Loading...
HomeMy WebLinkAboutZ-4376-A Map 10I f--- UTILITY & pL18L1G ACCESS ,rr % / SANITARY SEWER . t E.L,EV. FL=254,31 ELEV, TOP -263.35 t F f , ff/ t ! r � HANDICAP EXIST. DRIV �$0 HAVE 0.1- RAMP LIP AT GUT TERAEs.R CITY F LITTLE ROCK S NRARDS, 5' CON ittU SIDEWALK Q "�., — - f HANDICAP R10.00' RAMP 10' UTILITY EASEMENT /' SCO "^��,,� ''`•tel 6•p4� ONCRETE` PAVING ONE CANTRELL CENTER 'Q. almV 5 STORY BRICK BUILDING /iAY F.F. ELEV.=266.03 GRASS 1T f RAMP, r S 4v"R � ,�AKPHAvr 4r r° STORM DRA;N CURBSLEI ELEV. F' _7.03 Ei-FV. TOP= 2b4 SANITARY SEWERf% MANHOLE ELEV, F's.w25i',.Sa ELEV, TOP=265.4-3 HAND RAMP STORM DPAIN CURB INLkt ELEV. PL=262.07 ELEV, 6P-266.11 0 DIMEINISIO�� �� �. PLk 71 SCALE: 1 " = 20' GRASS ASPF r--50' LITTLE ROCK MUNICIPAL. -� WATER 'WORKS EASEMENT SANITARY SEWER �` MANHOLE —7 / q "°.'",�.,�... ELLV. OP= 647.2 \ 'bQft ��I \ ' / 57ORM DRAIN O T CURES INLET ELPI. FL=260 0 ELEE'V, TOP=2-65 8 Ai/ UTILITY & PUBLIC ACCESS EASEMENT 6" CONCRETE e � e I-4" CRUSHED AGGREGATE BASE COURSE, CL.7 8" (MIN) COMPACTED SUBGRADE TO 95% STANDARD PROCTOR DENSITY. TYPICAL SECTION CONCRETE APRONS NTS 4"'� 2" RADIUS J/ /4" LIP 122" "I �24"— CONCRETE CURB CLASS 3 & -4_ UPRIGHT DETAIL NTS NOTE: HANDICAP RAMPS TO BE CONSTRUCTED ACCORDING TO ADA GUIDELINES & PER CITY OF LITTLE ROCK DETAILS & INSPECTIONS, GENERAL NOTES: 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY, THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION, 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGE OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION ?ROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 5. CONTRACTORS SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 6. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE A GRAVEL BASE TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER, A RATE OF 135 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 7. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 8. AFTER NEW INLETS ARE CONSTRUCTED, STRAW BALES AND GRAVEL FILTER BERMS ARE TO BE PLACED TO ALLOW FLOW THROUGH THE BERM. 9. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS. 10. CONTRACTOR IS TO PROTECT EXISTING STORM DRAINAGE SYSTEM. Ir %p/#y-t' 14 Are YY - h f, OA 'V v f '�l CA �. V x/16`7 -P3 41 NORTH 20 10 0 20 40 SCALE G:\02-123\DESIGN\02123SITE,DWG DEVELOPMENT CONSULTANTS INCORPORATED 2200 NO. RODNEY PARHAM RD. SUITE 220 LITTLE ROCK, ARKANSAS 72212 ENGINEERING PLANNING LAND SURVEYING LANDSCAPE ARCHITECTURE lT. r COPYRIGHT Lu h SCALE 1" = 20" • DRAWN BY DRP CHECKED BY: JEE APPROVED BY DATE 10-9-02 lT. r • Lu a ui c Lu 0 IZA se • . - o ,. 02-123 C-1