HomeMy WebLinkAboutZ-4336-Y Staff AnalysisAugust 3, 2006
ITEM NO.- 6.
NAME: Arkansas Children's Hospital Zoning Site Plan Review
LOCATION: located at 11th and Wolfe Streets
DEVELOPER:
Arkansas Children's Hospital
800 Marshall Street
Little Rock, AR 72202
ENGINEER:
Cromwell Architects Engineers
Attn: Kent Taylor
101 South Spring Street
Little Rock, AR 72201
Z-43 36-Y
AREA: 0.25 acres NUMBER OF LOTS: 1 Zoning Lot FT. NEW STREET: 0 LF
CURRENT ZONING: 0-2, Office and Institutional
PLANNING DISTRICT: 8 — Central City
CENSUS TRACT: 10
VARIAN CESNMAIVERS REQUESTED: A variance to allow a reduced setback along
the western perimeter_ (24.1- feet). Section 36-280(e)(1)
A. PROPOSAL -
The request is a Zoning Site Plan Review of this 0-2, Office and Institutional
District property. The site is located at the intersection of West 11th Street and
Wolfe Street and serves as the Energy Building for Arkansas Children's Hospital,
The Energy Building provides chilled and hot water, as well as emergency power
for much of the hospital campus. Tho desire is to build an addition onto the
northwest corner of the Energy Building in order to facilitate major new facilities
on the campus, as well as to provide a fully redundant system. These major new
facilities are in the beginning stages of design. The project will not impact any
current landscaping, as the entire proposed addition is to be constructed on an
existing paved area. All existing landscaping will be maintained or replaced as
needed.
August 3, 2006
ITEM NO.: 6. Cant. Z -4336-Y
B. EXISTING CONDITIONS:
The area proposed for site plan review is located adjacent to an existing building
containing hospital facilities. The site is located within an area that is occupied
and owned by the Arkansas Children's Hospital. West of the site is a parking lot
covering the entire block and southwest of the site are office uses. Across 13th
Street is a site zoned PD -R which has redeveloped as an apartment facility.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from an area resident. The
Capitol Hill Neighborhood Association, the Central High Neighborhood
Association and all property owners located within 200 feet of the site were
notified of the public hearing.
D. ENGINEERING COMMENTS -
Public Warks:
I. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
2. Pians of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING;
Wastewater: Sewer available to existing building on site.
Entergy: No comment received.
Center -Point Enera : No comment received
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. If there are facilities that need to be
adjusted and/or relocated, contact Central Arkansas Water. That work would be
done at the expense of the developer. It appears that there may be a conflict with an
existing 16 -inch main that was cut and plugged 16.5 feet east of existing fire hydrant
01225. Please submit two copies of the plans for modification of the fire protection
system to Central Arkansas Water for review. Contact Central Arkansas Water
regarding procedures for extension of the fire service to this facility. Fire sprinkler
systems which do not contain additives such as antifreeze shall be isolated with a
double detector check valve assembly. if additives are used, a reduced pressure
zone backflow preventer will be required. Contact Central Arkansas Water at 377-
1225 for additional information.
2
August 3, 2006
ITEM NO_: 6.(Cont.) _ Z -4336-Y
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
Count Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAUDESIGN:
Planning. Division: No comment.
Landscape: Compliance with the City's Landscape and Buffer Ordinances is
required.
G. SUBDIVISION COMMITTEE COMMENT:
11
(July 13, 2006)
The applicants were present representing the request. Staff presented an
overview of the project indicating there were few outstanding issues associated
with the request. Staff noted the Public Works conditions and the comments
from the various other reporting departments and agencies suggesting the
applicant contact them directly for additional information and clarification. The
applicant stated there were no concerns with the comments as noted and stated
they would contact the water department concerning their comment about the
water main. There was no further discussion of the item. The Committee then
forwarded the item to the full Commission for final action.
ANALYSIS.-
There
NALYSIS:
There were no outstanding issues related to the request remaining from the July
13, 2006, Subdivision Committee meeting. The request is a Zoning Site Plan
Review for property located at the intersection of West 11th Street and Wolfe
Street. The property serves as the Energy Building for Arkansas Children's
Hospital providing chilled and hot water and emergency power for much of the
hospital campus. The request is to build an addition to the northwest corner of
the Energy Building matching the western fagade of the existing building. The
addition is necessary to facilitate major new facilities on the campus which are
currently in the beginning stages of design, as well as to provide a fully
redundant system. The project as proposed does not impact any on-site
landscaping since the entire proposed addition is to be constructed on an
existing paved area.
The proposed construction will require a variance to allow a reduced building
setback along the western perimeter of the site. The proposed construction will
match the existing building setback along this building face. Staff is supportive of
the requested variance. Staff does not feel the variance will impact the adjoining
properties since the proposed construction matches the existing building face.
3
August 3, 2006
ITEM NO.: 6.(Cont.
Z -4336-Y
Staff is supportive of the request. To staff's knowledge there are no outstanding
issues associated with the request. Staff does not feel the proposed addition will
have any adverse impact on the area or on adjoining properties.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the above
agenda staff report.
Staff recommends approval of the requested variance to allow a reduced building
setback along the western perimeter.
PLANNING COMMISSION ACTION:
(August 3, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval
of the request subject to compliance with the comments and conditions as
outlined in paragraphs D, E and F of the above agenda staff report. Staff also
presented a
recommendation of approval of the requested variance to allow a reduced
building setback along the western perimeter.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried
by a vote of 9 ayes, 0 noes and 2 absent.
4
ITEM NO.: 6.
NAME: Arkansas Children's Hospital Zoning Site Plan Review
LOCATION: located at 11th and Wolfe Streets
Planning Staff Comments:
Z -4336-Y
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than July 19, 2006. The Office of Planning and
Development must receive the proof of notice no later than July 28, 2006.
Variance/Waivers: A variance to allow a reduced setback along the southern perimeter
(24.1- feet). Section 36-280(e)(1)
Public Works Conditions:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
2. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to existing building on site.
Entergy:
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. If there are facilities that need to be
adjusted and/or relocated, contact Central Arkansas Water. That work would be done at
the expense of the developer. It appears that there may be a conflict with an existing
16 -inch main that was cut and plugged 16.5 feet east of existing fire hydrant 01225.
Please submit two copies of the plans for modification of the fire protection system to
Central Arkansas Water for review. Contact Central Arkansas Water regarding
procedures for extension of the fire service to this facility. Fire sprinkler systems which
do not contain additives such as antifreeze shall be isolated with a double detector
check valve assembly. If additives are used, a reduced pressure zone backflow
Item 4 6
preventer will be required. Contact Central Arkansas Water at 377-1225 for additional
information.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: No comment.
Landscape: Compliance with the City's Landscape and Buffer Ordinances is required.
Revised plattplan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, July 19, 2006.
Item # 6