HomeMy WebLinkAboutZ-4305-E Staff AnalysisFebruary 14, 2002
ITEM NO.: 7
FILE NO.: Z -4305-E
NAME: Windriver Wildlife Office Park Revised Zoning Site Plan
Review
LOCATION: 2300 Cottondale Lane
r%,MTTLMT O%r% 1 .
Windriver LLC
2300 Cottondale Lane
Little Rock, AR 72202
AREA: 2.5 Acres
CURRENT ZONING:
ENGINEER:
White -Dater and Associates
24 Rahling Circle
Little Rock, AR 72223
NUMBER OF LOTS: 1
0-2
PROPOSED ZONING: O-2
CURRENT ALLOWED USES: Office
FT. NEW STREET: 0
PROPOSED USE: Office with additional parking
VARIANCES/WAIVERS REQUESTED
improvements.
Continued deferral of sidewalk --
The 2.5 acre tract (Tract F -2B, Riverdale Addition) contains a
sump and a portion of the levee, adjacent to the Arkansas
River. There is also a pump house on the property. A large
amount of the stormwater from the Riverdale Area drains -into
the sump and is pumped into the river.
February 14, 2002
SUBDIVISION
ITEM NO.: 7 (Cont.)
FILE NO.: Z -4305-E
The property is zoned 0-2 which requires a zoning site plan
review prior to development. In July of 19981 the Planning
Commission reviewed and approved, with conditions, a proposed
site plan for the development at 2300 Cottondale Lane. There
was to be under the building parking (20 spaces) and three
stories of office space. There were 57 surface parking spaces
Proposed. This has been constructed.
The applicant requested a variance to allow a reduced side yard
setback along the west property line and a variance for a
reduced setback from the floodway line. The applicant also
requested a five-year deferral of sidewalk improvements to
Cottondale Lane, which was approved by the Board of Directors
with Ordinance No. 18,358.
At the July 2, 1998 City Beautiful Commission meetingCommission approved a 4 -foot landscape buffer along the,
west
side property line and a 4 -foot landscape buffer along the
street side property line.
As a part of the recommendation presented by staff one of the
conditions placed on the applicant was should the site plan
significantly change (for example, shifting the drive and/or
parking further into the sump area) the site plan was to be
brought back before the Commission.
A. PROPOSAL/REQUEST:
The applicant is proposing to modify the previously
approved Windriver Building Site Plan. The applicant
Proposes the addition of nine surface parking spaces. The
additional spaces will require only two percent of the
site and are necessary to accommodate a new 9,000 square
foot tenant, who will occupy a majority of the building's
remaining vacant space.
With the addition of nine surface parking spaces there
will be a total of 86 spaces on the site. There are
currently 77 parking spaces on the site, 20 of which are
beneath the building and 57 surface parking spaces. The
Proposed parking ratio will be one space per 383 square
feet of gross space. The applicant proposes to remove a
Portion of the interior landscaping in front of the
building to add the additional spaces. The site contains
2
February 14, 2002
SUBDIVISION
ITEM NO.: 7 (Cont.)
B.
C.
ED I
FILE NO.: Z -4305-E
a "Natural Area" (a sump), which encompasses approximately
25 percent of the site.
The Board of Directors granted the applicant a deferral
for the placement of a sidewalk along Cottondale Lane on
September 191 2000. The applicant is requesting this
deferral be continued for the five years, which was
granted by Ordinance No. 18,358.
EXISTING CONDITIONS:
The site contains an office building, surface parking in
front of the building and a large drainage retention pond,
a sump. The site contains minimum interior landscaping,
four fent along the north property line and four feet
adjacent to the street right-of-way. There is an office
building to the north of site and further north is the
Alltel Campus. Property to the south is also developed
with office buildings. The area to the east is the
Arkansas River. The property located to the west of the
site is currently vacant and zoned 0-2. Other uses in the
area include a mix of office and mixed office warehouse
uses located along Jessie and Water Works Drive.
NEIGHBORHOOD COMMENTS:
As of this writing staff has received one informational
phone call concerning the project. All property owners
within 200 feet of the site, all residents within 300 feet
of the site who could be identified and the Hillcrest
Neighborhood Association were notified of the public
Hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Provide letter from Levee District allowing encroachment
on storm water detention pond.
2. Construct sidewalk on Cottondale Lane.
3. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
3
February 14, 2002
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z -4305-E
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater:
Sewer is available, not adversely affected.
End: Approved as submitted.
ARKLA: No comment received.
Southwestern Bell: Approved as submitted.
Water: No objection.
Fire Department: Approved as submitted.
COULty Planning: No comment received.
CATA: Site on Bus Route #21 and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Plannin Division: No comment.
Cit Recognized Nei hborhood Action Plan:
The site lies in an area, which is not currently covered
by a City recognized Neighborhood Action Plan.
Landscape Issues:
The interior landscaping left still meets the interior'
landscaping requirement of the Landscape Ordinance with
the reduction allowed within the designated "mature area".
If this site were not within the designated "mature area"
it would fall 118 square feet short of the normal
requirement of 8%. This calculation does not include the
sump area as interior landscaping.
Previously, this site was granted a width variance of the
street landscaping buffer by the Planning Commission and
perimeter landscaping width requirements by the City
4
February 14, 2002
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z -4305-E
Beautiful Commission. When these variances were granted,
the interior landscaping proposed for deletion was shown
on the plans submitted.
With the current proposal, the applicant is offering to
plant 14 additional trees along the perimeter of the sump
area.
Buildin Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT:
(January 24, 2002)
There was no one present representing the application.
Staff presented the item to the Committee with nc
discussion. Staff stated they would work with the
applicant to address the additional information needed -on
the site plan.
The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS•
The proposed project, with the removal of the landscaping
buffer on the south edge of the sump, will still meet the
minimum will requirement of the Landscape
Ordinance. With the current proposal, the applicant is
proposing to plant 14 additional trees along the perimeter
of the sump area. Public Works staff has requested the
applicant contact the Levee District and request
permission to encroach on the storm water detention pond'
with these plantings.
The proposed parking would add 9 spaces to the existing 77
spaces on the site. The building is 34,000 square feet
and is occupied primarily by office uses. The building
currently leases space to the Brave New Restaurant but the
square footage of floor area is considered an auxiliary
use since the square footage occupied by the restaurant is
10% of the total. Therefore, the typical parking
requirement would be considered at the rate for office
parking, (85% of the parking requirement for buildings
over 30,000 square feet of one space per 400 square feet).
5
February 14, 2002
SUBDIVISION
ITEM NO.: 7 (Cont.)
I.
FILE NO.: Z -4305-E
The typical parking requirement for a building this size
would be 72 parking spaces. Since the applicant is
proposing 86 total spaces, this would be more than
adequate to meet the potential parking demand.
Staff is not supportive of the requested deferral of
sidewalk improvements along Cottondale Lane.
Staff is supportive of the application as filed, if the
applicant receives permission from the Levee District to
encroach into the sump area and place the additional
trees. The applicant was granted a reduction in
landscaping requirements at the time of the original
application under the assumption the area designated to be
removed from landscaping, to place the additional parking
spaces, was to remain as "green space". With the addition
of the 14 trees on the site this should mitigate the
effect of the loss of the current landscape strip.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed zoning site plan
review subject to compliance with the conditions outlined
in Paragraphs E, E, F and H of this report.
Staff is not supportive of the application should the
applicant fail to receive approval from the Levee District
to encroach on the storm water detention pond with the
plantings.
Staff is not supportive of the request for a continued
deferral of sidewalk improvements to Cottondale Lane.