HomeMy WebLinkAboutZ-4524-G Staff AnalysisFILE NO.: Z-4524-G
NAME: GCC Addition Lot 2 Short -form POD
LOCATION: Located at 13000 Cantrell Road
DEVELOPER:
JGS IV, Inc.
c/o Gregory Saad
3601 Spring Hill Business Park, Suite 200
Mobile, AL 36608
ENGINEER:
Development Consultants, Inc.
c/o Robert Brown
2200 North Rodney Parham Road, Suite 220
Little Rock, AR 72212
AREA: 2.90 acres
CURRENT ZONING
ALLOWED USES
NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
0-2, Office and Institutional District
Office and Institutional Uses
PROPOSED ZONING: POD
PROPOSED USE: 0-2, Office and Institutional District Uses —
Variation from the Highway 10 DOD to allow the creation of
lots with less than the typical 2-acre minimum lot size.
VARIANCESIWAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The request is a rezoning to POD to allow the subdivision of an existing 2.9-acre
lot into two lots with lot areas less than the two -acre typical minimum requirement
per the Highway 10 Design Overlay District. Proposed Lot 2A will contain
1.33 acres and proposed Lot 2B will contain 1.57 acres. Lot 2A contains an
existing 6,740 square foot office building and Lot 2B is proposed with a
8,000 square foot office building. The two lots are proposed to share a single
ground mounted monument sign with a maximum height of 10 feet and a
FILE NO.: Z-4524-G (Cont.
A
maximum sign area of 100 square feet. No new drives are proposed from
Cantrell Road.
EXISTING CONDITIONS:
On the eastern portion of the lot there is an office building containing an
insurance agency and the western portion of the lot is wooded. The site is
accessed from an existing common access easement located along the eastern
perimeter and a driveway located on Cantrell Road. The area contains a number
of uses including office and retail uses. The Center at 10 is located south of this
site which is a mixed use development containing a multi -story office building, a
bank and retail. East of the site is a single story office building currently
operating as an abstract company and north of the site is a church.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site, all residents, who could be
identified, located within 300 feet of the site, the Pankey Community
Improvement District and the Coalition of West Little Rock Neighborhoods were
notified of the Public Hearing.
D. ENGINEERING COMMENTS:
E.
PUBLIC WORKS CONDITIONS:
1. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan along the
west side of the private street from Highway 10. Sidewalk must be extended
along Cantrell Road to the western property line.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
3. Storm water detention ordinance applies to this property.
4. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
5. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project.
Enter : No comment received.
Center -Point Ener : No comment received.
P�
ILE NO.: Z-4524-G (Cont.
AT & T: No comment received.
Central Arkansas Water: No objection to plans for Lot 2A. For the development
of Lot 213: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. A Capital Investment Charge based on
the size of connection(s) will apply to this project in addition to normal charges.
This fee will apply to all meter connections including any metered connections off
the private fire system. On -site private fire hydrant(s) will be required. Contact the
Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding
procedures for installation of the hydrant(s).
Fire Department: Place and install fire hydrants per code. Contact the Little
Rock Fire Department for additional information.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express
Route.
F. ISSUESITECHNICAL/DESIGN:
Planning Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Office for this property. The applicant has
applied for a rezoning from 0-2, Office and Institutional District to Planned Office
Development to allow the creation of two lots with lot sizes less than the typical
lot size required per the Highway 10 Design Overlay District.
The request does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is a Principal Arterial. The primary function of
a Principal Arterial is to serve through traffic and to connect major traffic
generators or activity centers within urbanized areas. Entrances and exits should
be limited to minimize negative effects of traffic and pedestrians on Cantrell Road
since it is a Principal Arterial. The street may require dedication of right-of-way
and may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: The River Mountain Neighborhood Plan covers this
area, but the Plan does not address this issue.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
3
FILE NO.: Z-4524-G (Cont.
2. This application will be reviewed as an overall development plan. The
Highway 10 Overlay District requirements are applicable to each of the lots at
the time of development. A landscape plan stamped with the seal of a
registered landscape architect and an automatic irrigation system will be
required for each of the individual lots.
3. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 20, 2008)
Mr. Robert Brown of DCI and Mr. Todd Rice of Hathaway International were
present representing the owner. Staff presented an overview of the development
stating there were few outstanding issues associated with the request. Staff
stated they did not typically support the creation of lots with less than the
two -acre minimum lot size without a development plan. Staff stated Mr. Brown
had provided a site plan to include a building footprint, landscaping and parking
lot layout on the second lot.
Public Works comments were addressed. Staff stated the storm water detention
ordinance would apply to development of the site. Staff also stated sidewalks
with appropriate handicap ramps were required along the west side of the private
street from Highway 10.
Landscaping comments were addressed. Staff stated at the time of development
or redevelopment of either of the lots, a landscape plan stamped with the seal of
a registered landscape architect was required. Staff stated irrigation for each of
the lots was also required.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact these agencies for additional
information. There being no further issues for discussion, the Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the November 20, 2008, Subdivision Committee meeting. At the time of
future development or redevelopment of the property, a landscape plan stamped
with the seal of a registered landscape architect will be provided and each of the
lots will be irrigated to water landscaped areas. Sidewalks with appropriate
handicap ramps will also be installed.
The property is currently zoned 0-2, Office and Institutional District and is located
within the Highway 10 Design Overlay District. The site is an existing platted lot
containing 2.9-acres. The applicant is requesting to create two lots with lot sizes
C!
FILE NO.: Z-4524-G (Cont.
less than the two -acre typical minimum requirement per the Highway 10 Design
Overlay District. Proposed Lot 2A will contain 1.33 acres and proposed Lot 2B
will contain 1.57 acres.
The applicant is requesting 0-2, Office and Institutional District uses as allowable
uses for the lots. Lot 2A contains an existing 6,740 square foot office building
and Lot 2B is proposed with a 8,000 square foot office building. Lot 2A contains
34 parking spaces and Lot 2B is proposed with 29 parking spaces. Based on the
typical ordinance standards for an office development, the parking proposed for
the individual lots is more than adequate to serve the lots.
The two lots are proposed to share a single monument sign with a maximum
height of 10 feet and a maximum sign area of 100 square feet. The signage
proposed is consistent with signage allowed per the Overlay. Building signage is
proposed consistent with signage typically allowed in office zones.
The office hours of operation are from 7 am to 5 pm Monday through Friday. The
hours of dumpster service are limited to daylight hours.
Per the Highway 10 Design Overlay District, parking lot lighting shall be designed
and located in such a manner so as not to disturb the scenic appearance
preserved in the corridor. Lighting should be directed to the parking areas and
not reflected into the adjacent neighborhoods. The note indicates site lighting will
comply with typical ordinance standards for the Highway 10 Design Overlay
District.
The site plan indicates building setbacks and landscaping per the typical
Highway 10 Design Overlay District standards. No new drives are proposed from
Cantrell Road. The site plan indicates the placement of a dumpster facility for
the new lot within the rear yard area.
The following chart is a summary of the Overlay requirements and the applicant's
proposal related to the typical ordinance requirements.
Highway 10 DOD Requirements
Lot size. There shall be a minimum
development tract size of not less than two
(2) acres.
Front yard. All principal and accessory
buildings or structures are required to have
a one -hundred -foot building setback from
the property line abutting Highway 10.
j Applicant's proposal:
Lot 2A contains 1.33 acres
Lot 2B contains 1.57 acres
Variation from the Overlay Standard.
The building line is indicated in excess of
100-feet.
Rear yard. Rear yard shall not be less The building proposed for Lot 2B is set in
than forty (40) feet. excess of the 40-foot rear yard setback.
excess
building located on Lot 2A is existing
5
FILE NO.: Z-4524-G (Cont.
Side yard. Side yard shall not be less than
thirty (30) feet.
Landscaping treatment. Landscaped
areas shall attempt to incorporate existing
on -site trees and shrubbery into the
landscaping scheme and the plans shall
indicate such incorporation.
