HomeMy WebLinkAboutZ-4403-I Staff AnalysisFILE NO.: S-1710 (Z-4403-1
NAME: The Preserve at Aldersgate Subdivision Site Plan Review/Short-form PD -R
LOCATION: Located at 1303 and 1310 Aldersgate Road
DEVELOPER:
Universal Housing Group, LLC
P.O. Box 241667
Little Rock, AR 72223
ENGINEER:
McGetrick and McGetrick Engineers
P.O. Box 30441
Little Rock, AR 72260
AREA: 2.0 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
CURRENT ZONING: MF -24
PLANNING DISTRICT: 11 - 1-430
CENSUS TRACT: 24.08
VARIANCE/WAIVERS: A variance from Section 36-522(a)(3) to allow the street buffer
along 1-430 less than the 30 -foot minimum requirement.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The request is to allow a rezoning to PD -R for property located in the 1300 Block
of Aldersgate Road. The site contains 2.0 acres and is currently zoned MF -24.
The developer is proposing to build three (3) buildings of multi -family housing.
Two of the buildings are proposed with 12 -units and one is proposed with
24 -units. The proposal includes the construction of a 2,080 square foot
clubhouse with a pool. The buildings are proposed three -stories in height.
The survey provided by the applicant indicates the ownership to the centerline of
Aldersgate Road. It was determined during the Subdivision Committee review
the application should be amended from a site plan review to a Planned
FILE NO.: S-1710 Z-4403-1) (Cont.
Development Residential to allow for the density as proposed with the available
land area once the right of way was dedicated to the public.
B. EXISTING CONDITIONS:
The property is located on the West side of Aldersgate Road just south of Kanis
Road and abutting to 1-430. There is a single-family home with a pool located on
the site. This section of Aldergate Road is currently redeveloping with office and
residential uses. Across Aldersgate is a medical office/rehab clinic which has
completed the street improvements to Aldersgate Road including curb, gutter and
sidewalk. South of the site, also on the east side of Aldersgate Road, are three
(3) office buildings which have also completed street improvements to Aldersgate
Road. Immediately south of the site is a property zoned POD which was
approved to allow the use of one of the structures on the site for the sale of
oriental rugs.
C. NEIGHBORHOOD COMMENTS.-
As
OMMENTS:
As of this writing, staff has received several informational phone calls from area
residents concerning the proposed request. All property owners located within
200 -feet of the site along with the John Barrow Neighborhood Association were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to the streets including
5 -foot sidewalk with the planned development. The new back of curb should
be 31 -feet from the back of curb on the east side of the street.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
3. Aldersgate Road is classified on the Master Street Plan as a collector street.
A dedication of right-of-way 30 feet from centerline will be required.
4. Stormwater detention ordinance applies to this property.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
6. All driveways shall be concrete aprons per City Ordinance.
7. Erosion controls must be installed to reduce discharge of polluted stormwater.
2
FILE NO.: S-1710 (Z-4403-1) (Cont.
8. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
9. Per City Code, chlorinated pool water cannot be discharged into the City of
Little Rock stormwater drainage.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNI
Wastewater: Sewer main extension required with easements for this project.
Capacity Contribution Analysis required for all multi -family projects. Contact
Little Rock Wastewater for additional information.
Entergy: Approved as submitted.
Center -Point Enerpv: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
4. Contact Central Arkansas Water regarding the size and location of the water
meter.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
3
FILE NO.: S-1710 1Z-4403-1
7. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
8. The facilities on-site will be private. When meters are planned off private
lines. Private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
CATA: Located directly on the #3 Baptist bus route off Kanis Road.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirement.
2. Street trees and shrubs will be required per Chapter 15, the Landscape
Ordinance, to screen the parking area along Aldersgate Road.
3. An automatic irrigation system to water landscaped areas will be required.
4. Prior to the issuance of a building permit, it will be necessary to provide
landscape plans stamped with the seal of a registered landscape architect.
5. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). Interior islands must be a minimum of one hundred and fifty (150)
square feet in area to qualify and be seven and one half (7 Y2) feet in width.
4
FILE NO.: S-1710 (Z-4403-1) (Cont.
6. A small amount of building landscaping will be required.
7. The Zoning Ordinance requires a street buffer along 1-430 of a minimum of
30 -feet. The plan appears to encroach into the required buffer area.
G. SUBDIVISION COMMITTEE COMMENT:
(September 11, 2013)
The applicant was present representing the request. Staff presented an
overview of the development stating there were additional items necessary to
complete the review process. Staff requested the applicant provide the building
height for the new construction. Staff stated the setbacks from the perimeter
property lines was to equal the height of the proposed buildings. Staff requested
information concerning the construction materials of the proposed buildings
including the proposed dumpster screening. Staff noted the dumpster was
indicated within the front setback along Aldersgate Road. Staff stated there were
variances associated with the request including a reduced number of parking
spaces and an encroachment into the 30 -foot landscape strip which was required
along 1-430. Staff stated there would also be a variance to allow a reduced
setback from the northern, western and southern perimeters.
