HomeMy WebLinkAboutZ-4343-I Staff AnalysisFILE NO.: Z -4_343-T
NAME: SADDLE CREEK CENTER -- ZONING SITE PLAN REVIEW
LOCATION: At the southeast corner of Ranch Blvd., and Ranch
Drive, approximately 300 feet north of Cantrell Road.
DEVELOPER: ENGINEER:
Ed Willis Joe White
FINANCIAL CENTRE CORPORATION WHITE-DATERS & ASSOCIATES, INC.
P. O. Box 56350 401 S. Victory St.
Little Rock, AR 72215 Little Rock, AR 72201
224-9600 374-1666
AREA: 4.46 ACRES NUMBER OF LOT,5: 3 FT. NEW STREET: 0
ZONING: C-2 PROPOSED USES: General Retail and Offices
PLANNING DISTRICT: 20
CENSUS TRACT: 42.05
VARIANCES REQUESTED:
1. Approval of a variance from the requirement that the
internal private drives meet public street standards,
to permit the drives to be constructed to driveway
standards.
2. Approval of a variance from the restriction on the
spacing of drive access points to lots from public or
private streets, to permit two driveways plus a service
drive to be located within a 340 foot distance along he
private street.
STATEMENT OF PROPOSAL:
The applicant requests review of a site plan for a commercial and
office complex on a 4.46 acre tract. The site is proposed to
consist of three buildings on three separate lots; however,
access to the lots and the parking areas are proposed to be
shared, with a common access easement encompassing the drives and
parking areas, with provision for cross-over access easements.
Lot B-1 is to be a 1.057 acre lot, with a 10,170 square foot
building on it. A drive-thru pick-up window is requested at the
east facade of the building, and parking for 35 vehicles is to be
provided. Lot B-2 is to be a 1.355 acre lot, with a 11,709
square foot building located on it. A drive-thru pick-up window
is requested at the south facade of the building, and parking for
40 vehicles is to be provided. Lot B-3 is to be a 2.021 acre
lot, with a 17,581 square foot building located on it. Parking
FILE NO.: Z -4343-I (Continued)
for 58 vehicles is provided. A private drive for access to the
project site is proposed to be constructed along the south
boundary of the tract. Approval of a preliminary plat for the
tract is being sought as Item 5-b on the December 12, 1995
Planning Commission agenda, and the access easement and private
drive issues are being addressed as part of the preliminary plat
item. The matter of the common access easement and private
interior traffic circulation system, with the cross-over
easements for drives and the parking areas needs to be addressed
with the site plan review, and approval of this is requested.
Approval is also requested for two variances: one from the
regulations which requires the internal access drives to meet
public street standards, with sidewalks on both sides, and one
from the regulation which restricts the number of access points
along the lot frontage of Lots B-2 and B-3, to permit two public
and one service access point from the private drive which borders
the site on the south.
A. PROPOSALIRE47EST:
Review and approval by the Planning Commission is requested
for a site plan for a commercial center, with access
easements to provide internal circulation, and a private
drive system and shared parking areas, with cross-over
access easements.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the regulation which requires internal
private drives to meet public street design standards, with
sidewalks on both sides, to permit the internal drives to be
constructed to driveway standards.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the restriction on the spacing of drive
access points to lots from public or private streets, to
permit two driveways plus a service drive to be located
within a 340 foot distance along the private street.
B. EXISTING CONDITIONS:
The site is undeveloped, but, since it was once pasture
land, it is, for the most part, cleared of vegetation.
There are a number of large trees located on the site.
The existing zoning of the site is C-2, with the remainder
of the C-2 tract lying to the east and south. To the north,
across Ranch Dr., is an 0-2 zoned tract at the intersection
of Ranch Rd. and Ranch Blvd., and a MF -18 tract surrounding
the corner tract. Across Ranch Blvd. to the west is a large
O-2 tract.
2
FILE NO.: Z-4343-1 (Continued)
C. ENGINEERING UTILITY COMMENTS:
Public works comments:
Proper grading plans and erosion control plans are
required prior to construction.
