Loading...
HomeMy WebLinkAboutZ-4411-C Map 8GENERAL SITE UTILITY CONSTRUCTION NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR DETAILS GRADING AT BUILDINGS, STEPS, WALKS, WALLS AND OTHER STRUCTURES. 2. FINISH CONTOURS AND GRADES SHOWN ARE FOR FINISHED SURFACES, ALLOWANCES SHALL BE MADE FOR PAVEMENTS, SLABS, TOPSOIL, SOD, ETC. UNIFORM PLANES AND SURFACES SHALL BE SHAPED BETWEEN FINISHED SPOT ELEVATIONS AND/OR FINISH CONTOURS SHOWN. MINIMUM PAVEMENT SLOPES SHALL BE 1%, MINIMUM FINISH SLOPES ON GRASS OR SOD SURFACES SHALL BE 1%, MINIMUM LONGITUDINAL CONCRETE CURB & GUTTER SLOPE SHALL BE 0.6%, SPILLOUT CURB SHALL BE USED ON THE HIGH SIDE OF PAVEMENT AND AT DISCHARGE POINTS. 3. THE CONTRACTOR SHALL CONTROL EROSION ON THE SITE. ALL SLOPES SHALL BE FERTILIZED, SEEDED AND MULCHED (OR LANDSCAPED) AS SOON AS POSSIBLE. THE CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE ARKANSAS DPC&E. THE SITE SHALL BE GRADED TO MAINTAIN POSITIVE DRAINAGE DURING CONSTRUCTION. WATER SHALL NOT BE ALLOWED TO POND. 4, ALL AREAS TO BE CUT OR FILLED SHALL BE CLEARED AND GRUBBED. THE MAXIMUM FILL SLOPE SHALL BE 3:1. ALL FILLS SHALL BE MADE IN 8' LIFTS AND COMPACTED, AT OPTIMUM MOISTURE CONTENT TO 95% OF MODIFIED PROCTOR DENSITY (ASTM D-1557), AS DETERMINED BY IN—PLACE DENSITY TESTS. BORROW AND FILL MATERIAL SHALL BE SELECT CLAY SAND OR SANDY CLAY HAVING A LIQUID LIMIT LESS THAN 40 OR OTHER APPROVED FILL. FILL SOILS CLASSIFYING AS SC OR GC ACCORDING TO THE UNIFIED SOILS CLASSIFICATION SYSTEM ARE CONSIDERED SUITABLE. SHALE MATERIAL USED IN FILL SHALL BE COMPACTED AT 3% ABOVE OPTIMUM MOISTURE CONTENT WITH A VIBRATORY SHEEPS FOOT COMPACTOR. 5. THE CONTRACTOR SHALL COORDINATE WITH EACH UTILITY COMPANY PRIOR TO ANY EXCAVATION. ANY DAMAGE TO UTILITY LINES CAUSED BY THE CONTRACTORS OPERATIONS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. THE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL ALIGNMENT OF EXISTING AND PROPOSED STORM SEWER, SANITARY SEWER AND WATER LINES TO ENSURE THAT THEY ARE INSTALLED WITH ADEQUATE COVER AND CLEARANCE . ALL ROUGH GRADING SHALL BE COMPLETE BEFORE INSTALLATION OF STORM SEWER, SANITARY SEWER AND APPURTENANCES, WATER MAINS, SERVICES AND APPURTENANCES. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED WITH SELECT MATERIAL AS SPECIFIED IN NOTE /4 ABOVE. 6. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES AND ORDINANCES GOVERNING WORK OF THIS TYPE. 7. THE INSTALLATION OF ALL CULVERT PIPE TO BE IN ACCORDANCE WITH AHTD SPECIFICATIONS. 8. ALL EXISTING IMPROVEMENTS WHICH INTERFERE WITH THE WORK, AND ARE NOT TO BE SAVED SHALL BE REMOVED AND DISPOSED OF. IMPROVEMENTS IN THE RIGHT—OF—WAY WHICH ARE TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. 9. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III WITH BELL AND SPIGOT TYPE JOINTS. PIPE, MATERIAL AND INSTALLATION SHALL BE IN CONFORMANCE WITH APPLICABLE ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT (AHTD) STANDARD CONSTRUCTION SPECIFICATIONS. 