Public Works comments were addressed. Staff stated street improvements to
Aldersgate Road would be required with the development of the site. Staff stated
the new back of curb should be 31 -feet from the back of curb on the east side of
the street. Staff stated the City's Stormwater Detention Ordinance would apply to
the development of the site. Staff also stated no chlorinated pool water could be
discharged into the City's stormwater drainage system.
Landscaping comments were addressed. Staff stated a landscape plan stamped
with the seal of a registered architect would be required at the time of building
permit. Staff also stated an automatic irrigation system would be required to
water landscaped areas on the site. Staff noted a minimum of eight percent (8%)
of the interior paved area was to be landscaped with islands a minimum of 150 -
square feet in area would be required. Staff also noted the street buffer along
Aldersgate Road as indicated was acceptable to meet the minimum requirement
of the City's Landscape and Buffer Ordinances.
Staff noted the property description described the property to the centerline of
Aldersgate Road. Staff stated based on the legal description the site did contain
2.0 -acres but once the right of way was dedicated the lot would contain
1.688 acres which would result in a density of 28.4 units per acre. Staff stated
the application should be amended to a Planned Development (PD -R) to allow
the development of the multi -family as proposed.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
5
FILE NO.: S-1710 Z-4403-1) Cont.
H. ANALYSIS:
The applicant submitted a revised site plan and cover letter to staff addressing
the issues raised at the September 11, 2013, Subdivision Committee meeting.
The application request has been amended to a Planned Development
Residential to allow the development at the density proposed by the applicant
once the right of way is dedicated to the City. The site contains 2.0 acres but
once the right of way is dedicated the lot will contain 1.69 acres which results in a
density of 28.4 units per acre.
The developer is proposing to build three (3) buildings of multi -family housing.
Two of the buildings are proposed with 12 -units and one is proposed with
24 -units. The proposal includes the construction of a 2,080 square foot
clubhouse with a pool. The buildings are proposed three -stories in height with a
maximum building height of 40 -feet.
The request includes a reduction in the number of parking spaces typically
required to serve the development. The site plan indicates 67 -spaces. The
ordinance would typically require the placement of 1 1/2 spaces per unit or a total
of 72 parking spaces. The applicant has indicated up to 50 percent of the
parking spaces will be covered.
The request also includes a variation from Section 36-522(a)(3) which states,
Street buffers shall be a minimum of thirty (30) feet in width when abutting an
expressway except within the mature area. The plan indicates portions of the
buffer along 1-430 reduced to 15 -feet near the northwest portion of the site. The
pool is also proposed within the 30 -foot buffer along 1-430. Within the buffer area
the applicant is proposing to provide up to 1 '/ times the amount of landscaping
typically required in this area to off -set the encroachment.
The units are proposed with a maximum building height of 40 -feet. The MF -24
zoning district typically requires the interior yard setback to be equal to the height
of the building. The building setback along the north and south perimeters is
15 -feet. The setback along 1-430 is reduced to 15 -feet along the northwestern
portion of the development. The applicant has indicated the development is an
upscale, luxury community with unit sizes and amenities comparable to similar
developments in the area. The yard setbacks are reduced to accommodate
these features. The applicant has indicated a commitment to provide additional
trees and larger size greenery than the amount typically required by City
ordinance.
The total building area is approximately 65,592 square feet. The total building
coverage is approximately 23,536 square feet. The proposed clubhouse
amenities include a guest lounge, fitness center, business center, poolside grill(s)
and theatre room.
0
FILE NO.: S-1710 (Z -4403-I) (Cont.
The request is for signage not to exceed six (6) feet in height and 85 square feet
in area. The applicant has indicated berming may be used to elevate the sign for
visibility.
The construction is proposed in two (2) phases. The proposed construction
materials consist of a combination hardi-plank/board, brick and/or stone. The
proposed roofing material is asphalt architectural shingles and the roof pitch is
approximately 6:12. The proposed dumpster screening will be of similar exterior
materials as the development's main buildings and/or clubhouse. The dumpster
enclosure is proposed with a durable gate made of iron or steel. The perimeter
fencing is proposed as decorative iron/vinyl and approximately six (6) feet in
height located around the sites perimeters.
Staff has concerns with the development as proposed. The development is
proposed as two (2) bedroom two (2) bath units with 1,000 — 1,200 square feet.
Based on the unit size and number of bedrooms staff does not feel the parking
will be adequate to serve the development. In addition the street buffer along
1-430 is indicated less than typical ordinance standard. The Landscape
Ordinance allows for a transfer of up to 25 -percent of the required perimeter
landscape strip to another area of the site. A variance from this provision
requires approval from the City Beautiful Commission. Based on the site plan
and site configuration staff does not feel the development can meet this criteria.