Stormwater detention analysis is required. Open
ditches are generally not permitted by the Stormwater
Management and Drainage Manual. If ditches are
planned, they must be shown on the preliminary plat and
must be approved by the City Engineer prior to Planning
Commission approval of the plat [Ref. Sec. 311-89(9)].
The south lots should have a maximum of 2 driveways
onto the south access street.
Sidewalks are required along all boundary streets.
Little Rock Water Works comments that on-site fire
protection will be required.
Little Rock Wastewater Utility comments that sewer is
available, with no adverse effect to the system from the
proposed development.
Arkansas Power and Light Co. will require a 15 foot .easement
along all four sides of the tract.
Arkansas Louisiana Gas Co. approved the submittal.
Southwestern Bell Telephone Co. approved the submittal
The Little Rock Fire Department commented that an additional
fire hydrant will be required at the west side of the site.
D. ISSUES LEGAL TECHNICAL DESIGN:
Sec. 36-127 requires that, among other zoning districts,
sites in C-2 zoned areas are subject to site plan review by
the Planning Commission.
On-site fire hydrants, both existing and proposed are to be
shown.
Sec. 31-287 requires that, where a commercial development
requires the creation of an internalized circulation system
to provide access to multiple lots and building site, the
Planning Commission may authorize the use of a service
easement in lieu of public commercial streets. The location
of the private service easements shall be indicated on the
plat and shall be built to public street design standards.
Design of service easement improvements shall be subject to
3
FILE Z-4 4 -I (Continued
E.
F.
the review and approval by the City Engineer. Any variance
from the public street standards must be appealed to the
City Board of Directors The shown private access drive does
not meet the public street standards, and a variance from
this requirement is sought.
Sec. 31-210 limits, among others, commercial and office lots
to one driveway or access point for each 300 feet of lot
frontage, and provides that shared or common driveway points
are encouraged to reduce impact of these requirements on
lots of less than 300 feet in frontage. within the two
lots, each with frontages of less than 300 feet, three drive
access points (two for the public and one service drive) are
shown. A variance is requested to permit these three drive
access points.
Parking for general business and retail sales uses is 1
space for each 300 square feet of gross floor area for the
first 10,000 square feet of building size, then, for areas
between 10,001 and 20,000 square feet, 95% of the -basic -
requirement is mandated. Required parking is 128 spaces; a
total of 170 is provided.
The Plans Review Specialist notes that the areas set aside
for buffers and landscaping meet the Ordinance requirements.
Curbs and gutters, or another approved border, are required
to protect landscaped areas from vehicular traffic.
ANALYSIS:
There are only minor deficiencies in the presented
documents, and any deficiencies can be dealt with prior to
final approval of the site plan by staff.
The nature of the "center", with an internalized traffic
circulation system, but with separate lots, acts as a
unified center. Common access and cross -access easements
are provided, and, except for -lines on the site plan, the
lot lines are irrelevant to the functioning of the center.
Drives, as if the development were on a single lot, then,
are appropriate, as long as they function well.
The additional access point -form the south boundary private
street for service vehicles _ -is justified, and the variance
from the regulations can be supported.
STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, with the common
access easements and cross easements encompassing the
interior drives and parking areas.
Staff recommends approval of the variance from the
regulation which will require the internal drives to meet
4
FILE NO.: Z -4343-I (Continued)
public street design standards, with sidewalks on both
sides.
Staff recommends approval of the variance form the
regulation which limits the access points form the south
boundary private street to two access points, to permit an
additional service access point.
SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 22, 1995)
Mr. Bob Schultz and Mr. Ed Willis, the applicants, and Mr. Joe
White, with White-Daters and Associates, Inc., the project
engineering firm, were present. Staff outlined the nature of the
project and reviewed the comments contained in the discussion
outline. Staff pointed out that the site is part of a larger
tract, and that, in subdividing the subject tract from the larger
tract, a preliminary plat is needed. Mr. White indicated that a
plat would be forthcoming. David Scherer and Bill Henry, with
the Public Works staff, reviewed the Public Works concerns. The
Committee members discussed the various issues, and forwarded the
item to the full Commission for the public hearing.