Landscaped areas shall have water
sprinkler systems to maintain plant
materials.
Erosion retardant vegetation shall be used
on all cuts and fills.
Tree species to be planted within this
corridor should be consistent with other
species present.
The Highway 10 frontage (front yard) shall
consist of a minimum of forty (40) feet of
landscaped area exclusive of right-of-way.
The landscaped area shall contain organic
and/or combined man-made/organic
features as berms, brick walls and dense
plantings such that vehicular use areas are
screened when viewed from an elevation
of forty-two (42) inches above the
elevation of the adjacent street. Alternative
screening methods and designs must be
approved by the plans review specialist.
Appeals from the staff will be directed to
the planning commission. Within the
landscaped area trees shall be planted or
be existing at least every twenty (20) feet
and have a minimum of two (2) inches in
diameter when measured twelve (12)
inches from the ground at time of planting.
Where a developer demonstrates that this
4 requirement will constitute an undue
hardship, a landscaped area exclusive of
right-of-way may consist of a minimum of
twenty-five (25) feet. In those instances
only, a half -berm shall be constructed
which is a minimum of three (3) feet in
and also has a rear yard building setback
in excess of 40-feet.
The side yard is setback proposed Tor Lot
2B is in excess of the 30-foot side yard
setback. The building located on Lot 2A is
existing and has a side yard building
setback in excess of 30 feet.
Attempts will be made to incorporate
existing on -site trees and shrubbery into
the landscape scheme and plans at the
time of development of Lot 2B.
All landscaped areas will have sprinkler
systems installed.
All erosion controls of the City will be
followed.
Tree species planted will be consistent
with other species located in the area.
The front yard is indicated with a minimum
landscape area of 40-feet exclusive of the
right of way.
The landscaped area will contain organic
and/or man-made/organic features such
as a berm, brick wall or dense evergreen
plantings to screen the vehicular use areas
as typically required per the Highway 10
Design Overlay District.
0
FILE NO.: Z-4524-G (Cont.
height with tree plantings as required
herein; provided however, that this
provision may only be applied to a
maximum of twenty (20) percent of the
highway frontage affected in the plans
submitted.
Rear and side yards shall have a
landscaped buffer averaging a minimum of
twenty-five (25) feet from the property line.
Where such yards abut a street right-of-
way, a fifteen -foot landscaped strip shall
be required adjacent to land zoned office
and residential. A seven -foot landscaped
strip shall be required when adjacent to
lands zoned commercial.
Signage. Signage shall comply with the
provisions of Article X of Chapter 36 of the
Little Rock Code of Ordinances, except as
follows:
Commercial development signage.
Signage identifying the commercial
development shall not exceed ten (10) feet
in height and one hundred (100) square
feet in area. All signs that are ground -
mounted shall be of a monument type
design. These signs may be installed in
the landscaped area of the front and side
yards.
Commercial building signage. Each
se crate commercial building will be
p
allowed a single monument ground -
mounted sign located on the building site
or in the landscaped front yard of the
commercial development. The sign shall
be a maximum of six (6) feet in height and
seventy-two (72) square feet in area.
Curb cuts. Maximum, one (1) curb cut per
three hundred (300) feet and no curb cut
closer to an intersection than one hundred
(100) feet.
The side and rear yards shall have a
landscape strip averaging a minimum of
25-feet from the property line.
Building signage will comply with signage
allowed in Chapter 36 of the Little Rock
Code of Ordinances.
The development will utilize a commercial
development sign with a maximum height
of ten feet and a maximum sign area of
100 square feet to be shared between the
two users.
A single sign for each of the individual lots
will not be utilized.
No new curb cuts are proposed with the
development.
7
FILE NO.: Z-4524-G Cont.
Lighting. Parking lot lighting shall be
Lighting shall comply with the DOD
designed and located in such manner so
standards. Lighting will be directed to the
as not to disturb the scenic appearance
parking areas and not reflect into the
preserved in this corridor. Lighting should
adjacent neighborhoods.
be directed to the parking areas and not
reflected into the adjacent neighborhoods.