10. ALL CORRUGATED METAL PIPE SHALL MEET OR EXCEED AHTD REQUIREMENTS FOR GAUGE AND CORRUGATION AND SHALL BE POLYMER COATED IN ACCORDANCE WITH ASTM A-742 AND AASHTO M-246. THE LAST 12' OF EACH LENGTH SHALL BE RECORRUGATED WITH ANNULAR CORRUGATIONS TO ACCEPT CORRUGATED COUPLING BANDS. 11. ALL WATER MAINS AND SEWER MAINS AND THEIR APPURTENANCES INCLUDING INSTALLATION, SHALL COMPLY WITH THE LATEST LITTLE ROCK MUNICIPAL WATER WORKS AND LITTLE ROCK WASTEWATER UTILITY SPECIFICATIONS. CONNECTIONS SHALL NOT BE MADE TO EXISTING LINES UNTIL NEW CONSTRUCTION HAS BEEN TESTED AND APPROVED BY THE UTILI 12. THE CONTRACTORS ATTENTION IS SPECIFICALLY CALLED TO THE LOCATION OF THE EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DAMAGING ANY NEXISTING IMPROVEMENTS WHICH ARE TO REMAIN. PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL REVIEW THE PLANS AND SPECIFICATIONS. HE SHALL VISIT THE SITE AND INSPECT THE CONDITION OF THE SITE AND THE ADJACENT IMPROVEMENTS. 13. THE CONTRACTOR SHALL CALL 'ONE—CALL` FOR LOCATION OF ALL UTILITIES PRIOR TO COMMENCEMENT OF ANY EXCAVATION. 14. ANY EXCESS EXCAVATED MATERIAL, NOT REQUIRED FOR CONSTRUCTION OF FILLS SHALL BE PLACED IN LOW AREAS ADJACENT TO THE SITE. GENERAL UTILITY NOTES 1. The latest "Standard Pipeline Specifictions of the Little Rock Municipal Works shall apply. 2. The latest "Specification Requirements for Sanitary Sewer® of the Littl Rock Waste Water Utility shall apply. 3. The contractor shall locate all existing utilities before beginning constuction. 4. Maintain 10' minimun horizontal separation between water and sanitary sewer lines. 5. The contractor shall verify horizontal and vertical alignment of storm sewer, sanitary sewer, and water lines to ensure that they are installer with adequate cover and clearance. Rough grading shall be complete t installation of storm sewer, sanitary sewer, water mains, and service. 6. The contractor shall make connection to existing sanitary sewer and w mains are cleaned, tested, and construction approved by ulility inspect( 7. All fills are to be made in 8* lifts and compacted to 95' of modified proctor denisity (ASTM D-1557), as determined by inplace denisity test In transition areas between cuts and fills the top li in the cut shall 1 broken and compacted to a minimun of 95% modified proctor denisity. 8. The contractor shall coordinate with each utility company prior to any excavation. Any damage to existing utility lines caused by contarctor's operations shall be repaired at the contractors expense. 9. Concrete shall have a minimun 28 day compressive strengh of 3000 1 noted. 10. All reinforcong steel shall be grade 40 unless noted. r` rn rn Cu Cu v 0 Cu M, 0 KEY MAP VV111.1L1111L.I�1fl�tYl lL /Cs1lUiY � 11l�Y1Y®1L11i'Sl 1l 1CILYy 11LV CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING(Lo PLEASANT RIDGE 401 VICTORY STREET LITTLE ROCK, ARKANSAS 72201 Survey By: Drawn By: Chooked By: Approved By: LITTLE ROCK, ARKANSAS