PLANNING COMMISSION ACTION: (DECEMBER 12, 1995)
Staff reported that the applicant had submitted a revised site
plan which addresses the Public Works concerns noted at the
Subdivision Committee meeting.
Staff noted that the Ordinance provides that, when a development
requires the creation of an internalized circulation system to
provide access to multiple lots, the Planning Commission may
authorize the use of a service easement in lieu of a Public
Street, and that the applicant had requested such a service
easement. Staff reported that the entire internal drive area is
to be within the access easement, and its design meets with
Public Works requirements. Staff recommended approval of the
service easement.
Staff reported that the Ordinance requires that improvements
within service easements meet public street standards, and that
the applicant had requested a variance from this requirement to
permit the improvements to be to private drive and parking lot
standards, and without sidewalks along both sides of the drive,
as would be required for a commercial street. Staff recommended
approval of this requested variance.
Staff reported that the Ordinance requires that, where lots have
less than 300 feet of frontage on a street, they are to have a
common access point, but that in the case of the subject
property, where one lot has 240 feet of frontage and the other,
230 feet, that within this 470 feet, the site plan proposes 2
drive access points for the public, plus one service drive.
5
FILE NQ.: Z-434 -I (Continued)
Staff explained that a variance from the Ordinance limitation is
needed, and staff recommended approval of the variance.
The item was included on the Consent Agenda for approval. The
site plan and internalized service easement were approved, and a
recommendation to the Board of Directors for approval of a
variance: 1) to permit the improvements within the service
easement to be constructed to private drive and parking lot
standards, without sidewalks along both sides of the drive; and
2) to permit 2 public drive access points and one service drive
within the 470 feet of frontage of Lots B-2 and B-3 were
recommended for approval, with the vote of 10 ayes, 0 nays,
0 abstentions, and 1 absent.
6
FILE NO.: Z-434 -I
DAME: SADDLE CREEK CENTER -- ZONING SITE PLAN REVIEW
LOCATION: At the southeast corner of Ranch Blvd., and Ranch
Drive, approximately 300 feet north of Cantrell Road.
DEVELOPER: ENGINEER:
Ed Willis Joe White
FINANCIAL CENTRE CORPORATION WHITE-DATERS & ASSOCIATES, INC.
P. O. Box 56350 401 S. Victory St.
Little Rock, AR 72215 Little Rock, AR 72201
224-9600 374-1666
AREA: 4.46 ACRES NUMBER OF LOTS: 3 FT. NEW STREET: 0
ZONI C-2 PROPOSED USES: General Retail and Offices
PLANNING DISTRICT: 20
CENSUS TRACT: 42.05
VARIANCES REQUESTED:
1. Approval of a variance from the requirement that the
internal private drives meet public street standards,
to permit the drives to be constructed to driveway
standards.
2. Approval of a variance from the restriction on the
spacing of drive access points to lots from public or
private streets, to permit two driveways plus a service
drive to be located within a 340 foot distance along he
private street.
STATEMENT OF PROPOSAL:
The applicant requests review of a site plan for a commercial and
office complex on a 4.46 acre tract. The site is proposed to
consist of three buildings on three separate lots; however,
access to the lots and the parking areas are proposed to be
shared, with a common access easement encompassing the drives and
parking areas, with provision for cross-over access easements.
Lot B-1 is to be a 1.057 acre lot, with a 10,170 square foot
building on it. A drive-thru pick-up window is requested at the
east facade of the building, and parking for 35 vehicles is to be
provided. Lot B-2 is to be a 1.355 acre lot, with a 11,709
square foot building located on it. A drive-thru pick-up window
is requested at the south facade of the building, and parking for
40 vehicles is to be provided. Lot B-3 is to be a 2.021 acre
lot, with a 17,581 square foot building located on it. Parking
FILE NO.: Z -4343-I (Continued)
for 58 vehicles is provided. A private drive for access to the
project site is proposed to be constructed along the south
boundary of the tract. Approval of a preliminary plat for the
tract is being sought as Item 5-b on the December 12, 1995
Planning Commission agenda, and the access easement and private
drive issues are being addressed as part of the preliminary plat
item. The matter of the common access easement and private
interior traffic circulation system, with the cross-over
easements for drives and the parking areas needs to be addressed
with the site plan review, and approval of this is requested.
