HomeMy WebLinkAboutZ-4524 Staff AnalysisNovember 12, 1985
SUBDIVISIONS
Item No. 8 - File No. 610
NAME: Highway 10 Apartments
"Long -Form PRD" (Z-4524)
LOCATION: North of the intersection of
Highway 10 at Sam Peck Road
ren. seer nncn . �D!'LiTTT.'.('T
Steve Clary/Melvin Bell Brooks -Jackson Architect, Inc.
525 Louisiana 2311 Biscayne Drive, Suite•320
Little Rock, AR 72201 Little Rock, AR 72201
376-9071 227-8700
Area: 22.35 acres No. of Lots: 1. Ft. New St.: 0
ZONING: "R-2"
PROPOSED USES: Multifamily
PLANNING DISTRICT: Highway 1
CENSUS TRACT: 42.03
VARIANCE REQUESTED:
A. DEVELOPMENT OBJECTIVE:
1.
To provide a
high quality multifamily complex with
a variety of
living units and
building compatible
with the surrounding
area.
B. PROPOSAL:
1.
The construction
of 264 units
on 22.35 acres.
2.
PROJECT DATA:
UNIT TYPE
SIZE
UNIT NO.
TOTAL AREA
1BR/lBA
675
32
21,600
1BR/lBA
825
56
46,200
2BR/l 3/4BA
925
104
96,200
2BR/2BA
1025
48
49,200
2BR/2BA
1125
24
27,000
Clubhouse
10,000
Total
264
250,200
November 12, 1985
SUBDIVISIONS
Item No. 8 - Continued
3. Total parking .........396 spaces.
4. Landscaping will exceed requirements.
5. Development schedule is to begin construction in
January of 1986 and to be completed in
approximately one year.
6. The dwelling units will be leased.with tenant
rights to all common areas including amenities.
C. ENGINEERING COMMENTS:
1. Coordinate main access alignment with
Sam Peck Road with the Traffic engineer
and the Coyne Subdivision Engineer (Sam Davis).
2. Highway 10 in -lieu contributions for street
improvement.
3. Provide public turnaround adjoining the
security gate.
4. Security gate entrance west of main entrance -
if not guarded or card system, use fire department
crash gate.
- If guarded or card system, provide more stacking
length out of right-of-way
TRAFFIC ENGINEER'S GENERAL COMMENT:
Appears to be insufficient parking around the
clubhouse.
D. ANALYSIS:
Staff is mainly concerned about density and design.
It is felt that the structural density is
inappropriate in the areas of higher elevations. The
project is dense in areas of difficult terrain and
there is an excessive amount of pavement. The
applicant is asked to get Fire Department approval
on the grades of drives, some appear to be 26 to 28
percent. Also, provide a public turnaround or
crossover due to the location of the security house.
November 12, 1985
SUBDIVISIONS
Item No. 8 - Continued
E. STAFF RECOMMENDATION:
Deferral until issues are addressed.
SUBDIVISION COMMITTEE REVIEW:
The applicant agreed to provide staff with a revised plan
addressing its comments and work with the Traffic Engineer
on intersections.
PLANNING COMMISSION ACTION:
The applicant was present. A revised plan was submitted
which addressed the issues raised by the staff.
Members present from the neighborhood included
Mrs. Jannette Straub of The Walton Heights Property Owners
Association and Mr. David Groon, a resident of Highway 10.
They stated concerns relative to the use of the property.
A motion for approval was made and passed, subject to: (1)
sewer authorization, (2) submission of a one -lot final plat,
(3) conformance with Traffic Engineer's comments. The vote
8 ayes, 0 noes, 1 absent and 2 abstentions.
November 12, 1985
SUBDIVISIONS
Item No. 8 - File No. 610
NAME: Highway 10 Apartments
"Long -Form PRD" (Z-4524)
LOCATION• North of the intersection of
Highway 10 at Sam Peck Road
APrRTTFCT
Steve Clary/Melvin Bell Brooks -Jackson Architect, Inc.
