HomeMy WebLinkAboutZ-4470-M Staff AnalysisMay 14, 2020
ITEM NO.: 9
NAME: Chenal Park Centre Short -form PCD
LOCATION: 15100-15198 Chenal Parkway
DEVELOPER:
Chenal Park Center, LLC/Chenal Park Center II, LLC
PO Box 22407
Little Rock, AR 72221
501-219-0919
OWNER/AUTHORIZED AGENT:
Chenal Park Center, LLC/Chenal Park Center II, LLC/Owner
Grafton Tull/Authorized Agent
SURVEYOR/ENGINEER:
Crafton Tull /Surveyor & Engineer
AREA: 6.21 acres
WARD: 5
CURRENT ZONING
ALLOWED USES
NUMBER OF LOTS: 5
PLANNING DISTRICT: 19
C-2, Shopping Center District
C-2 Uses
FILE NO.: Z -4470-M
FT. NEW STREET: 0 LF
ENSUS TRACT: 42.16
PROPOSED ZONING: PCD, Planned Commercial Development
PROPOSED USE: Office, Commercial, and Retail Uses
VARIANCE/WAIVERS:
1. Vehicles backing into a service easement
2. Lots without direct access to a public street
May 14, 20201
SUBDIVISION
ITEM NO 9 (Cont) FILE NO.: Z -4470-M
SACKIGROUND.
wrnr�er$j� is Ir,n�4crd nn thn nnrih .aurin of the i rfnn!1 block of Chenai Parkway anti ;c, -
This
situated within the Chenal Design Overlay District.
On August 16, 1988, it was zoned C-2, Shopping Center District after the adoption of
Ordinance Number 15,530.
A preliminary plat was approved by the planning commission on November 19, 2015, to
subdivide the majority of this parcel into four commercial lots.
A Zoning Site Pian Review was approved by the planning commission on ALJgUSt 31,
2017 for Lot 2, the westernmost lot anal a final plat approved for Lot 2 in ,January 2018.
This site plan approved the development of a single commercial structure.
The entire site was replatted in November 201 ; . Five lots were created. your cots have
1_-__b--- 1_�-, F+i...__-.•i i'i...} ., A f r4}., j-4. 74. ,.v b..w 4.- bid- nnc-i•o-r �a ira 1A n--nQ, i�hgn�i
110nicaw along, Chenal 1 arvCvvQ j . �l i.iu i ivL - l!WcuLiwU Lv L..i.. ..vi ii.
On June 28, 2018, another two commercial structures were approved by the planning
commission through the Zoning Site plan Review process. The buildings are on Lots 3
and 4.
An application was submitted in September 2018 for an additional monument sign on Lot
3 to serve the development on the rear lots. This request would have created a PCD for
rhe entire property, as the propoCed sign did not conform to the Chenal Design Overlay
District limiting each parcel one MOilUrnent sign of up to 100 square feet in area and
8 feet in height. This item was withdrawn by the applicant, as they were unable to develop
a site plan for the northern portion of the property that the proposed sign was intended to
serve. �+ �i C 1�LL
A. rRV^rOSALIREil1CS IlAPr^LI^iAl`V I �S S I AT€IVIEIVT.
This proposal is to provide sites for the development of a 30,450 square foot, three-
story office building on Lot 1 and an 8,800 square foot child development center
on Lot 5. Lots 2, 3, and 4 are already developed with commercial structures and
associated parking.
I-flf 1 is 1.93 acres and would have 125 parking spaces dedicated to the users of
to office nl iiiriinn Lot 2 has 1.43 acres and will contain 33 parking space for the
use of that development. Lots 1 and 5 will have a cross access easement between
them. These two lots will take their access from existing driveways and curb cuts
on Chenal Parkway. Stormwater will be detained on each lot.
2
May 14, 2020
UBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z -4470-M
B. EXISTING CONDITIONS:
The property is situated north of Chenal Parkway east of Wellington Hills Road.
