HomeMy WebLinkAboutZ-4348 Staff AnalysisDecember 18, 1984
Item No. G - Z-4348
Owner: First Federal Service Corporation
Applicant: John A. Castin
Location: East End of Tall Timber Blvd.
Request: Rezone from "R-2" Single Family to
"R-3" Single Family
Purpose: Single Family
Size: 30.18 acres
Existing Use: Vacant
SURROUNDING LAND USE AND ZONING:
North - Vacant, Zoned "R-2"
South - Vacant and Single Family, Unclassified
East - Hindman Park, Zoned "R-2"
West - Vacant and Single Family, Zoned "R-2"
PLANNING CONSIDERATIONS:
1. The proposal is to rezone approximately 30 acres to
"R-3" which is the City's small lot single family
district. In the "R-3" district, the minimum lot area
is 5,000 square feet vs. 7,000 square feet in the
"R-2." The minimum lot depth of 100 feet is the same
in both "R-2" and "R-3," but the minimum lot width is
60' in "R-2" and 50' in "R-3." In addition to those
differences, two family residences are permitted as a
conditional use in the "R-3" district, but the minimum
lot size is 7,000 square feet. The Zoning Ordinance
states that the "R-3" district is "established an order
to provide for an appropriate district for the existing
developed areas occupied by smaller scale single family
housing, and it is intended that this district be
utilized for new construction only within the existing
urban area and especially for infill development." It
can be questioned as to whether the land being
considered for rezoning is within the existing
developed urban area. From the staff's viewpoint, this
does not appear to be a major issue, but needed to be
mentioned. Normally, the existing "R-3" areas are
found to the east of University. To the north of this
area, much of what is considered the John Barrow
neighborhood, is zoned "R-3." The 30 acre tract is
adjacent to a partially developed subdivision so it can
December 18, 1984
Item No. G - Continued
be argued that the location is not totally removed from
the existing developing urban area. The "R-3" district
could also be viewed as one method for providing
affordable housing because of the small lot provision,
and this is something that the City has been trying to
encourage recently.
2. The entire site is vacant and wooded with some slope to
it. The land increases in elevation from north to
south. The property on the north side of what would be
the extension of Tall Timber Blvd. has some floodway
and floodplain involvement.
3. There are no right-of-way requirements or Master Street
Plan issues associated with this request.
4. There have been no adverse comments received from the
reviewing agencies as of this writing.
5. There are no legal issues.
6. Based on the calls that staff has received from the
residents in the existing Pecan Lake Subdivision, there
is significant neighborhood opposition to the proposed
11R-3" rezoning. There is no documented history on the
site.
7. Staff does not feel that an "R-3" rezoning for this
type of an area is inappropriate and supports the
request. It does not appear that the rezoning will
significantly impact the "R-2" subdivision to the west
because of a similar platting arrangement and the
proposed lots are larger than the "R-3" minimum. There
are some issues that should be resolved prior to final
action being taken on the rezoning request. The most
significant one is the status of the property north of
the extension of Tall Timber Blvd. The Master Parks
Plan identifies that area as proposed park land. The
City's Park Department will provide additional
information on this issue at a later date. Staff's
position is that the area included on the Parks Plan
should be left unplatted and made part of the City's
parks system through whatever mechanism is feasible.
Also, the floodway/floodplain is involved with this
tract north of the Tall Timber Blvd. extension. A
preliminary plat has been filed for the west 5.5 acres
only and not the entire 30 acres as required by the
Subdivision Ordinance. The Subdivision Ordinance
states that a preliminary plat be filed for all land
December 18, 1984
Item No. G - Continued
under one ownership. This allows
review of the proposal including
general design considerations. A
consider at this time is to only
for which a plat has been filed o
type of plat be presented for all
STAFF RECOMMENDATION:
a more thorough
circulation and
possible option to
rezone the 5.5 acres
r request that some
30 acres.
Staff recommends approval of the request subject to the
resolutions of the issues identified in staff analysis.
