HomeMy WebLinkAboutZ-4485-A Staff AnalysisSUBDIVISIONS
NAME° Mariott Courtyard Hotel
(Garden Plaza Revised PCD)
(Z-4485-A)
LOCATION: North Side of Financial Centre
Parkway, approximately 600'
west of Shack le f ord
AGENT: ENGINEER:
Seth Barnhard Edward G. Smith and Associates
401 Victory
DEVELOPER: Little Rock, AR
Phone: 374-1666
Courtyard Development
c/o Financial Centre
Dev. Co.
P.O. Box 56350
Little Rock, AR 72215
Phone: 224-9600
AREA: 4.35 acres NO. OF LOTS: 1 FT. NEW ST.: 0
ZONING: "C-3"/"0-3'° to PCD
PROPOSED USES: Hotel
A. Development Objective
(1) To develop a hotel resulting from "The Courtyard
Concept," which is targeted toward the moderate
segment of the population. The concept provides
hotels with: (1) attractive, comfortable,
functional rooms; (2) a relaxing, secure
environment; (3) a simple restaurant with good
food; (4) a well managed operation with friendly,
helpful employees; and (5) an affordable price.-
B. Proposal
(1) The construction of a building for use as a hotel
according to the following:
SUBDIVISIONS
- Continued
(a)
Number of rooms ..............
1�-9
(b)
Number of suites ............
12
(c)
2 conference rooms ..........
1525
sq.
ft.
(d)
Restaurant ..................
1090
sq.
ft.
(46 seats)
(e)
Lounge ......................
960
sq.
ft.
(36 seats)
(f)
Guest room wings are 3-stories
where public areas are 1-story
(g)
Parking .....................
164
87,000
sq.
ft.
(h)
Building area ...............
(i)
Ratio of bldg. to land ......
19.9
(2) Developmental Time Frame:
Opening Date - 4th Quarter of 1987
Construction - Begins 1st Quarter of 1987
(3) Drainage:
The developer will utilize the parking lots or an
underground system for retention areas as required
by the City Drainage Ordinance.
(4) Platting:
A one lot replat will be submitted.
(5) Landscaping/Site Development:
The property will be developed in such a way as to
minimize excavation as much as possible. The lawn
and planting areas around the hotel will be
heavily planted. Included is a 25 to 32-foot
landscaped buffer strip along adjacent residential
areas.
C. Engineering Comments
(1) The Traffic Engineer requires that the opposite
side of the street on Financial Centre Parkway at
the western access point be shown in order to
determine the proper location for the access point
SUBDIVISIONS
- Continued
in regard to the existing median cut on Financial
Centre parkway.
(2) Stormwater detention calculations are required in
the location shown on the preliminary plat.
(3) Right-of-way dedication on Financial Centre
Parkway may be required.
D. .Analysis
The applicant has stated that changes from the proposal
that was originally approved on this site include: (1)
the reduction to 3-stories from 5; (2) size reduction
of meeting rooms, restaurant and lounge facility; (3)
reduction of rooms by 59; (4) reduction in the scale of
the building and no orientation of rooms toward the
neighborhood. The original plan had one wing facing
the neighbors and more parking located next to the
neighborhood.
The main issue is the location of the building closer
+ to the neighborhood than originally sited. However,
the landscaped buffer zone remains a minimum of 251
wide along the north and has been increased to 32' at
the northwest corner. Staff expects some input from
residents regarding this change. Enqineerinq comments
have been addressed.
E. Staff Recommendation
Approval as revised.
SUBDIVISION COMMITTEE REVIEW: (7-31-86)
The applicant requested a 30 day deferral.
SUBDIVISIONS
- Continued
PLANNING COMMISSION ACTION:
A motion for a 30-day deferral, as requested by the
applicant, was made and passed by'a vote of 11 ayes, 0 noes
and 0 absent.
SUBDIVISION COMMITTEE REVIEW: (8-28-86)
The applicant was present. He outlined several differences
between this proposal and the previous hotel approved for
this site. Staff indicated that all concerns had been
addressed. The item was passed to the Commission.
PLANNING COMMISSION ACTION (9-10-86):
The applicant was present. Mr. James Johnson of Birchwood Subdivision
explained that the developer had met with some adjoining land -owners; and
they were still concerned about the buffer area, fencing, and lighting.
He requested that: (1) the opaque fence be increased to 8' in height;
(2) the fence be located somewhere in the midst of the buffer area; and
(3) the retaining wall not create effects that would be considered adverse
to the neighborhood.
The application was represented by Mr. Ed Willis, the Developer;
Mr. Dave DesForges of the Marriott Corporation, and Mr. Mike Green;
Architect:
Mr. Willis stated that they were favorable to constructing an 8' fence,
but would like the flexibility to move the fence i;lithin the buffer area,
as dictated by the design and approval of a new grading plan. He agreed
to focus the lighting away from the neighborhood.
A motion was made for approval, subject to: (1) the construction of a
fence along the northern border which does not exceed 8' in height; and
(2) that the developer be given the option, at his discretion, to move
the fence inward 12.5'. The motion passed by a vote of:
11 ayes, 0 noes, and 0 absent.
NAME: Marriott Courtyard and Hotel "Short Form" PCD
(Z-4485-A)
LQ ATI I: North side of Financial Centre Parkway,
approximately 600' west of Shackleford
FV.L,Q ER AGENT: Marriott Corporation/Financial Centre
Development Co.
EXISTING STATUS: Vacant
PP OPOSFD U SE : Hotel
ZONING: "C73"/"0-3" to PCD
T.FF RF O MENDATION
Approval as revised. The applicant'submitted plans
addressing the comments originally requested by Engineer-
ing and Planning Staff.
PLANiii ING CO 1I S,S I ON_!
Approval, subject to: (1) construct.ion of a fence along the
northern border which does not exceed 8' in height and (2)
that the developer be given the option, at his discretion,
to move the fence 12.5' inward. The vote: lI ayes, 0 noes,
and 0 absent.