The portion of the site fronting onto Chenal Parkway is developed with three
commercial structures intended for multiple tenant occupancy.
To the north is an apartment complex that shares an access drive to Chenal
Parkway with the subject property.
Another apartment complex was recently completed to the south across Chenal
Parkway. To the east of this development is a single-family neighborhood.
Additional commercial development is found to the west
C NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any public comments on this request.
Notice of the public hearing was sent to all owners of properties located within
200 feet of the site and the Parkway Place, Villages at Wellington and St. Charles
neighborhood associations.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Sidewalk should be extended to the fronts of the proposed buildings from
Chenal Parkway.
2. A variance is required for the proposed backing into a service easement per
Sec. 31-210(h)(7).
E. UTILITIESIFIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority:
Sewer available to this site.
Retain existing sewer easements.
3
May 14, 2020
SUBDIVISION
ITEM NO.: g (Cont.)
FILE NO.: Z -4470-M
LEntergy %d Died to 4h'c prWo-,osai Entelrgy has i.iv 3-phase power available
Li nvi yy u0ea not iw�c�.� w �i iia Nt vNvJai. t_t tt. tyy t t N N
on south side of proposed; development. There does not appear to be an,: conflicts
with existing electrical utilities at this location. Contact Entergy in advance to
discuss electrical service requirements, or adjustments to existing facilities (if any)
as this project proceeds.
CenterPoint Energy. No comment.
AT T• Ai^ y+^�',-0081A
I i . NO coifiili iii y -M.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for water
service must be meC.
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydirantrg) are required, they will be installed at the Developer's expense.
Pl�l�g�� ^tth-,;+ ! n^ f. -%r --aa ^_ ¢ ^il;t'ac on. -U fir= pr.n+nctinn j ten•, to rohtrn!
ease 3aa✓t t tt: t.3ts;.tI t3 —v — iii t�a'vtti -- ut iaar or t v '�J - • - " .
Arkansas Water for review. Pians revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of pians by the Arkansas Department of
Health Engineering Division and Little Rock Fire Department is required.
The facilities on site will be private. When meters are planned ofi private lines,
private facilities shall be installed to CAW's material and construction specifications
and installation will be inspected by an engineer, licensed to practice in the State
of Arkansas. Execution of a Customer Owned Line Agreement is required.
Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZ) is required on the domestic water service. This
assembly must be installed prior to the first point of use. CAW requires that upon
installation of the RPZA, successful tests of the assembly must be completed by a
Certified Assembly Tester licensed by the State of Arkansas and approved by
CAW. The test results must be sent to CAW's Cross Connection Section within
10 days of installation and annually thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to discuss backflow prevention requirements
for this project.
0
May 14, 2020
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.- Z-44
Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector valve assembly. If additives are used, a reduced
pressure backflow preventer shall be required.
Fire Department:
Full Man review
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention
Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square feet that
have a single approved fire apparatus access road when all building are equipped
throughout with approved automatic sprinkler systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of the
5
May 14, 2020
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z -4470-M
maximum overall diagonal dimension of the lot or area to be served, measured in
a straight line lei ve'i'l i accesses.
30' Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire prevention Code Vol. 1 Section D106.1
®13105.4
D105.1 Where Required. Where the vertical distance between the grade
plane and the highest roof surface exceed 30', approved aerial fire apparatus
access roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
a...r..&ctifo.., f La., ai... 4,_ior 11 4Eha'Lop F+M_ pet walls,
hic],laveir
iiiia..i�e."vlilJii Vi � IVVi iv tii� �X �.iiVl V�aii, ui tii=r I.V}� vl lily �aii�g.lvi vvi�.ii�, VvliiLii
is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
bi iiildinn rir nni- idyl t hinmM
ba, iPw buil_diaw__ A4- iron4, ni'v �+ of +i,- rAl'al lii-Arg acves.S.. rni,f 'v
5�y� pLd }'�i eViOiii i1. -g av wiuliawii ia�-i{1. I1\L IVi GAJL V IV;^�VI L 14r 1 �rq\.IM11 V\A iii ii
11 iti eti 1-1iT�. 1hi-5 col Idi ir%n s hall be located within 1 a 1_i brill]] i of 15 feet and .- ma irn.um
toff 30 feet from the building and shall be poSitinneri para!!el to one entire Side of
the building. The side of the building on which the aerial fire apparatus aCCess road
is positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be located
over the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire prevention Code Val. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply with
all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
1.1
May 14, 2020
SUBDIVISION
ITEM NO.: 9 Cont.
FILE NO.: Z-447
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office
(Capt. Tony Rhodes 501-918-3757 or Capt. John Hogue 501-918-3754). Number
and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment received.
F. BUILDING CODES/LANDSCAPE
Building Code:
Project is subject to full commercial plan review and approval prior to issuance of
a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; criche iittlervck. ov or
Steve Crain at 501-371-4875; scrain(alittlerock.go_v
Landscape:
1. Any new site development must comply with the City's minimal landscape and
buffer ordinance requirements and the Chenal Overlay District.
7
lvlay 14, 2020
SUBDIVISION
ITEI�JI NO.: 9 (Cont-; FILE NO.: Z-4470 .M
2_ A perimeter planting strip is required along any side of a vehicular
y use area that
YA314P adjoining
TPi Y13'9 e49 !'Tel Y TTi f1 Tl ��/'1 T_1 a%f -T f91/ i�Z1T PlTfi� r11�Aii v3� s�ni
abuts djoi, iii ie p„ ope, Ly, of :, ie riy,,. W, �.Gy — a„y tet, ___. , _ s�, s
least nine (9� feet wide. One 1 i) tee and three ko) shrubs or vines shat e
planted for every thirty (3C) !;near feet of perirrieLer planting strep.
3. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be one hundred
fifty (15M square feet for developments with one hundred fifty (156) or fewer
parking spaces. Interior islands must be a minimum of seven and one half
(7 112) feet in width. Trees shail be included in the interior iandscape areas at
the .rate of one (1) tree for every twelve (12) parking spaces.
4. Landscape areas shall be provided between the vehicular use area used for
iii i„iir. nari-inn and the rrp-��erai vi_.in,ity _,f the ruilding, ex_ tiding muck loading
or service areas not open to public parking. These shall be provided at the rate
equivalent to planter strip three (3) feet wide along the vehicular use area. 011e
- - (1-)-treFe arzd !'aur (4) shrutfs-sh-ali 'be planted- m-the-bultding -landscape-areas for
each forty (40) linear feet of vehicular use area abutting the building.
'i, J 1. ,__ JJ_J 2.-1L� i L..:iJ:.-�.
Landscape drea5 will f]eLU LU �e aUcaeU '10rthe commercial !�ui�caiily.
5. Aland use buffer six (6) percent of the average width f depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive
nature. As a component of all land use buffer requirements, opaque screening,
whether a fence or other device, a minimum of six (6) feet in height shall be
required upon the property line side of the bunter. Easements cannot count
toward fulfilling this requirement. The plantings, existing and purposed, shall be
provided within the landscape ordinance of the city, section 15-81.
Provide screening and landscape adjacent to the north property line.
6. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
7. The City Beautiful Commission recommends
trees as feasible on this site. Credit toward
requirements can be given when preserving
or larger.