PLANNING COMMISSION ACTION:
The applicant, Jack Castin, was present and representing the
owner, First Federal Service Corporation. There were a
number of persons in attendance opposing the requested
rezoning. Mr. Castin spoke and stated that the plans were
to only have single family homes. He then presented a map
and discussed the preliminary plat for 5.5 acres which is to
be the first phase. Mr. Castin stated that none of the
property was in the floodway and that they would consider
deleting the area in the floodplain from the "R-3" request.
This land north of Tall Timber Boulevard extension could
possibly be made available to the City for use as a park
Mr. Castin indicated. He then went on to say if the "R-3"
zoning was accomplished, lots would be approximately 20
percent less than lots in an "R-2" subdivision. Sarah
Bradshaw of the adjoining Pecan Lake development requested
the Planning Commission to postpone action on the request
until the Property Owners' Association had more time to
review the proposal. She went on to say that there was a
petition with 250+ signatures opposed to the request, and
her concerns were lower property values, smaller lots than
in the existing subdivision, duplexes were permitted as a
conditional use in "R-3" and increased traffic. Mr. James
McLeod, president of the Property Owners' Association spoke
against the rezoning and presented the petition to the
Planning Commission. Mr. Harley stated that he was opposed
to anything less than "R-2" zoning. Ed Billings was
concerned with an orderly development, the quality of life
and property values in the existing subdivision. He also
expressed a number of uncertainties with the proposal.
Ernie Matkin of Superior Federal was concerned with possible
duplexes and voiced some objection to the "R-3" proposal
because of that possibility. Mr. Castin spoke again and
indicated that Tall Timber Boulevard was a collector on
December 18, 1984
Item No. G - Continued
the Master Street Plan. He said in the first phase, 5.5
acres, 21 lots were platted with an average lot size of
6,000 square feet. He also indicated that there would be
approximately 160 lots in the entire development.
Mr. Castin said that he could not make any assurances that
there would not be any duplexes in the remaining 25 acres.
There was a lengthy discussion about the total number of
units that could be developed in an "R-2" project versus an
"R-3" development. Mr. Castin said that the owners could
accept the rezoning to "R-3" on only the first phase and
suggested that additional time for further study of certain
issues might be beneficial. After more comments, a motion
was made to defer the Item to the December 18, 1984,
meeting. Mr. Castin agreed to the deferral. The motion
passed by a vote of 8 ayes, 0 noes, 2 absent and 1
abstention (Richard Massie).
PLANNING COMMISSION ACTION:
(12/18/84)
The applicant, Jack Castin, was present. There was one
objector present. Mr. Castin spoke and discussed the
preliminary plat and the proposed rezoning plat. He also
indicated that the Parks Department's proposal for park land
was 150' from the centerline of Brodie Creek.
James McCleod, president of the Pecan Lake Property Owners
Association, addressed the Commission and said that they
were still totally opposed to the rezoning. Mr. McCleod
again described the objections that were mentioned at the
previous hearing such as impact on property values and
duplexes being a conditional use in the "R-3" district.
After additional comments, the Planning Commission voted to
recommend approval of the request subject to the Parks
Department approval. The vote: 9 ayes, 0 noes, 0 absent
and 1 abstention (Richard Massie).
October 30, 1984
Item No. 14 - Z-4348
Owner: First Federal Service Corporation
Applicant: John A. Castin
Location: East End of Tall Timber Blvd.