Approval is also requested for two variances: one from the
regulations which requires the internal access drives to meet
public street standards, with sidewalks on both sides, and one
from the regulation which restricts the number of access points
along the lot frontage of Lots B-2 and B-3, to permit two public
and one service access point from the private drive which borders
the site on the south.
A. PROPOSAL/REDIIEST:
Review and approval by the Planning Commission is requested
for a site plan for a commercial center, with access
easements to provide internal circulation, and a private
drive system and shared parking areas, with cross-over
access easements.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the regulation which requires internal
private drives to meet public street design standards, with
sidewalks on both sides, to permit the internal drives to be
constructed to driveway standards.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the restriction on the spacing of drive
access points to lots from public or private streets, to
permit two driveways plus a service drive to be located
within a 340 foot distance along the private street.
B. EXISTING CONDITIONS:
The site is undeveloped, but, since it was once pasture
land, it is, for the most part, cleared of vegetation.
There are a number of large trees located on the site.
The existing zoning of the site is C-2, with the remainder
of the C-2 tract lying to the east and south. To the north,
across Ranch Dr., is an 0-2 zoned tract at the intersection
of Ranch Rd. and Ranch Blvd., and a MF -18 tract surrounding
the corner tract. Across Ranch Blvd. to the west is a large
O-2 tract.
2
FILE N Z-4 4 -I (Continued)
C. ENGINEERING UTILITY COMMENT
Public Works comments:
Proper grading plans and erosion control plans are
required prior to construction.
Stormwater detention analysis is required. Open
ditches are generally not permitted by the Stormwater
Management and Drainage Manual. If ditches are
planned, they must be shown on the preliminary plat and
must be approved by the City Engineer prior to Planning
Commission approval of the plat [Ref. Sec. 311-89(9)].
The south lots should have a maximum of 2 driveways
onto the south access street.
Sidewalks are required along all boundary streets.
Little Rock Water Works comments that on-site fire
protection will be required.
Little Rock Wastewater Utility comments that sewer is
available, with no adverse effect to the system from the
proposed development.
Arkansas Power and Light Co. will require a 15 foot easement
along all four sides of the tract.
Arkansas Louisiana Gas Co. approved the submittal.
Southwestern Bell Telephone Co. approved the submittal
The Little Rock Fire Department commented that an additional
fire hydrant will be required at the west side of the site.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
Sec. 36-127 requires that, among other zoning districts,
sites in C-2 zoned areas are subject to site plan review by
the Planning Commission.
On-site fire hydrants, both existing and proposed are to be
shown.
Sec. 31-287 requires that, where a commercial development
requires the creation of an internalized circulation system
to provide access to multiple lots and building site, the
Planning Commission may authorize the use of a service
easement in lieu of public commercial streets. The location
of the private service easements shall be indicated on the
plat and shall be built to public street design standards.
Design of service easement improvements shall be subject to
K.
FILE NO.: Z-4 4 -I (Continued)
E.
F.
the review and approval by the City Engineer. Any variance
from the public street standards must be appealed to the
City Hoard of Directors The shown private access drive does
not meet the public street standards, and a variance from
this requirement is sought.
Sec. 31-210 limits, among others, commercial and office lots
to one driveway or access point for each 300 feet of lot
frontage, and provides that shared or common driveway points
are encouraged to reduce impact of these requirements on
lots of less than 300 feet in frontage. Within the two
lots, each with frontages of less than 300 feet, three drive
access points (two for the public and one service drive) are
shown. A variance is requested to permit these three drive
access points.
