HomeMy WebLinkAboutZ-4473 Staff AnalysisAW
In
y 9, 1985
SUBDIVISIONS
Item No. _8
NAME: Kavanaugh Place
"Short -Form PCD" (Z-4473)
LOCATION: Southwest Corner of Kavanaugh
Boulevard and Ash Street
DEVELOPER: ENGINEER:
McClelland Dev. Corp. Lewis Engineering
2207 Hidden Valley Dr. 367 I-30
Suite 204 Alexander, AR 72202
Little Rock, AR 72212 Phone: 847-4630
Phone: 225-5569
AREA: .4863 acres NO. OF LOTS: 3 FT. NEW ST.: None
ZONING: "C-4" (Lots 1 and 2
"R-2" (Lot 3)
PROPOSED USE: Mixed Use Office and Retail
A. Development Objectives
(1) To provide a development in which location,
character and tenant mix will provide the
Hillcrest area with desirable retail and office
space, while contributing to the visual aesthetics
of the community and function of the commercial
district.
(2) To repeat established patterns in the
Heights/Hillcrest area, such as:
(a) The crescent shape of the building, which
relates to the old trolley turn around the
station;
(b) The street front pedestrian shopping pattern
that is prominent in the area;
(c) The similar architectural character (clay
tile awning) of the building occupied by The
Afterthought will be carried through on the
corner building.
July 9, 1985
SUBDIVISIONS
Item No. 8 - Continued
B. Proposal
(1) To provide a mixed used office/retail development
on .4 acres and to replat three lots into a single
site.
(2) Project Information
(a) Building Blueprint ........... 9,530 sq. ft.,
Building/Land Ratio .......... 45 percent
Corner Bldg. ....... 1st Floor .... 578
2nd Floor .... 540
Main Bldg. ....... 1st Floor .... 7,789
2nd Floor .... 8,109
Total
7,016 net
leasable
10 Leasable Units Proposed
(b) Parking: 22 cars on-site - 1 car per 773 sq. ft.
(c) Site Improvements Include:
i. Landscaping strip along south property line
to visually separate parking from the
adjacent residential area.
ii. Trees along the east sidewalk to enhance the
project and lessen the impact of the
Hillcrest Cleaners.
iii. Sidewalks will be concrete with brick paver
accents.
(3) Developmental Time Frame:
August 6, 1985 - "PUD" Granted
Sept. 6, 1985 - Break Ground for Construction
Feb. 6, 1986 - Construction Completed
C. Engineering Comments
(1) A landscaped strip is required adjacent to parking
on Ash Street.
f July 9, 1985
AV SUBDIVISIONS
Item No. 8-- Continued
(2) There is sufficient parking area on the south of
the projects for head -in parking if desired.
(3) Clarify building at the corner of Kavanaugh and
Ash Street - blind corner problem may exist.
(4) Recommend dumpster be located at an angle to the
alley.
D. Analvsis
The applicant has submitted a project that he
describes as being "strategically located at a 'bend in
the road' on Kavanaugh," and is by its physical layout,
at the visual terminus of the entire commercial
district to the west. Therefore, the building creates
a visual backdrop for shoppers in the area drawing them
through the shopping district, to "Kavanaugh Place" and
beyond. He points out also that the area is located in
the Neighborhood Commercial Revitalization Area of the
AV Heights/Hillcrest District Flan of 1981. He has also
designed the project to open up to the corner, to
maximize visibility for retail and drive -up parking.
Staff recognizes and appreciates the applicant's desire
to revitalize this area. Parking, however, is a
definite problem. Only 22 spaces are provided. The
applicant offers an estimate of approximately 50
addtional off-site spots available within one block,
considering the local restaurant and business hours
each project will operate. He is asked to clarify this
statement.
Staff has other concerns. First of all, the applicant
should identify each building on his site plan. He is
asked to clarify what appears to be the corner
building, it may create a problem for traffic. Also,
the 4' screen proposed is insufficient; it should be at
least 6'.
