary Plat. In the preliminary plat issue, the access from a private street and the requirements for establishment of an access easement are addressed. The approval of the preliminary plat and the Planning Commission granting the variance for the private street and access easement are required for the approval of the site plan for the subject item. February 21, 1995 SUBDIVISION ITEM NO.: 6 (Continued_)_ FILE NO__ Z -4555--B A. PROPOSAL/REQUEST: Approval by the Planning Commission of the proposed site plan is requested. No variances are requested as part of this item. .B. EXISTING CONDITIONS: The site is undeveloped, but has been cleared in preparation for the construciton of the building. The existing zoning is I-1, and this I-1 district extends to all land to the west, south, and across S. Shackleford Rd. to the east. Immediately to the north of the site is R-2 zoned land. C. ENGINEERING UTILITY COMMENTS: Public Works comments that a sketch grading and drainage plan, meeting the requirements of Sec. 29-186, is required; a grading permit will be required. Water Utilities comments that: 1) The Fire Department needs to evaluate this project to determine the location of required fire hydrant(s); and 2) A pro -rata front footage charge of $12.00 per foot applies, in addition to normal connection charges, along Clearwater Dr. (486.09 feet @ $12.00 per foot = $8,833.08) Wastewater Utilities comments that sewer is available, with no adverse effect. The Fire Department approved the submittal without comment. D. ISSUESILEGALJTECHNICALIDESIGN: Neighborhoods and Planning Staff comments that 1) The availability of public utilities, with the size and locaiton shown, is to be addressed on the site plan; and 2) On site fire hydrants, both existing and proposed, are to be shown. Landscape review comments that a six foot high opaque screen will be required along the northern perimeter of the site. This screen may be a wood fence with its face directed northward, or be dense evergreen plantings. With the exception of those areas devoted to loading and unloading, six percent of the interior of the vehicular use area must be landscaped. A three-foot wide landscape strip between the public parking areas and the building is required, except at doorways. 2 February 21, 1995 SUBDIVISION ITEM NO.: 6 Continued FILE NO.: Z -4555-B E. ANALYSIS: There are only minor deficiencies in the submittal to be addressed, and these may easily be completed. The site plan, as revised and presented, is sufficiently detailed and complete to meet the requirements of the regulations. Subject to the approval of Item 2a, Ardoin Industrial Subdivison Preliminary Plat; approval of the private drive for access to the site; and, providing evidence of the establishment of an access easement along the south boundary of the site to provide the required legal access to the lot, the site plan can be approved. F. STAFF RECOMMENDATIONS: Staff recommends approval of the site plan, subject to the conditions noted. SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 2, 1995) Mr. Jim Osborne, representing the applicant, was present. The applicant had requested a site plan review for a development to include the property extending to S. Shackleford Rd., with the tract being a single 4.4 acre lot. In the discussion on the item, the applicant indicated that he would probably want to divide the site at a later date, and sell or develop the S. Shackleford Rd. frontage at that time. Staff pointed out that, if a preliminary plat were proposed concurrent with the site plan review, and development of the S. Shackleford Rd. fronting lot were developed at a later date, the required Master Street Plan improvements along S. Shackleford Rd. could be deferred until -the second lot were developed. Mr. Osborne indicated that the applicant would want to pursue this course and reported that Mr. Pat McGetrick, the project engineer, would provide the required preliminary plat and a revised site plan for review. The Committee reviewed with Mr. Osborne the information presented in the discussion outline, and Mr. Osborne responded that the deficiencies would be addressed. The Committee forwarded the site plan review item to the Commission for the public hearing. PLANNING COMMISSION ACTION: (FEBRUARY 21, 1995) Staff reported that there were no issues to resolve; that Waterworks had approved the needed access to the site from their private street. Staff recommended approval for the site plan, subject to the conditions for approval of the preliminary plat being met, and subject to a final plat for the Lot -2 being 3 February 21, 1995 SUBDIVISION ITEM NO.: 5 Continued FILE NO.: Z --4555-B approved and filed with the Circuit Clerk. The item on the ConsentAgenda for approval, and was approved 0 nays, 2 vote of 9 ayes, absent, and 0 abstentions. 4 was included with the