E:?
preserving as many existing
fulfilling Landscape Ordinance
trees of six (6) inch caliper
May 14, 2020
SUBDIVISION
ITEM NO.: 0 (Cont) FILE NO.: Z -4470-M
G. TRANSPORTATION/PLANNING:
Rock Reaion Metro: No comment received
Planning Division: The request is in the Chenal Planning District. The Land Use
Plan shows Commercial (C) for the requested area. Commercial category includes
a broad range of retail and wholesale sales of products, personal and professional
services, and general business activities. Commercial activities vary in type and
scale, depending on the trade area that they serve. The application is a change
the property from C-2 (Shopping Center District) to PCD (Planned Commercial
Development) District to allow the area to be a five lot development with three
(existing) retail buildings and the addition of a three-story office building and child
care facility with signage and common drives etc. The site is within the Chenal
Design Overlay District.
Master Street Plan: To the south is Chenal Parkway and it is a Principal Arterial
on the Master Street Plan. A Principal Arterial is to serve through traffic and to
connect major traffic generators or activity centers within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Chenal Parkway since it is a Principal Arterial. This street may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There is a Class I Bike Path is shown along Chenal Parkway.
A Bike Path is to be a paved path physically separate for the use of bicycles.
Additional right-of-way or an easement is recommended. Nine -foot paths are
recommended to allow for pedestrian use as well (replacing the sidewalk).
H. SUBDIVISION COMMITTEE COMMENT: March 11, 2020
The applicant was present. Staff presented the item to the committee.
Planning staff asked if there were any alternatives uses planned for Lot 5 beyond
the proposed child care use. The applicant was also requested to provide the
dimensions for the proposed monument sign and dumpster screening. Lastly,
additional information specific to the operation of the child care use, such as the
proposed drop-off/pick-up path and area and the number of children and
employees was requested.
Public works indicated sidewalks should be extended to the fronts of the proposed
buildings from Chenal Parkway and a variance was necessary to approve the
proposed vehicle backing into a service easement.
May 14, 2020
SUBDIVISION
ITEM NO.: 9 (Cont.) 1=ILE NO.: Z -4470-M
I he Landscape comments were noted witrl specific attention directed toward file
rte -.lire- for
screening
-and
'anal f ifing (l dac- nt 110 Lh- Iff i 1 lS iiS lf� II::Y�
i';Kj%AI V111V !vi �ViL�.aieolly ally iun.n.�•.osa�: �.Z �..a,+., �•••��-1'_J••i •• '•i
L ri responses ons c d r � io � r� r, be received I9i1
The appli cant was advise, lc��v.l�e� aria levls.�,n� a. tv b� received �;
March 18, 2020. The committee forwarded the item to the full commission.
ANALYSIS:
A revised site plan and comment responses were provided by the applicant.
1__.___ i_ i n i-_. u:_� I-..:1-1:.--. AA- s.��a,..�t a t Ann F.+nf 4...
Lot I Is illo-wn DC7 coFiiaiil a J-stOrY Off:6 LU:lj-l:n�j. ilyiLll a lVVLii31nL o! lv:l 116 uy
60 feet and a maximum square footage of 30,450 square feet. 125 parking spaces
are provided. The parking standards of the zoning ordinance require a minimum
of one parking space per 400 square feet of floor area, with an allowance of a
building between 30,000 and 40,000 square feet to provide 85% of that
requirement. The proposed parking exceeds with minimum requirement.
i developed
•l'- iq•lo.l
Lot 5 is to be developed ��Viul an 8,800 square Haut building to be i,iseC11 as a 0hi"03
4...- S-. •J7 !d•n�„ TI.,., .1i rar• r-.1irecJ r�hilsJ horn
care center with JJ parking spaces. The zoning ordinance Iequu child me
canters to pr id f)C1P �[�aCe for earn administrator- teacher; and employee on the
lamest shift plus one space per facility vehicle plus 1 space per 10 person capacity.
The number of staff persons is to be no more than 16 and the number of children
Atherefore,
s the
l�;r� ' would
i5 propose U io be 1 gill; t ler eior e, �I a number leer of par nil g spaced pr oposeu v'ould
be sufficient to meet the requirements for all the staff and children, as well as for
3 vehicles associated with the operation.