Request: Rezone from "R-2" Single Family to
"R-3" Single Family
Purpose: Single Family
Size: 30.18 acres
Existing Use: Vacant
SURROUNDING LAND USE AND ZONING:
North - Vacant, Zoned "R-2"
South - Vacant and Single Family, Unclassified
East - Hindman Park, Zoned "R-2"
West - Vacant and Single Family, Zoned "R-2"
PLANNING CONSIDERATIONS:
1. The proposal is to rezone approximately 30 acres to
"R-3" which is the City's small lot single family
district. In the "R-3" district, the minimum lot area
is 5,000 square feet vs. 7,000 square feet in the
"R-2." The minimum lot depth of 100 feet is the same
in both "R-2" and "R-3," but the minimum lot width is
60' in "R-2" and 50' in "R-3." In addition to those
differences, two family residences are permitted as a
conditional use in the "R-3" district, but the minimum
lot size is 7,000 square feet. The Zoning Ordinance
states that the "R-3" district is "established an order
to provide for an appropriate district for the existing
developed areas occupied by smaller scale single family
housing, and it is intended that this district be
utilized for new construction only within the existing
urban area and especially for infill development." It
can be questioned as to whether the land being
considered for rezoning is within the existing
developed urban area. From the staff's viewpoint, this
does not appear to be a major issue, but needed to be
mentioned. Normally, the existing "R-3" areas are
found to the east of University. To the north of this
area, much of what is considered the John Barrow
neighborhood, is zoned "R-3." The 30 acre tract is
adjacent to a partially developed subdivision so it can
October 30, 1984
Item No. 14 - Continued
be argued that the location is not totally removed from
the existing developing urban area. The "R-3" district
could also be viewed as one method for providing
affordable housing because of the small lot provision,
and this is something that the City has been trying to
encourage recently.
2. The entire site is vacant and wooded with some slope to
it. The land increases in elevation from north to
south. The property on the north side of what would be
the extension of Tall Timber Blvd. has some floodway
and floodplain involvement.
3. There are no right-of-way requirements or Master Street
Plan issues associated with this request.
4. There have been no adverse comments received from the
reviewing agencies as of this writing.
5. There are no legal issues.
6. Based on the calls that staff has received from the
residents in the existing Pecan Lake Subdivision, there
is significant neighborhood opposition to the proposed
11R-3" rezoning. There is no documented history on the
site.
7. Staff does not feel that an "R-3" rezoning for this
type of an area is inappropriate and supports the
request. It does not appear that the rezoning will
significantly impact the "R-2" subdivision to the west•
because of a similar platting arrangement and the
proposed lots are larger than the "R-3" minimum. There
are some issues that should be resolved prior to final
action being taken on the rezoning request. The most
significant one is the status of the property north of
the extension of Tall Timber Blvd. The Master Parks
Plan identifies that area as proposed park land. The
City's Park Department will provide additional
information on this issue at a later date. Staff's
position is that the area included on the Parks Plan
should be left unplatted and made part of the City's
parks system through whatever mechanism is feasible.
Also, the floodway/floodplain is involved with this
tract north of the Tall Timber Blvd. extension. A
preliminary plat has been filed for the west 5.5 acres
only and not the entire 30 acres as required by the
Subdivision Ordinance. The Subdivision Ordinance
states that a preliminary plat be filed for all land
October 30, 1984
Item No. 14 - Continued
under one ownership. This allows a more thorough
review of the proposal including circulation and
general design considerations. A possible option to
consider at this time is to only rezone the 5.5 acres
for which a plat has been filed or request that some
type of plat be presented for all 30 acres..
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to the
resolutions of the issues identified in staff analysis.
PLANNING COMMISSION ACTION:
The applicant, Jack Castin, was present and representing the
owner, First Federal Service Corporation. There were a
number of persons in attendance opposing the requested
rezoning. Mr. Castin spoke and stated that the plans were
to only have single family homes. He then presented a map
and discussed the preliminary plat for 5.5 acres which is to
be the first phase. Mr. Castin stated that none of the
property was in the floodway and that they would consider
deleting the area in the floodplain from the "R-3" request.
This land north of Tall Timber Boulevard extension could
possibly be made available to the City for use as a park
Mr. Castin indicated. He then went on to say if the "R-3"
zoning was accomplished, lots would be approximately 20
percent less than lots in an "R-2" subdivision. Sarah
Bradshaw of the adjoining Pecan Lake development requested
the Planning Commission to postpone action on the request
until the Property Owners' Association had more time to
review the proposal. She went on to sa-y that there was a
petition with 250+ signatures opposed to the request, and
her concerns were lower property values, smaller lots than
in the existing subdivision, duplexes were permitted as a
conditional use in "R-3" and increased traffic. Mr. James
McLeod, president of the Property Owners' Association spoke
against the rezoning and presented the petition to the
Planning Commission. Mr. Harley stated that he was opposed
to anything less than "R-2" zoning. Ed Billings was
concerned with an orderly development, the quality of life
and property values in the existing subdivision. He also
expressed a number of uncertainties with the proposal.
