HomeMy WebLinkAboutZ-4289-A Staff AnalysisJuly 2, 2015
ITEM NO.: 4 FILE NO.: Z -4289-A
NAME: Branch Communications Cellular — Tower Use Permit
LOCATION: 9300 Geyer Springs Road
OWNER/APPLICANT. The Great River Region of the Christian Church/
Branch Communications
PROPOSAL: A tower use permit is requested to allow for
construction of a wireless communication facility
containing a 150 foot tall monopole tower and
associated ground equipment on this R-2 zoned
church property.
SITE LOCATION:
The WCF site is located on the rear portion of this church property. The
church is located on the west side of Geyer Springs Road, south of
Baseline, across from McClellan High School.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The property is located within an area of Geyer Springs Road that
contains several institutional uses; including the large high school and 4-5
churches. A residential neighborhood extends to the west. The WCF site
is located on the rear portion of the church property. The monopole tower
is 150 feet from the nearest property occupied by a single family
residence. Mature trees are located along the west and north perimeters
of this portion of the church property which will aid in screening the tower
from the residences.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the property and the SWLR United for Progress, Santa
Monica, Allendale and OUR Neighborhood Associations.
3. ON SITE DRIVES AND PARKING:
Access to the WCF site will be via an access easement through the
church parking lot. No new driveways or curb cuts to the street are
proposed. The WCF site and church parking lot will provide all needed
parking for the WCF.
July 2, 2015
ITEM NO.: 4 [Cont.
4. SCREENING AND BUFFERS:
FILE NO.: Z -4289-A
Landscaping and screening are to comply with the provisions of Chapter
36, Article XII, Section 36 — 593 as follow:
(1) All existing and new WCF shall be screened and landscaped as
follows:
(a) All WCF subject to this section shall contain a permanent
six-foot landscape strip parallel with all sides of the primary use
area and outside of the opaque fence but within the lease area,
except for a space for ingress and egress to the primary
use area.
(b) An eight -foot opaque fence shall be constructed, finished side
facing outward, around the primary use area to provide
screening and a background for required landscaping within the
six-foot landscape strip.
(c) The opaque fence shall also satisfy the security fence shall also
satisfy the security fence requirement of subsection (f).
The landscape strip on each side of the primary use area shall
be planted with two (2) trees of a two-inch caliper which will
grow to a spacing of fifteen (15) feet which will grow to a
minimum twenty (20) feet in height at maturity. Each landscape
strip shall also be planted with evergreen shrubs of thirty (30)
inches height at planting, with a maximum spacing of forty-eight
(48) inches on center and which will grow to a minimum height
of sixty (60) inches at maturity.
5. PUBLIC WORKS COMMENTS:
1. Geyer Springs Rd is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 feet from centerline will be
required.
2. A special Grading Permit for Flood Hazard Areas will be required per
Sec. 8-283 prior to construction.
3. A grading permit in accordance with section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans
must be submitted and approved prior to the start of construction.
4. The proposed site appears to be within the 100 year floodplain. The
minimum Finish Floor elevation for any improvements of 274 ft. or
higher is required to be shown on plat and grading plans.
4
July 2, 2015
ITEM NO.: 4 (Cont.
FELE NO.: Z -4289-A
5. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25
foot wide drainage and access easement is required adjacent to the
floodway boundary.
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: Entergy does not object to this proposal. A three phase power
line exists on the north side of the property and single phase power lines
exist on the east and west side of the property. Care should be used in
erecting the tower so that proper clearances are maintained from the
energized power lines. Contact Entergy in advance regarding future
service requirements and additional facilities location(s) as this r)roiect
proceeds.
Centerpoint Energy: No comment received.
AT&T: No comment received.
Central Arkansas Water: No Objection.
Fire Department: No comments.
Building Codes: Project is subject to full commercial plan review approval
prior to issuance of a building permit. For information on submittal
requirements and the review process, contact a commercial plans
examiner:
Structural Plan/Calculations required.
Mark Alderfer at 501.371.4875; malderfer-littlerock.org.
County Planning: No comments.
CATA: The site is not located on a CATA bus route. The nearest route is
located along Baseline Road, to the north.
SUBDIVISION COMMITTEE COMMENT: (JUNE 10, 2015)
Kayla Kramer of Branch Communications was present. Staff presented the item
and noted that the proposed WCF complied with all aspects of the code with the
exception of the setback from an R-2 zoned lot to the south. It was noted that
the lot in question was also owned by the church and was occupied by a church
office building, not a residence.
3
July 2, 2015
ITEM NO.: 4 (Cont.
FILE NO.: Z -4289-A
Staff noted there was an existing cellular tower at 9425 Geyer Springs.
However, the applicant stated a structural analysis completed on this tower
returned failing results.
Public Works Comments were discussed. Ms. Kramer stated the plan would be
modified to indicate the proper finished floor elevation as required. Staff
discussed the need for floodway, drainage and access easements for the
floodway. Ms. Kramer stated she would work with the property owner to address
those issues.
Other agency comments were noted.
The Committee determined there were no other issues and forwarded the item to
the full Commission.
STAFF ANALYSI
Branch Communications is requesting approval of a Tower Use Permit to allow
for construction of a wireless communication facility (WCF) on this R-2 zoned
church property. The WCF is to be located within a 40'X 40' lease area on the
rear portion of the property, behind the church building. Access will be through
the church parking lot via an access easement.
The WCF site will consist of a 150' tall monopole cellular tower and associated
ground equipment. The WCF site will be enclosed by an 8' tall, wood screening
fence. The required 6' wide landscape strip will be installed around all perimeters
of the site. The cellular tower will be designed to accommodate T -Mobile and up to
three additional carriers. A statement allowing those colocations has been
provided. A statement of effective radiated power (ERP) compliance with Federal
Communication Commission standards has been provided.
This proposed WCF is in fairly close proximity to another cell tower located at 9425
Geyer Springs, on the McClellan High School campus. Branch Communications
has provided a structural analysis report on that tower showing the tower to have
insufficient structural capacity to accommodate an additional carrier.
This proposed WCF site complies with all provisions of the code with one
exception. The tower is setback less than 150 feet from an R-2 lot to the south.
The tower is set at 99 feet from that property. The property in question, although
R-2, is owned by this same church and contains a church office building, not a
residence.
E!
July 2, 2015
ITEM NO.: 4 (Cont.
The church property and proposed WCF site are separated from the residences to
the west and north by Little Fourche Creek and matures trees. The tall trees will
help to provide visual screening of the tower.
To staff's knowledge, there are no outstanding issues. Prior to submittal for
building permit, the plans will need to be revised to indicate proper finished floor
elevation. Right-of-way and floodway easements will also need to be dedicated
prior to building permit submittal. No bill of assurance is required for TUP
submittals.
STAFF RECOMMENDATION:
Staff recommends approval of the requested TUP subject to compliance with
the comments and condition outlined in Sections 4, 5 and 6 of the agenda staff
report.
PLANNING COMMISSION ACTION: (JULY 2, 2015)
The applicant was present. There were no objectors present. Staff presented the
item and a recommendation of approval as outlined in the "staff recommendation"
above. There was no further discussion. The item was placed on the consent
agenda and approved, including all staff comments and conditions. The vote was
10 ayes, 0 noes and 1 absent.
5