HomeMy WebLinkAboutZ-4524-B Staff AnalysisJune 1, 1993
ITEM NO.: B FILE NO.: Z-4524-B
NAME:
LOCATION:
OWNER/APPLICANT•
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location
Grace Community Church -
Conditional Use Permit
Highway 10 at Sam Peck Road
(north side)
Resolution Trust Corporation/Grace
Community Church
The applicant is requesting a
conditional use permit to allow for
the phased construction of a church
and related facilities on 15 acres
of this MF-12 zoned, 22 acre site.
At a later date, the applicant will
come back to the Commission with a
request to rezone and replat the
remaining 7 acres.
This site is located on the north side of Highway 10 at its
intersection with Sam Peck Road.
2. Compatibility with Neighborhood
The site is located on a principal arterial in a
neighborhood of mixed, transitional type zoning.
Last year, the Planning Commission approved conditional use
permits to allow two churches to be located approximately
700 feet east of this site, one on the north side of Highway
10 and one on the south side.
Directly west and north of this site is River Mountain Park,
which provides a substantial buffer for the residential
properties in the vicinity.
South of Highway 10 is a large multifamily development and
two large athletic clubs/associations.
The proposed use of this property as a church, with
attention given to buffering the residentially zoned
property to the east, appears to be compatible with the
neighborhood and staff is supportive of the proposal.
June 1, 1993
SUBDIVISION
ITEM NO.: B (Continued) FILE NO.: Z-4524-B
3. On -Site Drives and Parking
The applicant is proposing a substantial parking area which
will be built in phases to coincide with the development of
the church. The final seating capacity of the sanctuary
will be 1,500, requiring 375 parking spaces. The completed
parking lot will have 674± spaces, exceeding the ordinance
requirement.
4. Screening and Buffers
Compliance with the City's landscape and buffer ordinances
and the Highway 10 Overlay Ordinance is required. The
applicant is proposing to retain a large wooded area along
the north perimeter and in the northeast corner of the site.
5. City Engineer Comments
Eliminate the two driveways on the west and east and provide
one common access in the approximate center for church and
office subdivision. Construct sidewalk along Highway 10.
Stormwater Detention and Excavation Ordinances apply.
6. Utility Comments
Little Rock Municipal Water Works states "a pro rata front
footage charge of $15/front foot applies. On -site fire
protection will be required. A main extension may be
required to serve outlots, unless the property has frontage
on the 16 inch main on the west. It also has a $15/front
foot pro rata front footage charge."
Little Rock Wastewater utilities states "sewer main
extension required with easements. Sewer must be extended
to each separate parcel of land."
Southwestern Bell Telephone requires a 5 foot easement along
the west, north and a portion of the east perimeter.
7. Analysis
The issue before the Planning Commission is a conditional
use permit requested to allow for the development of a
church on 15 acres of a 22 acre, MF-12 zoned site.
The applicant will be filing an application to subdivide the
site and rezone the remaining 7 acres at a later date. Any
endorsement of this conditional use permit application is
not an endorsement of the replatting or rezoning.
2
June 1, 1993
SUBDIVISION
ITEM NO.: B (continued) FILE NO_: Z-4524-B
The use of this property as a church is compatible with the
other uses in the immediate vicinity and with adherence to
the Highway 10 Overlay standards and resolution of the
various concerns noted above, staff is supportive of the
proposal.
8. Staff Recommendation
Staff recommends approval of this application, subject to
compliance with City Engineer comments, Utility comments,
landscape and buffer ordinances and Highway 10 Overlay
Ordinance.
SUBDIVISION COMMITTEE COMMENT: (APRIL 1, 1993)
The applicant was not present. Staff presented the item and
outlined comments submitted by the City Engineer and the utility
companies. Other unresolved items of concern noted by staff are
as follows:
1. Property has not been replatted. An application for
replatting has been filed, but will not be heard until
June 1, 1993.
2. Submit a lighting plan for the parking lot and drives.
3. Submit, in writing, a detailed outline of the proposed
phasing plan of the development and tie it to the phasing of
the parking.
4. The east/west drive paralleling Highway 10 intrudes into the
required 40 foot front buffer.