Both Lots 1 and 5 do not have frontage on a public street and would utilized shared
access easements from Chenal Parkway. Each lot has such an easement and
there would be an additional access easement between these two lots to create
sufficient movement.
The desired uses for Lot 1 would be either general and professional office or a
restaurant without a drive-thru; however, the request would be to keep the
permitted uses within the PCD to those in the C-2, Shopping Center district.
The proposed additional monument sign would be 98 square feet in area with a
height of 7 -feet 8 and 1/2 inches. The Chenal Design Overlay District allows such
a sign to be no more than 100 square feet in area and no greater than 8 feet in
height. This sign would violate the limitation of one sign per parcel, however, the
proposed sign is intended for use by the tenants of Lots 1 and 5.
The dumpster locations proposed for Lots 1 and 5 are to be fully enclosed by
screens of masonry and concrete block with opaque steel gates.
10
May 14, 2020
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z -4470-M
It is intended for parents of children under care at the child care center to park in
the area provided to the east of the building on Lot 5 and to then to escort the
children into the building.
The play area situated to the north of the child care center would be enclosed with
an opaque wood or vinyl coated chain link fence with gates for access and
maintenance.
Sidewalks and marked pedestrian paths are shown on the revised site plan to
provide a connection from the proposed new buildings to Chenal Parkway.
A variance has been requested to allow parking spaces with vehicles backing into
service easements.
The applicant will comply with the landscaping requirements. Details on the
specifics will be determined at the time of permitting.
It appears all technical issues have been addressed.
Staff supports the proposed site development and uses. Staff also supports the
additional monument sign on Lot 3 which would provide signage for the tenants of
Lots 1 and 5.
STAFF RECOMMENDATION:
Staff recommends approval of the PCD subject to compliance with the comments
and conditions outlined in paragraphs D, E, and F and the staff analysis in the
agenda staff report.
PLANNING COMMISSION ACTION:
(MAY 14, 2020)
The applicant was present. There were no persons present registered in support or
opposition. Staff presented the item and a recommendation of approval as outlined in the
"staff recommendation" above. There was no further discussion. The item was placed
on the consent agenda and approved as recommended by staff, including all staff
comments and conditions. The vote was 10 ayes, 0 noes and 1 absent.
11
ILE NO.: Z -4470-M
NAME: Chenal Park Centre Short -form PCD
LOCATION: 15100-15198 Chenal Parkway
DEVELOPER:
Chenal Park Center, LLC/Chenal Park Center II, LLC
PO Box 22407
Little Rock, AR 72221
501-219-0919
OWNER/AUTHORIZED AGENT:
Chenal Park Center, LLC/Chenal Park Center II, LLC/Owner
Crafton Tull/Authorized Agent
SURVEYOR/ENGINEER-
Grafton Tull /Surveyor & Engineer
AREA: 6.21 acres NUMBER OF LOTS: 5 FT. NEW STREET: 0 LF
WARD: 5 PLANNING DISTRICT: 19 CENSUS TRACT: 42.16
CURRENT ZONING: C-2, Shopping Center District
ALLOWED USES: C-2 Uses
PROPOSED ZONING: PCD, Planned Commercial Development
PROPOSED USE: Office, Commercial, and Retail Uses
VARIANCE/WAIVERS:
1. Vehicles backing into a service easement
2. Lots without direct access to a public street
FILE NO.. Z -4470-M (Cont
BACKGROUND:
This property is located on the north side of the 15000 block of Chenal Parkway and is
situated within the Chenal Design Overlay District.
On August 16, 1988, it was zoned C-2, Shopping Center District after the adoption of
Ordinance Number 15,530.
A preliminary plat was approved by the planning commission on November 19, 2015, to
subdivide the majority of this parcel into four commercial lots.
A Zoning Site Plan Review was approved by the planning commission on August 31,
2017 for Lot 2, the westernmost lot and a final plat approved for Lot 2 in January 2018.
