HomeMy WebLinkAboutZ-4332 Staff AnalysisSUBDIVISIONS
Item No. 5
NAME:
LOCATION:
DEVELOPER:
Elkington & Keltner
6060 Primacy
Memphis, TN
AREA: 14.852 acres
West Side Creek Apartments,
Phase II, Long Form "PRD"
(Z-4332)
Approximately 1/4 Mile West of
Intersection of Sam Peck and
Highway 10 (West of Phase I)
ENGINEER:
Brooks/Jackson Architects
2311 Biscayne
Little Rock, AR 72207
Phone: 227-8700
NO. OF LOTS: 1 FT. NEW STREET: 0
ZONING: "PRD" (Density "MF-1211)
PROPOSED USES: Multifamily
PLANNING DISTRICT: 1
CENSUS TRACT: 42.03
A. Site History
The subject site is currently zoned "R-2" for single
family use. This project will tie into Phase I of the
same development, which was previously approved by the
Commission and is now under construction. There is a
continuing density restriction on the site. Project
characteristics of Phase I include 142 units on 11.87
acres at a density of "MF-12."
B. Development Rationale/Objectives
With this proposal, the developer expects to continue
and extend the character of the previously approved
project; with proposed construction of brick veneer,
wood frame, both one level apartment and townhouse
units. He states that the apartments will be designed
to be compatible with the adjoining middle to upper
income residential neighborhood to the south.
SUBDIVISIONS
Item No. 5 - Continued
C. Pr000sal
1. The construction of
23 buildings with 168 units
on 14.852 acres for
use as apartments.
2. Quantitative Data:
Unit Unit
Total Area/
Total
Type Size
Units Bldg.
Area
I-2 Bedroom 981
18 5,886
35,670
II-2 Bedroom 11189
30 7,134
48,000
IV-2 Bedroom 11000
48 81000
18,752
V-2 Bedroom 1,172
16 9,376
41,104
III-2 Bedroom 734
56 5,872
161,184
Total Buildings: 23
Total Units: 168
Total Site Coverage:
91,757 square feet
3. Development Schedule:
Construction should start
February 1985 and be
completed about ten months later.
4. The owners will lease
the dwelling units
with
tenant rights to all
common areas, including
amenities.
5. A 6' wood fence is shown
on the northern
boundary
and a 6' fence and 40'
landscape area shown on the
western and southern
boundaries.
6. Parking - 314 spaces
(plus 6 boat spaces)
D. Engineering Comments
Consider access route with
limited parking to
provide a
throughway.
SUBDIVISIONS
Item No. 5 - Continued
E. Analysis
Staff is very reluctant to offer a favorable
recommendation for this proposal, mainly because of its
deficient means of access. In addition to the 142
units approved previously, the plan would add 168 new
units which makes a total of 310 units with only 2
points of access, through Phase I, the previously
approved apartments now under construction, on to Sam
Peck Road. Support of the project is possible,
provided the applicant can obtain an alternative means
of ingress and egress, either to Highway 10 or
Peckerwood.
The proposed density is acceptable; however, a
restriction on the property still limits development to
three units per acre. Staff cannot make a favorable
comment until the restriction is lifted. The proposed
site design raises several concerns:
(1) The applicant should clarify -what happened to the
remainder of the tract between this site and
Highway 10;
(2) Fire Department feels that the dead end streets
will present a problem, since they are 1401.
(3) The "octopus intersection" on the eastern entrance
to the site is unacceptable. The drive needs to
enter the parking area at a 90 degree angle and
then turn northwood 90 degrees. Some of the
interior turning radii are over or under proper
design. The drive on the southern end seems
designed for speed.
The applicant should address these problems before the
public hearing and provide staff with the needed
revisions.
STAFF RECOMMENDATION
Denial, based on comments made.
SUBDIVISIONS
Item No. 5 - Continued
SUBDIVISION COMMITTEE REVIEW:
It was decided that: (1) no building permit would be issued
until the Board passes a resolution lifting the limitation
on density; (2) the applicant would produce evidence that
land to the north is more than five acres, since he stated,
it's not in his ownership; (3) the applicant would work with
the Fire Chief on the drive; and (4) he would look at some
safety design features for the drives. He stated that the
terrain is the reason an "octopus intersection" is.as
proposed.