Building sites. The maximum number of
The site contains 2.9 acres and is
buildings per commercial development
proposed with two lots and a single
shall be measured both by minimum tract
building on each of the lots.
size and minimum frontage as follows:
One (1) building every two (2) acres.
Commercial developments and multiple
building sites. In the case of a commercial
development or other development
involving multiple building sites, whether
on one (1) or more platted lots, the above
described regulations shall apply to the
development as an entire tract rather than
to each platted lot. Developments of this
type shall be reviewed by the City through
a site plan review process which illustrates
compliance with this article
Property, due to topography, size, irregular
shapes or other constraints, such as
adjacent structures or features which
significantly affect visibility, and thus
cannot be developed without violating the
standards of this article shall be reviewed
through the planned unit development
(PUD) section of the zoning ordinance,
with the intent to devise a workable
development plan which is consistent with
the purpose and intent of the overlay
standards.
The request is to rezone the site from 0-2,
Office and Institutional District to POD to
allow the creation of lots less than the two
(2) acre typical minimum lot size
requirement.
Although the site plan does not fully comply with the typical Highway 10 Design
Overlay District standards, staff does not feel the area of non-compliance will
significantly impact the development or the corridor. The only variance from the
Overlay is to allow lots less than two (2) acres. The ordinance states there shall
be a minimum development tract size of not less than two (2) acres. The
development is proposed to create two lots containing 1.33 and 1.57 acres,
which are both less than the typical minimum standard. Lot 2A is developed with
an office building meeting all the landscaping and setback requirements and Lot
213 is proposed complying with all setback and landscaping requirements
typically imposed per the Overlay.
FILE NO.: Z-4524-G Cont.
Staff is supportive of the request. Staff does not feel the creation of office lots
with lot sizes less than the two acre typical ordinance standard per the Highway
10 Design Overlay District will significantly impact the development or the area.
In the general area around the Sam Peck/Cantrell Road intersection, there are
several smaller office buildings on tracts which are less than two (2) acres in
size. Staff believes it is appropriate to allow more dense development, utilizing
smaller lots, within established nodes, including the office/mixed node around
this intersection. The lots as proposed meet all other aspects of the Highway 10
Design Overlay District. To staff's knowledge there are no remaining outstanding
technical issues associated with the request.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (DECEMBER 18, 2008)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
There was no further discussion of the item. The chair entertained a motion of approval
of the item as recommended by staff. The motion carried by a vote of 6 ayes, 0 noes,
2 absent and 3 open positions.
9
December 18, 2008
ITEM NO.: 7
NAME: GCC Addition Lot 2 Short -form POD
LOCATION: Located at 13000 Cantrell Road
DEVELOPER:
JGS IV, Inc.
c/o Gregory Saad
3601 Spring Hill Business Park, Suite 200
Mobile, AL 36608
ENGINEER:
Development Consultants, Inc.
c/o Robert Brown
2200 North Rodney Parham Road, Suite 220
Little Rock, AR 72212
FILE NO.: Z-4
AREA: 2.90 acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
CURRENT ZONING: 0-2, Office and Institutional District
ALLOWED USES: Office and Institutional Uses
PROPOSED ZONING: POD
PROPOSED USE: 0-2, Office and Institutional District Uses —
Variation from the Highway 10 DOD to allow the creation of
lots with less than the typical 2-acre minimum lot size.
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The request is a rezoning to POD to allow the subdivision of an existing 2.9-acre
lot into two lots with lot areas less than the two -acre typical minimum requirement
per the Highway 10 Design Overlay [District. Proposed Lot 2A will contain
1.33 acres and proposed Lot 2B will contain 1.57 acres. Lot 2A contains an
existing 6,740 square foot office building and Lot 2B is proposed with a
8,000 square foot office building. The two lots are proposed to share a single
ground mounted monument sign with a maximum height of 10 feet and a
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: Z-454-G
maximum sign area of 100 square feet. No new drives are proposed from
Cantrell Road.