This site plan approved the development of a single commercial structure.
The entire site was replatted in November 2017. Five lots were created. Four lots have
frontage along Chenal Parkway. A fifth lot situated to the north would access Chenal
Parkway via an access and utility easement.
On June 28, 2018, another two commercial structures were approved by the planning
commission through the Zoning Site Plan Review process. The buildings are on Lots 3
and 4.
An application was submitted in September 2018 for an additional monument sign on Lot
3 to serve the development on the rear lots. This request would have created a PCD for
the entire property, as the proposed sign did not conform to the Chenal Design Overlay
District limiting each parcel one monument sign of up to 100 square feet in area and
8 feet in height. This item was withdrawn by the applicant, as they were unable to develop
a site plan for the northern portion of the property that the proposed sign was intended
to serve.
A. PROPOSALIREQUESTIAPPLICANT'S STATEMENT:
This proposal is to provide sites for the development of a 30,450 square foot, three-
story office building on Lot 1 and an 8,800 square foot child development center
on Lot 5. Lots 2, 3, and 4 are already developed with commercial structures and
associated parking.
Lot 1 is 1.93 acres and would have 125 parking spaces dedicated to the users of
the office building. Lot 2 has 1.43 acres and will contain 33 parking spaces for the
use of that development. Lots 1 and 5 will have a cross access easement between
them. These two lots will take their access from existing driveways and curb cuts
on Chenal Parkway. Stormwater will be detained on each lot.
2
FILE NO. Z -4470-M Cont.
B. EXISTING CONDITIONS:
The property is situated north of Chenal Parkway east of Wellington Hills Road.
The portion of the site fronting onto Chenal Parkway is developed with three
commercial structures intended for multiple tenant occupancy.
To the north is an apartment complex that shares an access drive to Chenal
Parkway with the subject property.
Another apartment complex was recently completed to the south across Chenal
Parkway. To the east of this development is a single-family neighborhood.
Additional commercial development is found to the west
C. NEIGHBORHOOD COMMENTS -
As of this writing, staff has not received any public comments on this request.
Notice of the public hearing was sent to all owners of properties located within
200 feet of the site and the Parkway Place, Villages at Wellington and St. Charles
neighborhood associations.
D. ENGINEERING COMMENTS,
PUBLIC WORKS CONDITIONS:
1. Sidewalk should be extended to the fronts of the proposed buildings from
Chenal Parkway.
2. A variance is required for the proposed backing into a service easement per
Sec. 31-210(h) (7).
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority:
Sewer available to this site.
Retain existing sewer easements.
Enter
Entergy does not object to this proposal. Entergy has UG 3-phase power available
on south side of proposed development. There does not appear to be any conflicts
with existing electrical utilities at this location. Contact Entergy in advance to
discuss electrical service requirements, or adjustments to existing facilities (if any)
as this project proceeds.
3
FILE NO.: Z -4470-M
CenterPoint Energy- No comment.
AT & T: No comment received
Central Arkansas Water
All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and Little Rock Fire Department is required.
The facilities on site will be private. When meters are planned off private lines,
private facilities shall be installed to CAW's material and construction specifications
and installation will be inspected by an engineer, licensed to practice in the State
of Arkansas. Execution of a Customer Owned Line Agreement is required.
Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZ) is required on the domestic water service. This
assembly must be installed prior to the first point of use. CAW requires that upon
installation of the RPZA, successful tests of the assembly must be completed by a
Certified Assembly Tester licensed by the State of Arkansas and approved by
CAW. The test results must be sent to CAW's Cross Connection Section within
10 days of installation and annually thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to discuss backflow prevention requirements
for this project.
Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector valve assembly. If additives are used, a reduced
pressure backflow preventer shall be required.
Fire Department
Full plan review
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
ld
FILE NO.: Z -4470-M (Cont.
