HomeMy WebLinkAboutZ-4513-A Map 2/ NW Corner SE 1/4 NW 1/4
Section 12, T—lN. R-12W
SS MH
Elv 253.23
Invert 248.63
Elv 251.(
SS MH
Elv 253.15
Invert 247.55 —
Building
PROPERTY LINE
1
SETBACK REQUIREMENT
—PROPERTY LINE
1H Elv 253.54 FI 18" Rcp
t 520.39 `Elv 251.34
v 250.06 PP
24" Rcp 'e
Rcp Ditch on E
7v 250.42 Tracks
v 251.53
Baseline poi t
Elv 256.12 �
Existing
Aetal Building
0
P
1
Asphalt
B
o>
� FN
etal 536,187.87 SQ. FT I'll, oP SCALE: 1" = 50'
ae OR 50 25 0 50 100 150
12.309 ACf
x
0
a
a Existing
PROPOSED v Storm Drain
c Elv 253.70
PHASE 1 = Invert 251.40
BUILDING 0
m xisting
V) Metal
Trailor
1g
k ,q lot Existin
x 5 ,_�Tp �a t Loading
w (.' Existing Metal Building Dock
• To Be Removed
After Phase 1 Construction
FI 12" CMP
Elv 251 64.,=
q 01
8
' Existing
Retaining
Wall
SS MH Elv 252.79
Invert 246.89
WV
WV
t�
FH
Leaend,
¢FH Fire Hydrant
0GM Cos Riser
® WM Water meter
a PP Power Pole
WV Water valve PROPDSED
Xl MATERIAL PROPOSED
HOPPERS J SILOS
PROPOSED /
OVERHEAD CONVEYOR-
tl
PROPOSED
TRUCK DUMP PIT
BUILDING MECHANICAL/ELECTRICAL
ROOF THAT IS WITHIN BUILDING SETBACK
10
Y P�� pF
f�'Stl�9\
<oodn
PROPERTY LINE
i