EXISTING CONDITIONS:
On the eastern portion of the lot there is an office building containing an
insurance agency and the western portion of the lot is wooded. The site is
accessed from an existing common access easement located along the eastern
perimeter and a driveway located on Cantrell Road. The area contains a number
of uses including office and retail uses. The Center at 10 is located south of this
site which is a mixed use development containing a multi -story office building, a
bank and retail. East of the site is a single story office building currently
operating as an abstract company and north of the site is a church.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
Ail property owners located within 200 feet of the site, all residents, who could be
identified, located within 300 feet of the site, the Pankey Community
Improvement District and the Coalition of West Little Rock Neighborhoods were
notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little bock Code and the Master Street Plan along the
west side of the private street from Highway 10. Sidewalk must be extended
along Cantrell Road to the western property line.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
3. Storm water detention ordinance applies to this property.
4. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
5. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project.
2
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-4524-G
F
Entergy: No comment received.
Center -Point Enerav: No comment received.
AT & T: No comment received.
Central Arkansas Water: No objection to plans for Lot 2A. For the development
of Lot 2B: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. A Capital Investment Charge based on
the size of connection(s) will apply to this project in addition to normal charges.
This fee will apply to all meter connections including any metered connections off
the private fire system. On -site private fire hydrant(s) will be required. Contact the
Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding
procedures for installation of the hydrant(s).
Fire Department: Place and install fire hydrants per code. Contact the Little
Rock Fire Department for additional information.
Count Planning: No comment.
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express
Route.
ISSUESITECHNICAL/DESIGN:
Planning Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Office for this property. The applicant has
applied for a rezoning from 0-2, Office and Institutional District to Planned Office
Development to allow the creation of two lots with lot sizes less than the typical
lot size required per the Highway 10 Design Overlay District.
The request does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is a Principal Arterial. The primary function of
a Principal Arterial is to serve through traffic and to connect major traffic
generators or activity centers within urbanized areas. Entrances and exits should
be limited to minimize negative effects of traffic and pedestrians on Cantrell Road
since it is a Principal Arterial. The street may require dedication of right-of-way
and may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
3
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: Z-4524-G
Neighborhood. Action Plan: The River Mountain Neighborhood Plan covers this
area, but the Plan does not address this issue.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. This application will be reviewed as an overall development plan. The
Highway 10 Overlay District requirements are applicable to each of the lots at
the time of development. A landscape plan stamped with the seal of a
registered landscape architect and an automatic irrigation system will be
required for each of the individual lots.
3. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 20, 2008)
Mr. Robert Brown of DCI and Mr. Todd Rice of Hathaway International were
present representing the owner. Staff presented an overview of the development
stating there were few outstanding issues associated with the request. Staff
stated they did not typically support the creation of lots with less than the
two -acre minimum lot size without a development plan. Staff stated Mr. Brown
had provided a site plan to include a building footprint, landscaping and parking
lot layout on the second lot.
Public Works comments were addressed. Staff stated the storm water detention
ordinance would apply to development of the site. Staff also stated sidewalks
with appropriate handicap ramps were required along the west side of the private
street from Highway 10.
Landscaping comments were addressed. Staff stated at the time of development
or redevelopment of either of the lots, a landscape plan stamped with the seal of
a registered landscape architect was required. Staff stated irrigation for each of
the lots was also required.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact these agencies for additional
information. There being no further issues for discussion, the Committee then
forwarded the item to the full Commission for final action.
51
December 18, 2008
SUBDIVISION
ITEM NO.: 7 Cont.
H. ANALYSIS:
FILE NO.: Z-4524-G
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the November 20, 2008, Subdivision Committee meeting. At the time of
future development or redevelopment of the property, a landscape plan stamped
with the seat of a registered landscape architect will be provided and each of the
lots will be irrigated to water landscaped areas. Sidewalks with appropriate
handicap ramps will also be installed.