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention
Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square feet that
have a single approved fire apparatus access road when all building are equipped
throughout with approved automatic sprinkler systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured in
a straight line between accesses.
30' Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1
— D105.4
D105.1 Where Required. Where the vertical distance between the grade
plane and the highest roof surface exceed 30', approved aerial fire apparatus
access roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls, whichever
is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
5
FILE NO.: Z -4470-M (Cont.
D105.3 Proximity to building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a maximum
of 30 feet from the building, and shall be positioned parallel to one entire side of
the building. The side of the building on which the aerial fire apparatus access road
is positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be located
over the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply with
all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
FILE NO.: Z -4470-M
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office
(Capt. Tony Rhodes 501-918-3757 or Capt. John Hogue 501-918-3754). Number
and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment received.
F. BUILDING CODES/LANDSCAPE,
Building Code,
Project is subject to full commercial plan review and approval prior to issuance of
a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey(d,)littlerock.ggv- or
Steve Crain at 501-371-4875; scrain _littlerock.gov
Landscape:
1. Any new site development must comply with the City's minimal landscape and
buffer ordinance requirements and the Chenal Overlay District.
2. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property, or the right-of-way of any street. This strip shall be at
least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be
planted for every thirty (30) linear feet of perimeter planting strip.
3. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be one hundred
fifty (150) square feet for developments with one hundred fifty (150) or fewer
parking spaces. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces.
4. Landscape areas shall be provided between the vehicular use area used for
public parking and the general vicinity of the building, excluding truck loading
or service areas not open to public parking. These shall be provided at the rate
equivalent to planter strip three (3) feet wide along the vehicular use area. One
(1) tree and four (4) shrubs shall be planted in the building landscape areas for
7
FILE NO.: Z -4470-M (Cont.
each forty (40) linear feet of vehicular use area abutting the building.
Landscape areas will need to be added for the commercial building.
5. A land use buffer six (6) percent of the average width / depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive
nature. As a component of all land use buffer requirements, opaque screening,
whether a fence or other device, a minimum of six (6) feet in height shall be
required upon the property line side of the buffer. Easements cannot count
toward fulfilling this requirement. The plantings, existing and purposed, shall be
provided within the landscape ordinance of the city, section 15-81.
Provide screening and landscape adjacent to the north property line.
6. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
7. The City Beautiful Commission recommends
trees as feasible on this site. Credit toward
requirements can be given when preserving
or larger.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comment received.
preserving as many existing
fulfilling Landscape Ordinance
trees of six (6) inch caliper
Planning Division: The request is in the Chenal Planning District. The Land Use
Plan shows Commercial (C) for the requested area. Commercial category includes
a broad range of retail and wholesale sales of products, personal and professional
services, and general business activities. Commercial activities vary in type and
scale, depending on the trade area that they serve. The application is a change
the property from C-2 (Shopping Center District) to PCD (Planned Commercial
Development) District to allow the area to be a five lot development with three
(existing) retail buildings and the addition of a three-story office building and child
care facility with signage and common drives etc. The site is within the Chenal
Design Overlay District.
Master Street Plan: To the south is Chenal Parkway and it is a Principal Arterial
on the Master Street Plan. A Principal Arterial is to serve through traffic and to
connect major traffic generators or activity centers within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Chenal Parkway since it is a Principal Arterial. This street may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There is a Class I Bike Path is shown along Chenal Parkway.
A Bike Path is to be a paved path physically separate for the use of bicycles.
E:
FILE NO.: Z -4470-M (Cont.)
Additional right-of-way or an easement is recommended. Nine -foot paths are
recommended to allow for pedestrian use as well (replacing the sidewalk).