Water Works - An 8" on -site fire service is required.
PLANNING COMMISSION ACTION:
Mr. Brooks Jackson, architect for the project, represented
the developer. There were no objectors, although at least
two interested parties from the neighborhood were in
attendance.
Staff reported that a revised plan was submitted which
indicated the safety design features requested and was
approved by the Fire Chief. Evidence was submitted which
indicated that the property north of the site was part of
the 11.5 acres still owned by Mr. Robert A. Peck. The
applicant stated agreement to the understanding that the
item would not be forwarded to the Board until the sewer
limit was listed.
There was some concern expressed about both phases of the
project remaining in separate lots. A motion for approval
of the project was made and passed subject to: (1) the
submission of a one -lot replat. The vote was: 6 ayes,
0 noes, 3 absent and 2 abstentions.
NAME: West Side Creek Apartments, Phase II,
Long -form "PRD" (Z-4332)
LOCATION: Approximately 1/4 Mile West of Intersection of
Sam Peck and Hwy. 10 (West of Phase I)
DEVELOPER' ENGINEER•
Elkington & Reltner Brooks Jackson Architects
6060 Primacy 2311 Biscayne
Idemphis, Tennessee Little Rock, AR 72207
227-8700
REQUEST: PRD approval for the development of 142 units
on 11.87 acres.
STAFF RE pTl'riENDATION• Staff originally recommended denial
of the application, due to insufficient access, sewer
density restriction, fire department comments, internal
design of drives, and size and status of land to the north.
PLANNING COMMISSION A TI N• Approval of the revised plan,
subject to the submission of a one -lot replat.
The vote was 6 ayes, 0 noes, 3 absent & 2 abstentions
(10-9-84). it was decided at Subdivision Commission Meeting
that no building permit would be issued until the Board
passed a resolution lifting the sewer restriction.
1. Name: West Side Creek Apartments, Phase II, Long -Form
"PRD" (Z-4332)
2. Location: Approximately 1/4 mile west of the
inter ersection of Sam Peck and Highway 10 (west of
Phase I).
3. Developer: Effington and Keltner
6060 Primacy
Memphis, TN
En ineer: Brooks Jackson, Architect
2311 Biscayne
Little Rock, AR. 72207
Phone: 227-8700
4. Re nest: "PRD" approval for the development of 142
units an 11.87 acres.
5. Staff Recommendation: Staff recommends approval of the
proposed rezoning and site plan, which has been revised
to incorporate the needed changes. Staff originally
recommended denial of the application due to
insufficient access, sewer density restriction, Fire
Department comments, internal design of drives and size
and status of land to the north.
6. Planning Commission: Approval of the revised plan,
subject to the submission of the one -lot replat.
The vote was 6 ayes, 0 noes, 3 absent and 2 abstentions
(10-9-84). It was decided at the Subdivision Committee
meeting that no building permit would be issued until
the Board passed a resolution lifting the sewer
restrictions.
1. Name: West Side Creek Apartments, Phase II, Long -Form
"PRD" (Z-4332)
2. Location: Approximately 1/4 mile west of the
intersection of Sam Peck and Highway 10 (west of
Phase I).
3. Developer: Effington and Keltner
6060 Primacy
Memphis, TN
Engineer: Brooks Jackson, Architect
2311 Biscayne
Little Rock, AR 72207
Phone; 227-8700
4. Request: "PRD" approval for the development of 142
uni s on 11.87 acres.
5. Staff Recommendation: Staff recommends approval of the
Proposed rezoning and site plan, which has been revised
to incorporate the needed changes. Staff originally
recommended denial of the application due to
insufficient access, sewer density restriction, Fire
Department comments, internal design of drives and size
and status of land to the north.
6. Planning Commission: Approval of the revised plan,
subject to the submission of the one -lot replat.
The vote was 6 ayes, 0 noes, 3 absent and 2 abstentions
(10`9-84). It was decided at the Subdivision Committee
meeting that no building permit would be issued until
the Board passed a resolution lifting the sewer
restrictions.