E. Staff Recommendation
Staff defers recommendation until above issues are
resolved.
is
J
July 9, 1985
SUBDIVISIONS
Item No. 8 - Continued
SUBDIVISION COMMITTEE REVIEW:
Mr. Vidas Baret, an owner to the west across the alley,
offered objections to the project on the basis of poor
drainage within this block. It was determined during the
course of his presentation that the Planning Commission
could condition the approval of this PUD upon submittal of
drainage and a retention plan. A discussion then followed
resulting in a motion to recommend approval of the request
to the Board of Directors subject to the suggested changes
which were: (1) submittal of a drainage and retention plan
prior to the issuance of a building permit; and (2)
conformance with the traffic engineer's agreed upon design
modifications. The Commission then voted on the motion
which passed by a vote of: 6 ayes, 0 noes and 5 absent.
�J
Ms. Cynthia Alderman represented the developer. A revised
plan was submitted which reduced the square footage to
12,894, provided 39 parking spaces and a 6 -foot fence.
The main issue discussed was the corner building and a
possible blind corner. The applicant was asked to meet with
Engineering staff before the public hearing to resolve the
issue.
Water Works - An 8 -inch water main extension from Woodlawn
will be required if the building is to have fire service.
PLANNING COMMISSION ACTION:
Ms. Cynthia Alderman, the applicant, was present
representing the proposal. There were several persons
present objecting to the conversion of the existing service
station and to specific design elements of the plan.
Mr. Richard Delay, the manager of the cleaners immediately
across Ash Street, offered comments concerning the traffic
flows at that intersection and the need for one-way traffic
flow between Ash and Kavanaugh on the corner parking area.
He requested that the plan, if approved, carry such a
requirement.
The City Engineer's staff then offered comments as to
resolution of several concerns about a potential blind
corner. An agreed upon plan was offered for modification of
the small building on the corner so as to eliminate the
to
blind corner issue. The applicant voiced agreement with the
proposed change.
Mr. Vidas Baret, an owner to the west across the alley,
offered objections to the project on the basis of poor
drainage within this block. It was determined during the
course of his presentation that the Planning Commission
could condition the approval of this PUD upon submittal of
drainage and a retention plan. A discussion then followed
resulting in a motion to recommend approval of the request
to the Board of Directors subject to the suggested changes
which were: (1) submittal of a drainage and retention plan
prior to the issuance of a building permit; and (2)
conformance with the traffic engineer's agreed upon design
modifications. The Commission then voted on the motion
which passed by a vote of: 6 ayes, 0 noes and 5 absent.
�J
April 9, 1991
ITEM NO.: 11 Other Matters
NAME:
LOCATION:
OWNER:
Kavanaugh Square - 2701
Kavanaugh
SW Corner of Kavanaugh and Ash
Street
Porter Brownlee
REQUEST :
This applicant proposes a revision to the original PCD
application. The revision proposes to allow a food service
establishment in the corner building and use of the
immediate area above the video store on the second floor of
the main building for a family video rental store. The
proposed restaurant will also have the capability of seating
for approximately 20 patrons.
STAFFREPORT'
The original PCD was approved in 1985 by the Planning
Commission and City Board. The PCD of record does not
permit a food service establishment and use of the second
floor for commercial use.
The proposed revision PCD modified the approved PCD by
requesting additional uses for the second floor of the main
building and the corner building.
STAFF RECOMMENDATION:
Staff recommends approval of the revised PCD subject to the
applicant complying with all building code requirements.
PLANNING COMMISSION ACTION:
(APRIL 9, 1991)
The applicant was present. There was one objector in
attendance. The Planning Staff recommended approval of the
revised PCD subject to the applicant complying with all
building codes requirements.
The applicant, Mr. Brownlee, stated that he would like to
use the corner building for food services and part of the
second floor for commercial use.
A lengthy discussion of the revised PCD followed with
several Commissioners asking questions concerning parking,
1
April 9, 1991
ITEM NO.: 11 Other Matters (Cont
future uses for corner building and impact on the
residential neighborhood. Mr. Wood from Planning Staff
responded by pointing out that restricting the space to a
specific use would create problems for the applicant and
require him to come back to Planning Commission.
