HomeMy WebLinkAboutZ-4305-A Staff AnalysisFebruary 24, 1987
SUBDIVISIONS
Item No. 8
NAME: Edgewater Center Site Plan
Review (Z -4305-A)
LOCATION: The east side of Cottondale
Lane just northwest of
Jesse Road
(2300 Cottondale Lane)
OWNER/APPLICANT: Pleasant Valley, Inc./
Allison, Moses, Reddin
Real Estate, Jim Nosari
PROPOSAL:
To construct a three story (36 feet) 15,000 square feet
office building and 39 parking spaces on 3.8 acres of land
that is zoned "0-2."
ANALYSTS
The proposed site meets ordinance requirements with regard
to parking (35 spaces required). The applicant does,
however, need to submit a revised site plan that clearly
delineates the 25' landscape area for the full length of the
Cottondale Lane boundary. In addition, dimensions should be
added for the other buildings on-site as well as for the
drive and the parking area. The dimension between the metal
building and the proposed office should also be -shown (20'
is required by ordinance). Finally, the applicant needs to
final plat this property.
CITY ENGINEERING COMMENTS
The applicant needs to get the proposed parking layout
approved by the City traffic engineer.
February 24, 1987
SUBDIVISIONS
Item No. 8 - Continued
STAFF RECOMMENDATION
Approval, provided the applicant agrees to: (1) submit a
revised site plan that includes the information as requested
above; (2) file a final plat for the property; and (3) get
the City traffic engineer's approval of the proposed parking
area.
SUBDIVISION COMMITTEE REVIEW:
The applicant was present. The staff stated that
Southwestern Bell had requested an easement. The Water
Works stated that on-site fire protection would be
required and the Wastewater Utility stated that a main
extension would also be required. The applicant agreed to
comply with staff and utility recommendations.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. The
staff stated that the applicant had submitted a revised site
plan and had filed a final plat. The staff recommended
approval of the revised submittal. The Commission then
voted 8 ayes, 0 noes, and 3 absent to approve the
application as recommended by the staff.