525 Louisiana 2311 Biscayne Drive, Suite•320
Little Rock, AR 72201 Little Rock, AR 72201
376-9071 227-8700
Area: 22.35 acres No. of Lots: 1. Ft. New St.: 0
ZONING: "R-2"
PROPOSED USES: Multifamily
PLANNING DISTRICT: Highway 1
CENSUS TRACT: 42.03
VARIANCE REQUESTED:
A. DEVELOPMENT OBJECTIVE:
1. To provide a high quality multifamily complex
with
a variety of living
units and
building compatible
with the surrounding
area.
B. PROPOSAL:
1. The construction of
264 units
on 22.35 acres.
2. PROJECT DATA:
1 UNIT TYPE SIZE UNIT NO.
TOTAL AREA
1BR/lBA 675
32
21,600
1BR/lBA 825
56
46,200
/
2BR/1 3/4BA 925
104
96,200
2BR/2BA 1025
48
49,200
2BR/2BA 1125
24
27,000
Clubhouse
10,000
Total
264
250,200
November 12, 1985
SUBDIVISIONS
Item No. 8 - Continued
3. Total parking .........396 space-s.
4. Landscaping will exceed requirements.
5. Development schedule is to begin construction in
January of 1986 and to be completed in
approximately one year.
6. The dwelling units will be leased with tenant
rights to all common areas including amenities.
C. ENGINEERING COMMENTS:
1. Coordinate main access alignment with
Sam Peck Road with the Traffic enginner
and the Coyne Subdivision Engineer (Sam Davis).
2. Highway 10 in -lieu contributions for street
improvement.
3. Provide public turnaround adjoining the
security gate.
4. Security gate entrance west of main entrance if not guarded or card system, use fire department
crash gate.
- If guarded or card system, provide more stacking
length out of right-of-way
TRAFFIC ENGINEER'S GENERAL COMMENT:
Appears to be insufficient parking around the
clubhouse.
D. ANALYSIS:
Staff is mainly concerned about density and design.
It is felt that the structural density is
inappropriate in the areas of higher elevations. The
project is dense in areas of difficult terrain and
there is an excessive amount of pavement. The
applicant is asked to get Fire Department approval
on the grades of drives, some appear to be 26 to 28
percent. Also, provide a public turnaround or
crossover due to the location of the security house.
November 12, 1985
SUBDIVISIONS
Item No. 8 - Continued
E. STAFF RECOMMENDATION:
Deferral until issues are addressed.
SUBDIVISION COMMITTEE REVIEW:
The applicant agreed to provide staff with a revised plan
addressing its comments and work with the Traffic Engineer
on intersections.
PLANNING COMMISSION ACTION:
The applicant was present. A revised plan was submitted
which addressed the issues raised by the staff.
Members present from the neighborhood included
Mrs. Jannette Straub of The Walton Heights Property Owners
Association and Mr. David Groon, a resident of Highway 10.
They stated concerns relative to the use of the property.
A motion for approval was made and passed, subject to: (1)
sewer authorization, (2) submission of a one -lot final plat,
(3) conformance with Traffic Engineer's comments. The vote
8 ayes, 0 noes, 1 absent and 2 abstentions.
1
1. Name: Highway 10 Apartments "Long -Form PRD" (Z-4524)
2. Location: North of the intersection of Highway 10 at
Sam Peck Road
3. Applicant: Steve Clary/Melvin Bell
4. Existinq Use: Vacant
5. Proposed Use: Apartments
6. Staff Recommendation:
Approval of the revised plan. Initially, staff was
concerned about the density and design proposed at
higher elevations and Fire Department approval on
grades that appeared excessive. Two persons from the
neighborhood were present and expressed concerns
relative to use.
7. Planning Commission Recommendation:
Approval of the revised plan, subject to: (1)
sewer authorization; (2) submission of a one -lot final
plat and (3) conformance with Traffic's request. The
vote was 8 ayes, 0 noes, 1 absent and 2 abstentions.
NAME: Highway 10 Apartments
"Long -Form PRD" (Z-4524)
LOCATION• North of the intersection of
Highway 10 at Sam Peck Road
aPrT4TTRrT
Steve Clary/Melvin Bell Brooks -Jackson Architect, Inc.