Parking for general business and retail sales uses is 1
space for each 300 square feet of gross floor area for the
first 10,000 square feet of building size, then, for areas
between 10,001 and 20,000 square feet, 95% of the basic
requirement is mandated. Required parking is 128 spaces; a
total of 170 is provided.
The Plans Review Specialist notes that the areas set aside
for buffers and landscaping meet the Ordinance requirements.
Curbs and gutters, or another approved border, are required
to protect landscaped areas from vehicular traffic.
ANALYSIS•
There are only minor deficiencies in the presented
documents, and any deficiencies can be dealt with prior to
final approval of the site plan by staff.
The nature of the "center", with an internalized traffic
circulation system, but with separate lots, acts as a
unified center. Common access and cross -access easements
are provided, and, except for lines on the site plan, the
lot lines are irrelevant to the functioning of the center.
Drives, as if the development were on a single lot, then,
are appropriate, as long as they function well.
The additional access point form the south boundary private
street for service vehicles is justified, and the variance
from the regulations can be supported.
STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, with the common
access easements and cross easements encompassing the
interior drives and parking areas.
Staff recommends approval of the variance from the
regulation which will require the internal drives to meet
4
FILE NO_: Z-4343-1 (Continued
public street design standards, with sidewalks on both
sides.
Staff recommends approval of the variance form the
regulation which limits the access points form the south
boundary private street to two access points, to permit an
additional service access point.
SUBDIVISION COMMITTEE_QQMMENT: (NOVEMBER 22, 1995)
Mr. Bob Schultz and Mr. Ed Willis, the applicants, and Mr. Joe
White, with White-Daters and Associates, Inc., the project
engineering firm, were present. Staff outlined the nature of the
project and reviewed the comments contained in the discussion
outline. Staff pointed out that the site is part of a larger
tract, and that, in subdividing the subject tract from the larger
tract, a preliminary plat is needed. Mr. White indicated that a
plat would be forthcoming. David Scherer and Bill Henry, with
the Public Works staff, reviewed the Public Works concerns. The
Committee members discussed the various issues, and forwarded the
item to the full Commission for the public hearing.
PLANNING COMMISSION ACTION: (DECEMBER 12, 1995)
Staff reported that the applicant had submitted a revised site
plan which addresses the Public Works concerns noted at the
Subdivision Committee meeting.
Staff noted that the Ordinance provides that, when a development
requires the creation of an internalized circulation system to
provide access to multiple lots, the Planning Commission may
authorize the use of a service easement in lieu of a Public
Street, and that the applicant had requested such a service
easement. Staff reported that the entire internal drive area is
to be within the access easement, and its design meets with
Public Works requirements. Staff recommended approval of the
service easement.
Staff reported that the Ordinance requires that improvements
within service easements meet public street standards, and that
the applicant had requested a variance from this requirement to
permit the improvements to be to private drive and parking lot
standards, and without sidewalks along both sides of the drive,
as would be required for a commercial street. Staff recommended
approval of this requested variance.
Staff reported that the Ordinance requires that, where lots have
less than 300 feet of frontage on a street, they are to have a
common access point, but that in the case of the subject
property, where one lot has 240 feet of frontage and the other,
230 feet, that within this 470 feet, the site plan proposes 2
drive access points for the public, plus one service drive.
5
FILE NO,: Z-4343-1 (Continued)
Staff explained that a variance from the Ordinance limitation is
needed, and staff recommended approval of the variance.
The item was included on the Consent Agenda for approval. The
site plan and internalized service easement were approved, and a
recommendation to the Board of Directors for approval of a
variance: 1) to permit the improvements within the service
easement to be constructed to private drive and parking lot
standards, without sidewalks along both sides of the drive; and
2) to permit 2 public drive access points and one service drive
within the 470 feet of frontage of Lots B-2 and B-3 were
recommended for approval, with the vote of 10 ayes, 0 nays,
0 abstentions, and 1 absent.