The property is currently zoned 0-2, Office and Institutional District and is located
within the Highway 10 Design Overlay District. The site is an existing platted lot
containing 2.9-acres. The applicant is requesting to create two lots with lot sizes
less than the two -acre typical minimum requirement per the Highway 10 Design
Overlay District. Proposed Lot 2A will contain 1.33 acres and proposed Lot 2B
will contain 1.57 acres.
The applicant is requesting 0-2, Office and Institutional District uses as allowable
uses for the lots. Lot 2A contains an existing 6,740 square foot office building
and Lot 2B is proposed with a 8,000 square foot office building. Lot 2A contains
34 parking spaces and Lot 2B is proposed with 29 parking spaces. Based on the
typical ordinance standards for an office development, the parking proposed for
the individual lots is more than adequate to serve the lots.
The two lots are proposed to share a single monument sign with a maximum
height of 10 feet and a maximum sign area of 100 square feet. The signage
proposed is consistent with signage allowed per the Overlay. Building signage is
proposed consistent with signage typically allowed in office zones.
The office hours of operation are from 7 am to 5 pm Monday through Friday. The
hours of dumpster service are limited to daylight hours.
Per the Highway 10 Design Overlay District, parking lot lighting shall be designed
and located in such a manner so as not to disturb the scenic appearance
preserved in the corridor. Lighting should be directed to the parking areas and
not reflected into the adjacent neighborhoods. The note indicates site lighting will
comply with typical ordinance standards for the Highway 10 Design Overlay
District.
The site plan indicates building setbacks and landscaping per the typical
Highway 10 Design Overlay District standards. No new drives are proposed from
Cantrell Road. The site plan indicates the placement of a dumpster facility for
the new lot within the rear yard area.
5
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: Z-4524-G
The following chart is a summary of the Overlay requirements and the applicant's
proposal related to the typical ordinance requirements.
Highway 10 DOD Requirements:
Lot size. There shall be a minimum
development tract size of not less than two
(2) acres.
Front yard. All principal and accessory
buildings or structures are required to have
a one -hundred -foot building setback from
the property line abutting Highway 10.
Rear yard. Rear yard shall not be less
than forty (40) feet.
Side yard. Side yard shall not be less than
thirty (30) feet.
Landscaping treatment. Landscaped
areas shall attempt to incorporate existing
on -site trees and shrubbery into the
landscaping scheme and the plans shall
indicate such incorporation.
Landscaped areas shall have water
sprinkler systems to maintain plant
materials.
Erosion retardant vegetation shall be used
on all cuts and fills.
Tree species to be planted within this
corridor should be consistent with other
species present.
The Highway 10 frontage (front yard) shall
consist of a minimum of forty (40) feet of
landscaped area exclusive of right-of-way.
The landscaped area shall contain organic
and/or combined man-made/organic
features as berms, brick walls and dense
plantings such that vehicular use areas are
Applicant's proposal:
Lot 2A contains 1.33 acres
Lot 2B contains 1.57 acres
Variation from the Overlay Standard.
The building line is indicated in excess of
100-feet.
The building proposed for Lot 2B is set in
excess of the 40-foot rear yard setback.
The building located on Lot 2A is existing
and also has a rear yard building setback
in excess of 40-feet.
The side yard is setback proposed for Lot
2B is in excess of the 30-foot side yard
setback. The building located on Lot 2A is
existing and has a side yard building
setback in excess of 30 feet.
Attempts will be made to incorporate
existing on -site trees and shrubbery into
the landscape scheme and plans at the
time of development of Lot 2B.
All landscaped areas will have sprinkler
systems installed.
All erosion controls of the City will be
followed.
Tree species planted will be consistent
with other species located in the area.
The front yard is indicated with a minimum
landscape area of 40-feet exclusive of the
right of way.
The landscaped area will contain organic
and/or man-made/organic features such
as a berm, brick wall or dense evergreen
N
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.
screened when viewed from an elevation
of forty-two (42) inches above the
elevation of the adjacent street. Alternative
screening methods and designs must be
approved by the plans review specialist.