5. The north/south drives and future parking lot intrude into
the required 25 foot buffers.
6. All required landscape areas must have a water sprinkler
system.
7. Screening is required along perimeters adjacent to
residentially zoned properties.
A discussion then followed concerning the City Engineer's
requirement that the entire site be limited to one access on
Highway 10. It was determined that the conditional use permit
could be reviewed by the Planning Commission and that the
question of access to Highway 10 could be resolved at the time
the application to replat the property is reviewed.
3
June 1, 1993
SUBDIVISION
ITEM O.• B n inued FILE NO.: Z-4 24-B
The Committee then forwarded this item to the full Commission for
final resolution.
PLANNING r.QMMISSION ACTION: (APRIL 20, 1993)
The applicant, Olan Asbury, was present.
Dana Carney, of the Planning staff, informed the Commission that
the applicant was requesting a deferral to the June 1, 1993
Planning Commission meeting, but had not submitted the request,
in writing, five days prior to this day's meeting.
Chairman Walker asked if there was any one present in opposition.
There were none.
This item was placed on the Consent Agenda and approved for
deferral to the June 1, 1993 Planning Commission meeting. The
vote to defer was 11 ayes, 0 noes and 0 absent.
SUBDIVISION COMMITTEE COMMENT:
(MAY 13, 1993)
The applicant was not present. Staff presented the revised site
plan and outlined several unresolved concerns as follow:
1. Provide a cross section through the site perpendicular to
the contour (northeast to southwest).
2. Indicate height of all proposed structures; MF-12 height
limit is 35 feet.
3. Provide greater detail on proposed amphitheater.
a. Open or enclosed
b. Lighting
C. preliminary grading plan
4. Submit a lighting plan for the parking lot and drives.
5. Submit, in writing, a detailed outline of the proposed
phasing plan of the development and tie it to the phasing of
the parking.
6. Will there be any day care or school? Indicate in the above
mentioned detailed outline.
7. Comply with Highway 10 Overlay standards.
8. One access point to Highway 10 only; eliminate the access
shown at the southwest corner.
4
June 1, 1993
SUBDIVISION
ITEM NO.: B (Continued) FILE NO.: Z-4524-B
9. Construct sidewalk on Highway 10.
10. Comply with utility comments.
11. Provide a landscape plan for the divided access.
A discussion then followed concerning the City Engineer's
requirement that the entire site be limited to one access point
on Highway 10. Tad Borkowski, of the City Engineer's Office,
stated that the applicant should meet with the City Traffic
Engineer to resolve this matter.
It was pointed out, by a committee member, that greater detail is
needed on the proposed amphitheater due to its proximity to the
north property line and its location on the hillside.
The committee then forwarded this item to the full Commission for
final resolution.
PLANNING commis ION ACTION: (DONE 1, 1993)
The applicant, Olan Asbury, was present. There were no objectors
present. Dana Carney, of the Planning staff, presented the item
and informed the Commission that the applicant had submitted a
letter and a revised site plan which addressed all outstanding
staff concerns.
The letter and site plan outlined the phased development of the
project. Final development will be designed around a worship
center which will seat 1,250. Parking lot development is tied to
the phasing plan in such a way as to exceed ordinance
requirement. The final number of parking spaces is 600.
The other outstanding issues of concern, which the applicant
addressed in his letter, are as follow:
1. The height limit of all structures will be 35 feet.
2. The amphitheater is designed to be an open, grassy, sloping
area utilizing the existing contours as much as possible.
3. All outdoor lighting, parking lot and amphitheater, is to be
low level and directional.
4. There is no proposed day care or school.
5
June 1, 1993
SUBDIVISION
YTEM NO.: S Continued FILE NO.: -4 24-B
The Commission was informed that the applicant had addressed all
other issues to the satisfaction of staff. Staff is recommending
approval of this application subject to compliance with the City
Engineer and utility Comments and compliance with the City's
Landscaping, Buffer and Highway 10 Overlay Ordinances.
It was determined that there were no outstanding unresolved
issues and this item was placed on the Consent Agenda for
approval.
The vote was 9 ayes, 0 noes and 2 absent. The application was
approved as recommended by staff.
6