6
December 12, 1995
ITEM N 14 FILE NO.: Z-4 43--I
NAME: SADDLE CREEK CENTER -- ZONING SITE PLAN REVIEW
LOCATION: At the southeast corner of Ranch Blvd., and Ranch
Drive, approximately 300 feet north of Cantrell Road.
DEVELOPER: ENGINEER:
Ed Willis Joe White
FINANCIAL CENTRE CORPORATION WHITE-DATERS & ASSOCIATES, INC.
P. O. Box 56350 401 S. Victory St.
Little Rock, AR 72215 Little Rock, AR 72201
224-9600 374-1666
AREA: 4.46 ACRES NUMBER OF LOTS: 3 FT. NEW STREET: 0
ZONING: C-2 PROPOSED USES: General Retail and Offices
PLANNING DISTRICT: 20
CENSUS TRACT: 42.05
VARIANCES REQUESTED:
1. Approval of a variance from the requirement that the
internal private drives meet public street standards,
to permit the drives to be constructed to driveway
standards.
2. Approval of a variance from the restriction on the
spacing of drive access points to lots from public or
private streets, to permit two driveways plus a service
drive to be located within a 340 foot distance along he
private street.
STATEMENT OF PROPQSAL:
The applicant requests review of a site plan for a commercial and
office complex on a 4.46 acre tract. The site is proposed to
consist of three buildings on three separate lots; however,
access to the lots and the parking areas are proposed to be
shared, with a common access easement encompassing the drives and
parking areas, with provision for cross-over access easements.
Lot B-1 is to be a 1.057 acre lot, with a 10,170 square foot
building on it. A drive-thru pick-up window is requested at the
east facade of the building, and parking for 35 vehicles is to be
provided. Lot B-2 is to be a 1.355 acre lot, with a 11,709
square foot building located on it. A drive-thru pick-up window
December 12, 1995
SUBDIVISION
ITEM NO.: 14 n inu d FILE DTO.: Z -4343-I
is requested at the south facade of the building, and parking for
40 vehicles is to be provided. Lot B-3 is to be a 2.021 acre
lot, with a 17,581 square foot building located on it. Parking
for 58 vehicles is provided. A private drive for access to the
project site is proposed to be constructed along the south
boundary of the tract. Approval of a preliminary plat for the
tract is being sought as Item 5-b on the December 12, 1995
Planning Commission agenda, and the access easement and private
drive issues are being addressed as part of the preliminary plat
item. The matter of the common access easement and private
interior traffic circulation system, with the cross-over
easements for drives and the parking areas needs to be addressed
with the site plan review, and approval of this is requested.
Approval is also requested for two variances: one from the
regulations which requires the internal access drives to meet
public street standards, with sidewalks on both sides, and one
from the regulation which restricts the number of access points
along the lot frontage of Lots B-2 and B-3, to permit two public
and one service access point from the private drive which borders
the site on the south.
A. PROPO AL RE VEST:
Review and approval by the Planning Commission is requested
for a site plan for a commercial center, with access
easements to provide internal circulation, and a private
drive system and shared parking areas, with cross-over
access easements.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the regulation which requires internal
private drives to meet public street design standards, with
sidewalks on both sides, to permit the internal drives to be
constructed to driveway standards.
Review by the Planning Commission and a recommendation of
approval to the Board of Directors is requested for approval
of a variance from the restriction on the spacing of drive
access points to lots from public or private streets, to
permit two driveways plus a service drive to be located
within a 340 foot distance along the private street.
B. EXISTING CONDITIONS:
The site is undeveloped, but, since it was once pasture
land, it is, for the most part, cleared of vegetation.
There are a number of large trees located on the site.
2
December 12, 1995
SUBDIVISION
ITEM NO.: 14 L QntipMgd) _ FILE NO.: Z -4343-I
The existing zoning of the site is C-2, with the remainder
of the C-2 tract lying to the east and south. To the north,
across Ranch Dr., is an 0-2 zoned tract at the intersection
of Ranch Rd. and Ranch Blvd., and a MF -18 tract surrounding
the corner tract. Across Ranch Blvd. to the west is a large
0-2 tract.