In addition, the building setbacks along the northern, southern and western
perimeters are not in compliance with the typical ordinance standards for the
underlying zoning.
STAFF RECOMMENDATION:
Staff recommends denial of the request as filed.
PLANNING COMMISSION ACTION: (OCTOBER 3, 2013)
The applicant was present. There was one registered objector present. The Chair
informed the applicant there were eight (8) Commissioners present. The Chair stated it
was the Commission's practice that when fewer than nine (9) Commissioners were
present the applicant was offered the option of deferral to a later meeting to allow more
members to be present to hear the request. The Chair stated for an item to be
approved six (6) positive votes were required.
Mr. Pat McGetrick requested a deferral of the item.
The Chair informed Mr. McGetrick the item would be deferred to the November 14,
2013, Subdivision Hearing. A motion was made to approve the deferral request. The
motion carried by a vote of 8 ayes, 0 noes, 2 absent and 1 open position.
7
FILE NO.: S-1710 (Z-4403-1) (Cont.
STAFF UPDATE:
There has been no change to the application request since the previous public hearing.
Staff continues to recommend denial of the request.
PLANNING COMMISSION ACTION; (NOVEMBER 14, 2013)
Mr. Pat McGetrick, Mr. AJ Gilbert and Ms. Gwinn Gilbert were present representing the
request. There was one registered objector present. Staff presented the item stating
the application was originally filed as a subdivision site plan review to allow the
development of multi -family on a 2 -acre parcel zoned MF -24. Staff stated during the
review process it was determined the application should be amended to a Planned
Development due to the right of way for Aldersgate Road being included in the legal
description of the property. Staff stated once the right of way was dedicated the
ownership would be less than 2 -acres resulting in an overall density over 24 -units per
acre. Staff stated there were three primary concerns with the proposed development.
Staff stated their concerns were lack of parking to meet the typical minimum ordinance
requirements, the intrusion on the Interstate buffer and the proposed setbacks from the
adjacent property lines. Staff presented a recommendation of denial.
Mr. Pat McGetrick addressed the Commission on behalf of the developers. He stated
the developers intended to develop the site with an upscale residential development.
He stated the development would contain a mix of one and two bedroom units. He
stated he felt the parking would be adequate to serve the units. He stated in the area
the plan was intruding into the Interstate buffer the applicant intended to add additional
plantings at one and one-half times the typical ordinance requirements. He stated he
did not feel the setbacks from the northern and southern property lines would adversely
impact the adjacent properties. He stated these properties would most likely redevelop
with non -single-family uses.
Mr. AJ Gilbert addressed the Commission on the merits of the request. He provided the
Commission with elevations for the proposed buildings. He also stated the materials
would be high quality materials including brick, stone, hardi-board. He stated due to the
dedication of right of way this created a hardship for developing the site. He stated the
survey indicated the property containing 2 -acres but upon dedication the ownership
would actually be 1.6 -acres. He stated the approval of the PD -R would allow for
development of multi -family at the density proposed.
Ms. Gwinn Gilbert addressed the Commission on the merits of the request. She stated
with the approval a dedication of 30 -feet from centerline would be provided to the City
as right of way. She stated with the amenities proposed for the development it
was important to provide the density as proposed. She stated based on the
development providing one and two bedroom units she felt the parking would be
adequate. She stated the target market was young professionals, small families,
persons working in the nearby medical offices, clinics and hospitals. She stated
she felt few of the residents would have more than one vehicle. She stated within the
FILE NO.: S-1710 (Z-4403-1) (Cont.
landscape area additional plantings would be provided. She stated the proposal
included additional plantings at one and one-half times the typical ordinance
requirement. She stated she felt this would off -set the encroachment into the buffers.
She stated they were requesting to develop the property as it was currently zoned which
was multi -family.
Ms. Ruth Bell, League of Women Voters, addressed the Commission in opposition of
the request. She stated the parking and the buffer were two primary concerns of the
League. She stated the parking would be a self-correcting problem. She stated if there
was not sufficient parking the residents would leave the development. She stated the
buffer was a bigger concern. She stated the Interstate buffer requirement was put into
the Zoning and Landscape Ordinances for a reason. She stated 15 -feet of spacing from
a residence to the Interstate was not a sufficient setback. She stated Interstates were
noisy and the additional buffering would allow for a decrease in the noise. She stated
additional landscaping would help but the additional setback would make the
development more livable.
Mr. McGetrick stated only a small portion of the residential units encroached into the
buffer. He stated the majority of the development was providing the required buffer. He
stated the additional plantings would help off-site the noise. He stated 30 -feet to 15 -feet
was not significantly different when you were addressing noise and sound.