Appeals from the staff will be directed to
the planning commission. Within the
landscaped area trees shall be planted or
be existing at least every twenty (20) feet
and have a minimum of two (2) inches in
diameter when measured twelve (12)
inches from the ground at time of planting.
Where a developer demonstrates that this
requirement will constitute an undue
hardship, a landscaped area exclusive of
right-of-way may consist of a minimum of
twenty-five (25) feet. In those instances
only, a half -berm shall be constructed
which is a minimum of three (3) feet in
height with tree plantings as required
herein; provided however, that this
provision may only be applied to a
maximum of twenty (20) percent of the
highway frontage affected in the plans
submitted.
Rear and side yards shall have a
landscaped buffer averaging a minimum of
twenty-five (25) feet from the property line.
Where such yards abut a street right-of-
way, a fifteen -foot landscaped strip shall
be required adjacent to land zoned office
and residential. A seven -foot landscaped
strip shall be required when adjacent to
lands zoned commercial.
Signage. Signage shall comply with the
provisions of Article X of Chapter 36 of the
Little Rock Code of Ordinances, except as
follows:
Commercial development signage.
Signage identifying the commercial
development shall not exceed ten (10) feet
in height and one hundred (100) square
FILE NO.: Z-4524-G
plantings to screen the vehicular use areas
as typically required per the Highway 10
Design Overlay District.
The side and rear yards shall have a
landscape strip averaging a minimum of
25-feet from the property line.
Building signage will comply with signage
allowed in Chapter 36 of the Little Rock
Code of Ordinances.
The development will utilize a commercial
development sign with a maximum height
of ten feet and a maximum sign area of
100 square feet to be shared between the
7
December 18, 2008
SUBDIVISION
ITEM NO.: 7
feet in area. All signs that are ground- two users.
mounted shall be of a monument type
design. These signs may be installed in
the landscaped area of the front and side
yards.
Commercial building signage. Each
separate commercial building will be
allowed a single monument ground -
mounted sign located on the building site
or in the landscaped front yard of the
commercial development. The sign shall
be a maximum of six (6) feet in height and
seventy-two (72) square feet in area.
Curb cuts. Maximum, one (1) curb cut per
three hundred (300) feet and no curb cut
closer to an intersection than one hundred
(100) feet.
Lighting. Parking lot lighting shall be
designed and located in such manner so
as not to disturb the scenic appearance
preserved in this corridor. Lighting should
be directed to the parking areas and not
_reflected into the adjacent neighborhoods.
Building sites. The maximum number of
buildings per commercial development
shall be measured both by minimum tract
size and minimum frontage as follows:
One (1) building every two (2) acres.
Commercial developments and multiple
building sites. In the case of a commercial
development or other development
involving multiple building sites, whether
on one (1) or more platted lots, the above
described regulations shall apply to the
development as an entire tract rather than
to each platted lot. Developments of this
type shall be reviewed by the City through
a site plan review process which illustrates
compliance with this article
FILE NO.: Z-4524-G
A single sign for each of the individual lots
will not be utilized.
No new curb cuts are proposed with the
development.
Lighting shall comply with the DOD
standards. Lighting will be directed to the
parking areas and not reflect into the
adjacent neighborhoods.
The site contains 2.9 acres and is
proposed with two lots and a single
building on each of the lots.
W
December 18, 2008
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-4524-G
Property, due to topography, size, irregular
shapes or other constraints, such as
adjacent structures or features which
significantly affect visibility, and thus
cannot be developed without violating the
standards of this article shall be reviewed
through the planned unit development
(PUD) section of the zoning ordinance,
with the intent to devise a workable
development plan which is consistent with
the purpose and intent of the overlay
standards.
The request is to rezone the site from 0-2,
Office and Institutional District to POD to
allow the creation of lots less than the two
(2) acre typical minimum lot size
requirement.