525 Louisiana 2311 Biscayne Drive, Suite 320
Little Rock, AR 72201 Little Rock, AR 72201
376-9071 227-8700
Area: 22.35 acres No. of Lots:
ZONING: "R-2"
PROPOSED USES: Multifamily
PLANNING DISTRICT: Highway 1
CENSUS TRACT: 42.03
VARIANCE REQUESTED:
A. DEVELOPMENT OBJECTIVE:
1 Ft. New St.: 0
1. To provide a high quality multifamily complex with
a variety of living units and building compatible
with the surrounding area.
B. PROPOSAL: .
The construction of 264 units on 22.35 acres.
rr r%_r n 1nM TT TT .
1BR/lBA
1BR/lBA
2BR/l 3/4BA
2BR/2BA
2BR/2BA
Clubhouse
Total
SIZE
UNIT NO.
TOTAL AREA
675
32
21,600
825
56
46,200
925
104
96,200 _
1025
48
49,200
1125
24
27,000
10,000
264
250,200
Z-4524 Continued
3. Total parking .........396 spaces.
4. Landscaping will exceed requirements.
5. Development schedule is to begin construction in
January of 1986 and to be completed in
approximately one year.
6. The dwelling units will be leased with tenant
rights to all common areas including amenities.
C. ENGINEERING COMMENTS:
1. Coordinate main access alignment with
Sam Peck Road with the Traffic enginner
and the Coyne Subdivision Engineer (Sam Davis).
2. Highway 10 in -lieu contributions for street
improvement. .4
3. Provide public turnaround adjoining the
security gate.
4. Security gate entrance west of main entrance -
if not guarded or card system, use fire department
crash gate.
- If guarded or card system, provide more stacking
length out of right-of-way
TRAFFIC ENGINEER'S GENERAL COMMENT:
Appears to be insufficient parking around the
clubhouse.
D. ANALYSIS:
Staff is mainly concerned about density and design.
It is felt that the structural density is
inappropriate in the areas of higher elevations. The
project is dense in areas of difficult terrain and
there is an excessive amount of pavement. The
applicant is asked to get Fire Department approval
on the grades of drives, some appear to be 26 to 28
percent. Also, provide a public turnaround or
crossover due to the location of the security house.
Z-4524 Continued
3. Total parking .........396 spaces.
4. Landscaping will exceed requirements.
5. Development schedule is to begin construction in
January of 1986 and to be completed in
approximately one year.
6. The dwelling units will be leased with tenant
rights to all common areas including amenities.
C. ENGINEERING COMMENTS:
1. Coordinate main access alignment with
Sam Peck Road with the Traffic enginner
and the Coyne Subdivision Engineer (Sam Davis).
2. Highway 10 in -lieu contributions for street
improvement. 11
3. Provide public turnaround adjoining the
security gate.
4. Security gate entrance west of main entrance -
if not guarded or card system, use fire department
crash gate.
- If guarded or card system, provide more stacking
length out of right-of-way
TRAFFIC ENGINEER'S GENERAL COMMENT:
Appears to be insufficient parking around the
clubhouse.
D. ANALYSIS:
Staff is mainly concerned about density and design.
It is felt that the structural density is
inappropriate in the areas of higher elevations. The
project is dense in areas of difficult terrain and
there is an excessive amount of pavement. The
applicant is asked to get Fire Department approval
on the grades of drives, some appear to be 26 to 28
percent. Also, provide a public turnaround or
crossover due to the location of the security house.
Z-4524 Continued
E. STAFF RECOMMENDATION:
Deferral until issues are addressed.
SUBDIVISION COMMITTEE REVIEW:
The applicant agreed to provide staff with a revised plan
addressing its comments and work with the Traffic Engineer
on intersections.
PLANNING COMMISSION ACTION:
The applicant was present. A revised plan was submitted
which addressed the issues raised by the staff.
Members present from the neighborhood included
Mrs. Jannette Straub of The Walton Heights Property Owners
Association and Mr. David Groo'n, a resident of Highway 10.
They stated concerns relative to the use of the property.
A motion for approval was made and passed, subject to: (1)
sewer authorization, (2) submission of a one -lot final plat,
(3) conformance with Traffic Engineer's comments: The vote
8 ayes, 0 noes, 1 absent and 2 abstentions.