Loading...
HomeMy WebLinkAboutZ-4524-D Staff AnalysisJuly 13, 1993 ITEM NO.: 12 FILE NO.: Z-5424-D NAME: GCC ADDITION, LOT 2 - SITE PLAN REVIEW LOCATION: The north side of Highway 10 at the Sam Peck Road intersection DEVELOPER: ENGINEER: GRACE COMMUNITY CHURCH WHITE-DATERS & ASSOCIATES, INC. 8201 Cantrell Road 401 Victory St. Little Rock, AR 72207 Little Rock, AR 72201 225-0843 374-1666 AREA: 2.6075 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: None ZONING: 0-2 PROPOSED USE: Office PLANNING DISTRICT: 1 CENSUS TRACT: 42.05 VARIANCES REQUESTED: None TATEMENT OF PROPOSAL: Grace Community Church is proposing the development of one of the out -parcels of the church's 3 lot subdivision. The church proposes to gain approval of a one-story office building for use as an insurance company claims office in order to consummate a sale of the parcel. On -site parking and drives are proposed. Access is to be gained both by way of the private entrance boulevard which is to serve all three of the subdivision's lots, and by a drive at the west edge of the property directly onto Highway 10. A. PROPOSAL1RE, UCH EST: Review and approval by the Planning Commission is requested of the site plan submitted by Grace Community Church for the west out -parcel. Approval is sought in order to sell the property for use as an insurance company claims office. A one-story office building with a drive-thru for claims handling, and on -site parking and drives, is proposed. Access is requested by way of the common private drive at the center of the subdivision, and by a drive at the west side of the property directly onto Highway 10. B. EXISTING CONDITIONS: The site is presently undeveloped. Partial clearing has occurred in the past. The site is now zoned 0-2, with July 13, 1993 BDIVISION ITEM NO.: 12 Continued FILE NO.: V.-5424-D another 0-2 out -parcel of the development to the east. The remainder of the Grace Community Church property to the north is zoned MF-12 and it is planned for the church to construct its new facility on that land. To the west is R-2 zoned property. C. ENGINEERZNGIUTILITY COMMENTS: Engineering indicates that the developer is to construct a sidewalk along the Highway 10 frontage. The Engineering Division reports that the western -most drive should intersect Highway 10 at a 90 degree angle. Water Works reports that a pro-rata front footage charge of $15.00 per foot is applicable. Wastewater Utility reports that a sewer main extension, with an easement, is required. Southwestern Bell Telephone Co. indicates that an easement will be required. ARKLA and the Fire Department returned the submittal indicating that it was approved. D. ISSUES LEGAL TECHNICAL DESIGN: The site plan should show the areas devoted to landscaping. The proposed perimeter treatments should be shown, indicating screening, buffers, and landscaping. A descriptive narrative is to be supplied indicating the means anticipated to protect and maintain the buffers. A topographic cross-section map of the site is required. E. ANALYSIS• It is anticipated that the deficiencies which remain in the site plan exhibits can be remedied. The use made of the site and the planning for the use appear acceptable. F. STAFF RECOMMENDATIONS: Staff recommends approval, subject to the site plan being completed in conformance to Subdivision Ordinance standards. SUBDIVISION COMMITTEE COMMENT: (June 24, 1993) Mr. Joe White, the engineer for the project, was present. Staff presented the item; Mr. White reviewed the plan and the proposal with the Committee. The Committee commented on the deficiencies 2 July 13, 1993 S BDIVISIO ITEM NO.: 12 Contznued FILE NO.: Z-5424-D HDIVISION COMMITTEE COMMENT: (June 24, 1993) Mr. Joe White, the engineer for the project, was present. Staff presented the item; Mr. white reviewed the plan and the proposal with the Committee. The Committee commented on the deficiencies noted in the discussion outline. Mr. white indicated that he would correct the deficiencies and complete the documents prior to the Planning Commission hearing. The Committee forwarded the site plan to the Commission for review. PLANNING COMMISSION ACTION: (JULY 13, 1993) This item was included on the Consent Agenda for approval and was approved without discussion in the vote to approve the Consent Agenda. The vote was 10 ayes and no nays. 3