The Chair then the objector to make her presentation. Mrs.
Spann, the resident of 604 Ash Street, objected to placing
another restaurant in the immediate vicinty. She stated
that "Andre's" restaurant, located adjacent to a common
alley, does bring a lot of traffic to the alley while
delivering food.
Commissioner Walker then posed questions about the dumpster
on the site. Mr. Brownlee, the applicant, responded that
there will not be as much waste from a pizza establishment
as there is from "Andre's" restaurant. He also added that
most of the projected customers will come to pick -it -up and
take-out.
A lengthy discussion then followed involving Commissioners,
the applicant and Planning Staff. Several options were
discussed. The Planning Commission required that applicant
maintain the grounds and use the second floor for commercial
expansion in conjunction with the first floor only. A
motion was made to approve this application with the stated
conditions and passed by the vote of 6 ayes, 0 nays and 5
absent.
E
r
July 9, 1985
SUBDIVISIONS
Item No. 8
NAME:
LOCATION:
DEVELOPER:
McClelland Dev. Corp.
2207 Hidden Valley Dr.
Suite 204
Little Rock, AR 72212
Phone: 225-5569
Kavanaugh Place
"Short -Form PCD" (Z-4473)
Southwest Corner of Kavanaugh
Boulevard and Ash Street
VMaTMVrP
Lewis Engineering
367 I-30
Alexander, AR 72202
Phone: 847-4630
AREA: .4863 acres NO. OF ]OTS: 3 FT. NEW ST.: Nome
ZONING: "C-4" (Lots 1 and 2
"R-2" (Lot 3)
PROPOSED USE: Mixed Use Office and Retail
A.
Development Ob'ectives
(1) To provide a development in which location,
character and tenant mix will provide the
Hillcrest area with desirable retail and office
space, while contributing to the visual aesthetics
of the community and function of the commercial
district.
(2) To repeat established patterns in the
Heights/Hillcrest area, such as:
(a) The crescent shape of the building, which
relates to the old trolley turn around the
station;
(b) The street front pedestrian shopping pattern
that is prominent in the area;
(c) The similar architectural character (clay
tile awning) of the building occupied by The
Afterthought will be carried through on the
corner building.
.��,e •ice � r •�r t � '��
July 9, 1985
SUBDIVISIONS
{� Item No. 8 - Continued
' B. Proposal
(1) To provide a mixed used office/retail development
on .4 acres and to replat three lots into a single
site.
(2) Project Information
(a) Building Blueprint ........... 9,530 sq. ft.
Building/Land Ratio .......... 45 percent
Buildings
Corner Bldg. ....... lst Floor .... 578
2nd Floor .... 540
Main Bldg. ....... 1st Floor 7,789
p 2nd Floor .... 8,109
Total 7,016 net
leasable
10 Leasable Units Proposed S
(b) Parking: 22 cars on-site - 1 car per 773 sq. ft.
(c) Site Improvements Include:
i. Landscaping strip along south property line
to visually separate parking from the
adjacent residential area.
ii. Trees along the east sidewall: to enhance the
project and lessen the impact of the
Hillcrest Cleaners.
iii. Sidewalks will be concrete with brick paver
accents.
(3) Developmental Time Frame:
August 6, 1985 - "PUD" Granted
Sept. 6, 1985 - Break Ground for Construction
Feb. 6, 1986 - Construction Completed
C. Engineering Comments
(1) A landscaped strip is required adjacent to parking
on Ash Street.
D. Analysis
The applicant has submitted a project that he
describes as being "strategically located at a 'bend in
the road' on Kavanaugh," and is by its physical layout,
at the visual terminus of the entire commerciaX
district to the west. Therefore, the building creates
a visual backdrop for shoppers in the area drawing them
through the shopping district, to "Kavanaugh Place" and
beypnd. He paints out also that the area is located in
the Neighborhood Commercial Revitalization Area of the
Heights/Hillcrest District Plan of 1981. He has also
designed the project to open up to the corner, to
maximize visibility for retail and drive -up parking.