C. ENGINEERING/UTILITY COMMENTS
Public Works comments:
Proper grading plans and erosion control plans are
required prior to construction.
Stormwater detention analysis is required. Open
ditches are generally not permitted by the Stormwater
Management and Drainage Manual. If ditches are
planned, they must be shown on the preliminary plat and
must be approved by the City Engineer prior to Planning
Commission approval of the plat [Ref. Sec. 311-89(9)].
The south lots should have a maximum of 2 driveways
onto the south access street.
Sidewalks are required along all boundary streets.
Little Rock Water Works comments that on-site fire
protection will be required.
Little Rock Wastewater Utility comments that sewer is
available, with no adverse effect to the system from the
proposed development.
Arkansas Power and Light Co. will require a 15 foot easement
along all four sides of the tract.
Arkansas Louisiana Gas Co. approved the submittal.
Southwestern Bell Telephone Co. approved the submittal
The Little Rock Fire Department commented that an additional
fire hydrant will be required at the west side of the site.
D. I SSUE$1_LE,_QAL/TECHNICALl,DE5IGN :
Sec. 36-127 requires that, among other zoning districts,
sites in C-2 zoned areas are subject to site plan review by
the Planning Commission.
3
December 12, 1995
RIp
am]
ITEM NO.: 14 _ (Continued) _ FILE NO. Z -4343-I
On-site fire hydrants, both existing and proposed are to be
shown.
Sec. 31-287 requires that, where a commercial development
requires the creation of an internalized circulation system
to provide access to multiple lots and building site, the
Planning Commission may authorize the use of a service
easement in lieu of public commercial streets. The location
of the private service easements shall be indicated on the
plat and shall be built to public street design standards.
Design of service easement improvements shall be subject to
the review and approval by the City Engineer. Any variance
from the public street standards must be appealed to the
City Board of Directors The shown private access drive does
not meet the public street standards, and a variance from
this requirement is sought.
Sec. 31-210 limits, among others, commercial and office lots
to one driveway or access point for each 300 feet of lot
frontage, and provides that shared or common driveway points
are encouraged to reduce impact of these requirements on
lots of less than 300 feet in frontage. within the two
lots, each with frontages of less than 300 feet, three drive
access points (two for the public and one service drive) are
shown. A variance is requested to permit these three drive
access points.
Parking for general business and retail sales uses is 1
space for each 300 square feet of gross floor area for the
first 10,000 square feet of building size, then, for areas
between 10,001 and 20,000 square feet, 95% of the basic
requirement is mandated. Required parking is 128 spaces; a
total of 170 is provided.
The Plans Review Specialist notes that the areas set aside
for buffers and landscaping meet the Ordinance requirements.
Curbs and gutters, or another approved border, are required
to protect landscaped areas from vehicular traffic.
E. ANALYSIS•
There are only minor deficiencies in the presented
documents, and any deficiencies can be dealt with prior to
final approval of the site plan by staff.
The nature of the "center", with an internalized traffic
circulation system, but with separate lots, acts as a
unified center. Common access and cross -access easements
are provided, and, except for lines on the site plan, the
lot lines are irrelevant to the functioning of the center.
4
December 12, 1995
SUBDIVISION
ITEM NO,- 14 (Continued) FILE N Z-4 4-I
Drives, as if the development were on a single lot, then,
are appropriate, as long as they function well.
The additional access point form the south boundary private
street for service vehicles is justified, and the variance
from the regulations can be supported.
Fo STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, with the common
access easements and cross easements encompassing the
interior drives and parking areas.
Staff recommends approval of the variance from the
regulation which will require the internal drives to meet
public street design standards, with sidewalks on both
sides.
Staff recommends approval of the variance form the
regulation which limits the access points form the south
boundary private street to two access points, to permit an
additional service access point.