Although the site plan does not fully comply with the typical Highway 10 Design
Overlay District standards, staff does not feel the area of non-compliance will
significantly impact the development or the corridor. The only variance from the
Overlay is to allow lots less than two (2) acres. The ordinance states there shall
be a minimum development tract size of not less than two (2) acres. The
development is proposed to create two lots containing 1.33 and 1.57 acres,
which are both less than the typical minimum standard. Lot 2A is developed with
an office building meeting all the landscaping and setback requirements and Lot
26 is proposed complying with all setback and landscaping requirements
typically imposed per the Overlay.
Staff is supportive of the request. Staff does not feel the creation of office lots
with lot sizes less than the two acre typical ordinance standard per the Highway
10 Design Overlay District will significantly impact the development or the area.
In the general area around the Sam Peck/Cantrell Road intersection, there are
several smaller office buildings on tracts which are less than two (2) acres in
size. Staff believes it is appropriate to allow more dense development, utilizing
smaller lots, within established nodes, including the office/mixed node around
this intersection. The lots as proposed meet all other aspects of the Highway 10
Design Overlay District. To staff's knowledge there are no remaining outstanding
technical issues associated with the request.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
9
December 18, 2008
UBDiVISION
ITEM NO.: 7 (Cont.
PLANNING COMMISSION ACTION:
FILE NO.: Z-4524-G
(DECEMBER 18, 2008)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
There was no further discussion of the item. The chair entertained a motion of approval
of the item as recommended by staff. The motion carried by a vote of 6 ayes, 0 noes,
2 absent and 3 open positions.
sift
ITEM NO.: 7. Z-4524-G
NAME: GCC Addition Lot 2 Short -form POD
LOCATION: located at 13000 Cantrell Road
Planning Staff Comments-
1 . Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than December 3, 2008. The Office of Planning and
Development must receive the proof of notice no later than December 12, 2008.
2. The property is located within the Highway 10 Design Overlay District, which
typically requires a minimum lot size of two (2) acres or a minimum of two (2) acre
building sites.
3. Historically staff has not supported the creation of lots with less than the two acre
minimum as established by the Highway 10 Design Overlay District without the
creation of a development plan for the proposed lots.
Variance/Waivers: None requested.
Public Works Conditions:
1. Sidewalks with appropriate handicap ramps are required in accordance with Section
31-175 of the Little Rock Code and the Master Street Plan along the west side of the
private street from Highway 10. Sidewalk should be extended along Highway 10 to
the western property line.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
3. Storm water detention ordinance applies to this property.
4. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
5. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project.
Enter : No comment received.
Center -Point Ener : No comment received.
AT & T: No comment received.
Item # 7.
Central Arkansas Water: No objection to plans for Lot 2A. For the development of
Lot 213: All Central Arkansas Water requirements in effect at the time of request for
water service must be met. A Capital Investment Charge based on the size of
connection(s) will apply to this project in addition to normal charges. This fee will apply
to all meter connections including any metered connections off the private fire system.
On -site private fire hydrant(s) will be required. Contact the Little Rock Fire Department
to obtain information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
Fire Department: Place and install fire hydrants per code. Contact the Little Rock
Fire Department for additional information.
County Planning: No comment.
CAT& The site is located on CATA Bus Route #25 — the Highway 10 Express
Route.
Planning Division: This request is located in the River Mountain Planning District. The
Land Use Plan shows Office for this property. The applicant has applied for a rezoning
from 0-2, Office and Institutional District to Planned Office Development to allow the
creation of two lots.
The request does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is a Principal Arterial. The primary function of a
Principal Arterial is to serve through traffic and to connect major traffic generators or
activity centers within urbanized areas. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Cantrell Road since it is a
Principal Arterial. The street may require dedication of right-of-way and may require
street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: The River Mountain Neighborhood Plan covers this area,
but the Plan does not address this issue.
Landscape:
1. The site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. This application will be reviewed as an overall site plan and thus the Highway 10
Overlay District requirements are applicable to each of the lots including the
requirement of a landscape plan stamp with the seal of a registered landscape
architect and an automatic irrigation system.
3. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Item # 7.
_Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Monday, December 1, 2008.
Item # 7.