Staff recognizes and appreciates the applicant's desire
to revitalize this area. Parking, however, is a
definite problem. Only 22 spaces are provided. The
applicant offers an estimate of approximately 50
addtional off-site spots available within one block,.
considering the local restaurant and business hours
each project will operate. He is asked to clarify this
statement.
Staff has other concerns. First of all, the applicant
should identify each building on his site plan. He is
asked to clarify what appears to be the corner
building, it may create a problem for traffic. Also,
the 4' screen proposed is insufficient; it should be at
least 6'.
E. Staff Recommendation
Staff defers recommendation until above issues are
resolved.
..rhe
July
9,
1985
Ir
SUBDIVISIONS
Y
Item
No.
8 - Continued
r,
(2)
There is sufficient
parking area
on the south of
the projects for head
-in parking
if desired.
(3)
Clarify building at
the corner of
Kavanaugh and
Ash Street - blind
corner problem
may exist.
(4)
Recommend dumpster
be located at
an angle to the
alley.
D. Analysis
The applicant has submitted a project that he
describes as being "strategically located at a 'bend in
the road' on Kavanaugh," and is by its physical layout,
at the visual terminus of the entire commerciaX
district to the west. Therefore, the building creates
a visual backdrop for shoppers in the area drawing them
through the shopping district, to "Kavanaugh Place" and
beypnd. He paints out also that the area is located in
the Neighborhood Commercial Revitalization Area of the
Heights/Hillcrest District Plan of 1981. He has also
designed the project to open up to the corner, to
maximize visibility for retail and drive -up parking.
Staff recognizes and appreciates the applicant's desire
to revitalize this area. Parking, however, is a
definite problem. Only 22 spaces are provided. The
applicant offers an estimate of approximately 50
addtional off-site spots available within one block,.
considering the local restaurant and business hours
each project will operate. He is asked to clarify this
statement.
Staff has other concerns. First of all, the applicant
should identify each building on his site plan. He is
asked to clarify what appears to be the corner
building, it may create a problem for traffic. Also,
the 4' screen proposed is insufficient; it should be at
least 6'.
E. Staff Recommendation
Staff defers recommendation until above issues are
resolved.
1t.:,
J,jl,.y 9, 1985
SUBDIVISIONS
Item No. 8 - Continued
SUBDIVISION COMMITTEE REVIEW:
Ms. Cynthia Alderman represented the developer. A revised
plan was submitted which reduced the square footage to
12,894, provided 39 parking spaces and a 6 -foot fence.
The main issued discussed the corner building and a possible
blind corner. The applicant was asked to meet with
Engineering before the public hearing to resolve the issue.
Water Works - An 8 inch water main extension from Woodlawn
will be required if the building is to have fire service.
1. Meetinq Date: July 9, 1985
2. Item No.: Z-4473
3. Name/Request: Kavanaugh Place "PCD"
4. Location: SW Corner of Kavanaugh Blvd. and Ash St.
5. Developer/Engineer: McClelland Development Corp./
Lewis Engineering
6. Existing Status: Abandoned Service Station/Single
Family House
7. Proposed Use: Mixed Use Office and Retail
8. Staff Recommendation: Staff originally deferred
recommendation on the plan submitted until the parking,
landscaping/cleaning and technical site plan
requirements were met. At the Subdivision Committee
meeting, a revised plan was submitted which reduced the
square footage of proposed building space, provided
adequate parking and a 6' fence. The applicant was
then asked to meet with Engineering and resolve a
possible "blind corner" created by a proposed
structure. Staff supported the revised plan.
9. Planning Commission Recommendation: Approval of the
site plan, subject to: (1) a one-way traffic plan on
the front corner parking with exit only onto to
Kavanaugh Boulevard; (2) submittal of a drainage
retention plan prior to the issuance of a building
permit; and (3) conformance with the Traffic Engineer's
agreed upon design modification.
10. Recommendation Forwarded With: 6 ayes, 0 noes, 5
absent.