SUBDIVISION COMMITTEE COMMENT:
(NOVEMBER 22, 1995)
Mr. Bob Schultz and Mr. Ed Willis, the applicants, and Mr. Joe
White, with White-Daters and Associates, Inc., the project
engineering firm, were present. Staff outlined the nature of the
project and reviewed the comments contained in the discussion
outline. Staff pointed out that the site is part of a larger
tract, and that, in subdividing the subject tract from the Larger
tract, a preliminary plat is needed. Mr. White indicated that a
plat would be forthcoming. David Scherer and Bill Henry, with
the Public Works staff, reviewed the Public Works concerns. The
Committee members discussed the various issues, and forwarded the
item to the full Commission for the public hearing.
PLANNING COMMISSION ACTION:
(DECEMBER 12, 1995)
Staff reported that the applicant had submitted a revised site
plan which addresses the Public Works concerns noted at the
Subdivision Committee meeting.
Staff noted that the Ordinance provides that, when a development
requires the creation of an internalized circulation system to
provide access to multiple lots, the Planning Commission may
authorize the use of a service easement in lieu of a Public
Street, and that the applicant had requested such a service
5
December 12, 1995
SUBDIVISIQ
ITEM NQS 14 (Continued) _ FILE_ NO. Z-43! 3-I
easement. Staff reported that the entire internal drive area is
to be within the access easement, and its design meets with
Public works requirements. Staff recommended approval of the
service easement.
Staff reported that the Ordinance requires that improvements
within service easements meet public street standards, and that
the applicant had requested a variance from this requirement to
permit the improvements to be to private drive and parking lot
standards, and without sidewalks along both sides of the drive,
as would be required for a commercial street. Staff recommended
approval of this requested variance.
Staff reported that the Ordinance requires that, where lots have
less than 300 feet of frontage on a street, they are to have a
common access point, but that in the case of the subject
property, where one lot has 240 feet of frontage and the other,
230 feet, that within this 470 feet, the site plan proposes 2
drive access points for the public, plus one service drive.
Staff explained that a variance from the Ordinance limitation is
needed, and staff recommended approval of the variance.
The item was included on the Consent Agenda for approval. The
site plan and internalized service easement were approved, and a
recommendation to the Board of Directors for approval of a
variance: 1) to permit the improvements within the service
easement to be constructed to private drive and parking lot
standards, without sidewalks along both sides of the drive; and
2) to permit 2 public drive access points and one service drive
within the 470 feet of frontage of Lots B-2 and B-3 were
recommended for approval, with the vote of 10 ayes, 0 nays,
0 abstentions, and 1 absent.
C
1995
southward across W. Markham St.
R-2 zoned land.
C. ERS
TTLTTy r�
Public Works comments:
SS��
1
To the east and north, is
On the Preliminary
plat•
elevation Provide the base
�d the proposed minim flood
to be constructed floor elevations of
structures re on the propert
y. development the applicant obtains ns an This
must be provided before
Permit.
��SFHp,��
Water courses entering
Points for drain the tract and
drainage age are to be shown, the Planned exit
ge courses leaving the Rights -of -
site must be wed for
A sto dedicated.
rmwater detention
analysis is required.
West Markham St. is a
way and the width of minor arterial, and the right -,f
conform to Master Street pent for W. Markham St.must
will be required axon lan requirements. must
the lots, g the w. Markham St. A sidewalk
frontage of
Construct the common access
standards (3.6 feet drive to commercial
each side of of street width, plus sidewalks rest
the street.) on
Water Works comments that Water Works owns
which includes the Land 2p
of the �� feet north of a a right-of-way
39 raw water main. and 3Q feet south
any construction Water Works w'
be allowed in in the right-of_wa will have to approve
this area. Y, and no building will
Wastewater comments
easements, will be re ui a sewer main extension
quired. with
Arkansas Power po
along the oand Light Co. will re
15 foot easement w. Markham St. quire frontage a 15 foot easement
line easement,
stent along the north side of the subdivision side and a
of the 39" raw water
Arkansas Louisiana
Gas Co. approved the submittal.
Southwestern Bell Telephone Co. noted
required, that easements will be
The Fire Department approved the submittal.
Ea