H. SUBDIVISION COMMITTEE COMMENT: March 11, 2020
The applicant was present. Staff presented the item to the committee
Planning staff asked if there were any alternatives uses planned for Lot 5 beyond
the proposed child care use. The applicant was also requested to provide the
dimensions for the proposed monument sign and dumpster screening. Lastly,
additional information specific to the operation of the child care use, such as the
proposed drop-off/pick-up path and area and the number of children and
employees was requested.
Public works indicated sidewalks should be extended to the fronts of the proposed
buildings from Chenal Parkway and a variance was necessary to approve the
proposed vehicle backing into a service easement.
The Landscape comments were noted with specific attention directed toward the
requirement for screening and landscaping adjacent to the north property line.
The applicant was advised responses and revisions are to be received by
March 18, 2020. The committee forwarded the item to the full commission.
ANALYSIS:
A revised site plan and comment responses were provided by the applicant
Lot 1 is shown to contain a 3 -story office building with a footprint of 100 feet by
60 feet and a maximum square footage of 30,450 square feet. 125 parking spaces
are provided. The parking standards of the zoning ordinance require a minimum
of one parking space per 400 square feet of floor area, with an allowance of a
building between 30,000 and 40,000 square feet to provide 85% of that
requirement. The proposed parking exceeds with minimum requirement.
Lot 5 is to be developed with an 8,800 square foot building to be used as a child
care center with 33 parking spaces. The zoning ordinance requires child care
centers to provide one space for each administrator, teacher, and employee on the
largest shift plus one space per facility vehicle plus 1 space per 10 person capacity.
The number of staff persons is to be no more than 16 and the number of children
is proposed to be 140; therefore, the number of parking spaces proposed would
be sufficient to meet the requirements for all the staff and children, as well as for
3 vehicles associated with the operation.
9
FILE NO.: Z -4470-M Cont.
Both Lots 1 and 5 do not have frontage on a public street and would utilized shared
access easements from Chenal Parkway. Each lot has such an easement and
there would be an additional access easement between these two lots to create
sufficient movement.
The desired uses for Lot 1 would be either general and professional office or a
restaurant without a drive-thru, however, the request would be to keep the
permitted uses within the PCD to those in the C-2, Shopping Center district.
The proposed additional monument sign would be 98 square feet in area with a
height of 7 -feet 8 and Y2 inches. The Chenal Design Overlay District allows such
a sign to be no more than 100 square feet in area and no greater than 8 feet in
height. This sign would violate the limitation of one sign per parcel; however, the
proposed sign is intended for use by the tenants of Lots 1 and 5.
The dumpster locations proposed for Lots 1 and 5 are to be fully enclosed by
screens of masonry and concrete block with opaque steel gates.
It is intended for parents of children under care at the child care center to park in
the area provided to the east of the building on Lot 5 and to then to escort the
children into the building.
The play area situated to the north of the child care center would be enclosed with
an opaque wood or vinyl coated chain link fence with gates for access and
maintenance.
Sidewalks and marked pedestrian paths are shown on the revised site plan to
provide a connection from the proposed new buildings to Chenal Parkway.
A variance has been requested to allow parking spaces with vehicles backing into
service easements.
The applicant will comply with the landscaping requirements. Details on the
specifics will be determined at the time of permitting.
It appears all technical issues have been addressed.
Staff supports the proposed site development and uses. Staff also supports the
additional monument sign on Lot 3 which would provide signage for the tenants of
Lots 1 and 5.
J. STAFF RECOMMENDATION:
Staff recommends approval of the PCD subject to compliance with the comments
and conditions outlined in paragraphs D, E, and F and the staff analysis in the
agenda staff report.
10
Z-4470-M (Cont_
PLANNING COMMISSION ACTION: (MAY 14, 2020)
The applicant was present. There were no persons present registered in support or
opposition. Staff presented the item and a recommendation of approval as outlined in the
"staff recommendation" above. There was no further discussion. The item was placed
on the consent agenda and approved as recommended by staff, including all staff
comments and conditions. The vote was 10 ayes, 0 noes and 1 absent.
11