Loading...
HomeMy WebLinkAboutZ-4513-A Staff AnalysisOctober 25, 1999 Item No.: 1 File No. Owner: Address: Description: Zoned: Variance Requested: Justification: Present Use of Property: Proposed Use of Property : Staff Report: A. Public Works Issues: Z-4513-A Choctaw, Inc. 1300 Bond Street Long Legal I-3 Variances are requested from the area and building height provisions of Section 36-321 to permit new construction on the industrial site. Applicant's Statement: The applicant's justification is presented in the attached letters. Concrete pipe manufacturing Concrete pipe manufacturing 1.East 13t' Street is a commercial street. Dedication of right-of-way to 30 feet from centerline will be required. With Building Permit: 2. Provide design of streets conforming to "MSP" (Master Street Plan). Construct one-half street improvements to these streets with planned development. (Bond Street and East 13th Street) 3. Plans of all work in right-of-way shall be submitted for approval prior to start of work. 4. Stormwater detention ordinance applies to this property. 5. A grading permit and development permit for special flood hazard area is required prior to construction. 6.Driveways shall conform to Sec. 31-210 or Ordinance 18,03-1. 7. Easements shown for proposed storm drainage are required. October 25, 1999 Item No.: 1 (Cont.) 7.If doing any street cuts or curb If doing any work in right-of-way permit. Contact Derrick Bergfeld B. Staff Analvsis: cuts, obtain permits. obtain barricade at 340-4854. Choctaw, Inc., a pipe manufacturing and sales company, occupies the I-8 zoned, 12+ acre tract located at 1300 Bond Street. Choctaw has proposed an expansion project that will result in the removal of two older buildings and the phased construction of a new facility which will allow for more efficient concrete pipe production. Phase I of the new facility has a tentative finished construction date of April, 2000. Phase II will be built at a later date yet to be determined. Aspects of the Phase I construction generate the need for minor setback and height variances. The I-3 district requires a side yard setback of 30 feet. A small portion of the Phase I building and the material hoppers associated with that building will have a side yard setback of 6 feet to 17± feet. The material hopper will be 65 feet tall. The I-3 district has a height restriction of 60 feet. Staff is supportive of the requested variances. The minor height variance of 5 feet for the material hoppers is negligible on the 12+ acre site. The proposed height is not out of character with other development in this heavy industrial area. The reduced side yard setback for a small portion of the building and the material hoppers should have no impact on nearby properties. A railroad spur is adjacent to the site, separating this property from the property to the west. The property beyond the railroad spur is occupied by Golden Eagle, a large beer distribution company. Section 36-321 states that it is appropriate to adjust side yard setbacks to accommodate those tracts of land provided with access to rail service. The vast majority of the site is unpaved and will remain so to accommodate material storage and heavy equipment traffic. The area nearest the office building, at the northeast corner of the site, is paved and provides adequate area for the required parking. An upgrade in landscaping is required. The site is zoned I-3, heavy industrial and is surrounded by railroad spurs and other industrial uses. Any required upgrade in landscaping should only be placed on the 13t' Street perimeter, as placement anywhere else is not feasible or of any benefit. Staff suggests that a perimeter landscape strip be planted along the 13t' Street (north) E October 25, 1999 Item No.: 1 (Cont.) perimeter, with appropriate trees and shrubbery to provide screening of the site. C. Staff Recommendation: Staff recommends approval of the requested side yard setback and building height variances subject to compliance with the following conditions: 1. Compliance with the phased development plan for removal of existing buildings and construction of the new facility. 2. Compliance with Public Works Comments including any variance or waiver of those requirements as may be granted by the Board of Directors. 3. Installation of a street side perimeter landscape strip on the 13t' Street (north) perimeter with placement of trees and shrubbery appropriate to provide screening of the site from the public right-of-way. 4. Relocation of the 6" sewer line and the 12" CMP located underneath the proposed new building. BOARD OF ADJUSTMENT: (OCTOBER 25, 1999). The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the conditions outlined in the " Staff Recommendation" above. The applicant offered no additional comments. The item was placed on the Consent Agenda and approved as recommended by staff, including all conditions. The vote was 4 ayes, 0 noes, 0 absent and 1 abstaining (Ruck). 3