Commissioner Pierce questioned Mr. McGetrick as to the location of the existing homes
located on the site. Mr. McGetrick stated the homes were located within the 30 -foot
buffer area.
Commissioner Nunnley questioned staff as to why the ordinances included the provision
for the Interstate buffer. Staff stated they were not sure but felt the buffer was included
during the rewrite of the Landscape Ordinance several years earlier. Staff stated during
the process they felt the Committee members and ultimately the City felt it was
important to provide a landscape buffer along the City's Interstate frontages. Staff
stated they did not feel the reason for the buffer was noise but to provide additional
landscaping along the Interstates.
There was a general discussion concerning the buffering and the existing conditions of
the site. Mr. McGetrick stated the area was heavily wooded and with the additional
landscaping this would dampen the noise level for the residents.
A motion was made to approve the request including all staff recommendations and
comments except that of denial. The motion carried by a vote of 8 ayes, 0 noes,
2 absent and 1 open position.
NO.: 4. S-1710
NAME: The Preserve at Aldersgate Subdivision Site Plan Review
LOCATION: located at 1303 and 1310 Aldersgate Road
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than September 18, 2013. The Office of Planning and Development
must receive the proof of notice no later than September 27, 2013.
2. The survey indicates ownership to the centerline of the adjacent street. Please have
the surveyor verify this is indeed the ownership for this parcel.
3. Provide the total building area and total building coverage.
4. Provide details of any proposed signage. The Ordinance allows multi -family
developments six (6) feet in height and twenty-four (24) square feet in area.
5. Provide the maximum building height proposed for the buildings. The Zoning District
allows a maximum building height of 35 -feet.
6. The Zoning Ordinance requires the interior yard setback to be equal to the height of
the building.
7. The dumpster is located within the front yard setback. Provide details of the
proposed dumpster screening, construction materials, height.
8. The Zoning Ordinance requires a minimum of 1,800 square feet per family for MF -24
zoned property. The plan as indicated with the 2.0 acres of ownership does meet
this requirement.
9. Will any of the existing improvements on-site remain? (house, pool)
10. The Zoning Ordinance requires a street buffer along 1-430 of a minimum of 30 -feet.
The plan appears to encroach into the required buffer area.
11. The Zoning Ordinance typically requires 1 Y2 parking spaces per unit of multi -family
housing. The plan indicates 48 units which would typically require the placement of
72 parking spaces. The plan indicates 67 parking spaces.
12.AI1 site lighting must be low level and directional, directed downward and into the
site.
13. Will the site include any perimeter fencing? If so note the location of the proposed
fencing along with a note indicating the total height and construction material.
14. Provide a phasing plan for the proposed development. Will the buildings/parking be
constructed in multiple phases or as one single development?
15. Provide the proposed building materials, roof materials, roof pitch.
Variance/Waivers:
Item 4 4.
1. A variance from Section 36-522(a)(3) to allow the street buffer along 1-430 less than
the 30 -foot minimum requirement.
2. A variance from Section 36-502 to allow the development to provide parking at a
lesser number than typically allowed per the ordinance. (67 provided — 72 required)
Public Works Conditions:
1. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to the streets including 5 -foot sidewalk
with the planned development. The new back of curb should be 31 -feet from the
back of curb on the east side of the street.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
3. Aldersgate Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
4. Stormwater detention ordinance applies to this property.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
6. All driveways shall be concrete aprons per City Ordinance.
7. Erosion controls must be installed to reduce discharge of polluted stormwater.
8. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
9. Per City Code, chlorinated pool water cannot be discharged into the City of Little
Rock stormwater drainage.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements for this project. Capacity
Contribution Analysis required for all multi -family projects. Contact Little Rock
Wastewater for additional information.
Entergy: Approved as submitted.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
Item # 4.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
4. Contact Central Arkansas Water regarding the size and location of the water meter.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
8. The facilities on-site will be private. When meters are planned off private lines.
Private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line agreement
is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
County Plinning: No comment.
CATA: Located directly on the #3 Baptist bus route off Kanis Road.
Parks and Recreation: No comment received.
Plannin Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirement.
Item 4 4.
2. Street trees and shrubs will be required per Chapter 15, the Landscape Ordinance,
the screen the parking area along Aldersgate Road.
3. An automatic irrigation system to water landscaped areas will be required.
4. Prior to the issuance of a building permit, it will be necessary to provide landscape
plans stamped with the seal of a registered landscape architect.
5. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s).
Interior islands must be a minimum of one hundred and fifty (150) square feet in
area to qualify and be seven and one half (7'/) feet in width.
6. A small amount of building landscaping will be required.
7. The Zoning Ordinance requires a street buffer along 1-430 of a minimum of 30 -feet.
The plan appears to encroach into the required buffer area.
Revised Plat/plan, Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, September 18, 2013.
Item # 4.