Ernie Matkin of Superior Federal was concerned with possible
duplexes and voiced some objection to the "R-3" proposal
because of that possibility. Mr. Castin spoke again and
indicated that Tall Timber Boulevard was a collector on
October 30, 1984
Item No. 14 - Continued
the Master Street Plan. He said in the first phase, 5.5
acres, 21 lots were platted with an average lot size of
6,000 square feet. He also indicated that there would be
approximately 160 lots in the entire development.
Mr. Castin said that he could not make any assurances that
there would not be any duplexes in the remaining 25 acres.
There was a lengthy discussion about the total number of
units that could be developed in an "R-2" project versus an
"R-3" development. Mr. Castin said that the owners could
accept the rezoning to "R-3" on only the first phase and
suggested that additional time for further study of certain
issues might be beneficial. After more comments, a motion
was made to defer the item to the December 18, 1984,
meeting. Mr. Castin agreed to the deferral. The motion
passed by a vote of 8 ayes, 0 noes, 2 absent and 1
abstention (Richard Massie).
December 18, 1984
Item No. G - Z-4348
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
First Federal Service Corporation
John A. Castin
East End of Tall Timber Blvd.
Rezone from "R-2" Single Family to
"R-3" Single Family
Single Family
30.18 acres
Vacant
SURROUNDING LAND USE AND ZONING:
North - Vacant, Zoned "R-2"
South - Vacant and Single*Family, Unclassified
East - Hindman Park, Zoned "R-2"
West - Vacant and Single Family, Zoned "R-2"
PLANNING CONSIDERATIONS:
1. The proposal is to rezone approximately 30 acres to
"R-3" which is the City's small lot single family
district. In the "R-3" district, the minimum lot area
is 5,000 square feet vs. 7,000 square feet in the
"R-2." The minimum lot depth of 100 feet is the same
in both "R-2" and "R-3," but the minimum lot width is
60' in "R-2" and 50' in "R-3." In addition to those
differences, two family residences are permitted as a
conditional use in the "R-3" district, but the minimum
lot size is 7,000 square feet. The Zoning Ordinance
states that the "R-3" district is "established an order
to provide for an appropriate district for the existing
developed areas occupied by smaller scale single family
housing, and it is intended that this district be
utilized, for new construction only within the existing
urban area and especially for infill development." It
can be questioned as to whether the land being
considered for rezoning is within the existing
developed urban area. From the staff's viewpoint, this
does not appear to be a major issue, but needed to be
mentioned. Normally, the existing "R-3" areas are
found to the east of University. To the north of this
area, much of what is considered the John Barrow
neighborhood, is zoned "R-3." 'The 30 acre tract is
adjacent to a partially developed subdivision so it can
December 18, 1984
Item No. G - Continued
be argued that the location is not totally removed from
the existing developing urban area. The "R-3" district
could also be viewed as one method for providing
affordable housing because of the small lot provision,
and this is something that the City has been trying to
encourage recently.
2. The entire site is vacant and wooded with some slope to
it. The land increases in elevation from north to
south. The property on the north side of what would be
the extension of Tall Timber Blvd. has some floodway
and floodplain involvement.
3. There are no right-of-way requirements or Master Street
Plan issues associated with this request.
4. There have been no adverse comments received from the
reviewing agencies as of this writing.
5. There are no legal issues.
6. Based on the calls that staff has received from the
residents in the existing Pecan Lake Subdivision, there
is significant neighborhood opposition to the proposed
"R-3" rezoning. There is no documented history on the
site.
7. Staff does not feel that an "R-3" rezoning for this
type of an area is inappropriate and supports the
request. It does not appear that the rezoning will
significantly impact the "R-2" subdivision to the west
because of a similar platting arrangement and the
proposed lots are larger than the "R-3" minimum. There
are some issues that should be resolved prior to final
action being taken on the rezoning request. The most
significant one is the status of the property north of
the extension of Tall Timber Blvd. The Master Parks
Plan identifies that area as proposed park land. The
City's Park Department will provide additional
information on this issue at a later date. Staff's
position is that the area included on the Parks Plan
should be left unplatted and made part of the City's
parks system through whatever mechanism is feasible.
Also, the floodway/floodplain is involved with this
tract north of the Tall Timber Blvd. extension. A
preliminary plat has been filed for the west 5.5 acres
only and not the entire 30 acres as required by the
Subdivision Ordinance. The Subdivision Ordinance
states that a preliminary plat be filed for all land
December 18, 1984
Item No. G - Continued
under one ownership. This allows
review of the proposal including
general design considerations. A
consider at this time is to only
for which a plat has been filed o
type of plat be presented for all
STAFF RECOMMENDATION:
a more thorough
circulation and
possible option to
rezone the 5.5 acres
r request that some
30 acres.
Staff recommends approval of the request subject to the
resolutions of the issues identified in staff analysis.
PLANNING COMMISSION ACTION:
The applicant, Jack Castin, was present and representing the
owner, First Federal Service Corporation. There were a
number of persons in attendance opposing the requested
rezoning. Mr. Castin spoke and stated that the plans were
to only.have single family homes. He then presented a map
and discussed the preliminary plat for 5.5 acres which is to
be the first phase. Mr. Castin stated that none of the
property was in the floodway and that they would consider
deleting the area in the floodplain from the "R-3" request.
This land north of Tall Timber Boulevard extension could
Possibly be made available to the City for use as a park
Mr. Castin indicated. He there went on to say if the "R-3"
zoning was accomplished, lots would be approximately 20
percent less than lots in an "R-2" subdivision. Sarah
Bradshaw of the adjoining Pecan Lake development requested
the Planning Commission to postpone action on the request
until the Property Owners' Association had more time to
review the proposal. She went on to say that there was a
Petition with 250+ signatures opposed to the request, and
her concerns were lower property values, smaller lots than
in the existing subdivision, duplexes were permitted as a
conditional use in "R--3" and increased traffic. Mr. James
McLeod, president of the Property Owners' Association• spoke
against the rezoning and presented the petition to the
Planning Commission. Mr. Harley stated that he was opposed
to anything less than "R-2" zoning. Ed Billings was
concerned with an orderly development, the quality of life
and property values in the existing subdivision. He also
expressed a number of uncertainties with the proposal.
Ernie Matkin of Superior Federal was concerned with possible
duplexes and voiced some objection to the "R-3" proposal
because of that possibility. Mr. Castin spoke again and
indicated that Tall Timber Boulevard wasa collector on
December 18, 1984
Item No. G - Continued
the Master Street Plan. He said in the first phase, 5.5
acres, 21 lots were platted with an average lot size of
6,000 square feet. He also indicated that there would be
approximately 160 lots in the entire development.
Mr. Castin said that he could not make any assurances that
there would not be any duplexes in the remaining 25 acres.
There was a lengthy discussion about the total number of
units that could be,developed in an 11R-2" project versus an
"R-3" development. Mr. Castin said that the owners could
accept the rezoning to 11R-3" on only the first phase and
suggested that additional time for further study of certain
issues might be beneficial. After more comments, a motion
was made to defer the item to the December 18, 1984,
meeting. Mr. Castin agreed to the deferral. The motion
passed by a vote of 8 ayes, 0 noes, 2 absent and 1
abstention (Richard Massie).
PLANNING COMMISSION ACTION: (12/18/84)
The applicant, Jack Castin, was present. There was one
objector present. Mr. Castin spoke and discussed the
preliminary plat and the proposed rezoning plat. He also
indicated that the Parks Department's proposal for park land
was 150' from the centerline of Brodie Creek.
James McCleod, president of the Pecan Lake Property Owners
Association, addressed the Commission and said that they
were still totally opposed to the rezoning. Mr. McCleod
again described the objections that were mentioned at the
previous hearing such as impact on property values and
duplexes being a conditional use in the 11R-3" district.
After additional comments, the Planning Commission voted to
recommend approval of the request subject to the Parks
Department approval. The vote: 9 ayes, 0 noes, 0 absent
and 1 abstention (Richard Massie).