HomeMy WebLinkAboutZ-4285-C Staff AnalysisJuly 2, 2015
ITEM NO.: 3 FILE NO.: Z -4285-C
NAME: Catholic High School Athletic Fieldhouse —
Revised Conditional Use Permit
LOCATION: 6300 Father Tribou Drive
OWNER/APPLICANT: Diocese of Little Rock/Wittenberg, Delony and
Davidson
PROPOSAL: A revision to the approved conditional use permit is
requested to allow for construction of a new athletic
fieldhouse larger than what was previously approved.
VA
SITE LOCATION:
The site is located on the north side of Father Tribou Drive, west of N.
University. The fieldhouse building will be located at the northwest corner
of the athletic field (same location as previously approved).
COMPATIBILITY WITH NEIGHBORHOOD:
The fieldhouse building was approved as a part of the April 26, 2012 CUP
approval which included the new athletic field and associated facilities.
Through that process, the school worked with the neighbors to the north to
mitigate any impact by preserving and entrancing the buffer on the north
side of the campus. This proposed building is to be placed in exactly the
spot previously .approved. It is proposed to be increased in size from
21,000 sq. ft. to 30,000 sq. ft. All previously imposed and agreed-upon
conditions remain in place. Allowing the increase in size should not affect
the building's compatibility with the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the Evergreen and Hillcrest Neighborhood
Associations. The school is scheduled to hold an open house prior to the
Commission meeting for interested parties to view the proposed
development.
3. ON SITE DRIVES AND PARKING:
The parking requirement for a high school is determined by the number of
classrooms and the number of employees. None of those elements are
changing. The campus currently contains 397 parking spaces in lots
taking access off of Father Tribou Drive. A small parking lot containing
7 parking spaces is to be built adjacent to the new athletic fieldhouse.
Access to that lot will be through the existing parking lot.
July 2, 2015
ITEM NO.: 3 Cont. FILE NO.: Z -4285-C
4. SCREENING AND BUFFERS:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
Previous landscape comments apply (Z -4285-B).
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
5. PUBLIC WORKS COMMENTS:
1. At time of construction, University Ave. is classified on the Master
Street Plan as a principal arterial. Dedication of right-of-way to
55 feet from centerline will be required. Confirm right-of-way has
been dedicated with construction of football field.
2. At time of construction, due to the proposed use of the property, the
Master Street Plan specifies that Father Tribou Street for the
frontage of this property must meet commercial street standards.
Dedicate right-of-way to 30 feet from centerline. Confirm that right-
of-way has been dedicated with construction of the football field.
3. At time of construction, a 20 feet radial dedication of right-of-way is
required at the intersection of University Ave. and Father Tribou St.
Confirm the right-of-way has been dedicated with the construction
of the football field.
4. Repair or replace any curb and gutter or sidewalk that is damaged
in the public right-of-way prior to occupancy.
5. Storm water detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
6. A grading permit in accordance with section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans
must be submitted and approved prior to the start of construction.
Is a variance requested to begin grading and earthwork without
construction being imminent.
7. Retaining walls designed to exceed 15 ft. in height are required to
seek a variance for construction. Provide proposed wall elevations.
This applies if the retaining wall is not a part of the proposed
foundation wall of the facility.
2
July 2, 2015
ITEM NO.: 3 (Cont.) FILE NO.: Z -4285-C
8. Prior to construction of retaining walls, an engineer's certification of
design and plans must be submitted to Public Works for approval.
After construction, an as -built certification is required for
construction of the retaining wall. This applies if the retaining
wall is not a part of the proposed foundation wall of the facility.
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to project. Sewer Main Relocation required
to construct project as shown.
Entergy: Entergy does not object to this proposal. The existing building is
currently served via an underground line and a padmount transformer —
neither of which should be impacted by the footprint of the larger building
or parking lot. If the location of the electrical facilities do pose an issue as
the project develops, please contact Entergy so adjustments can be
discussed and changes made as agreed upon. The customer should
contact Entergy in advance if changes in the electrical service are required
to meet the electrical needs of the new building.
Centerpoint Energy: No comments received.
AT&T: No comments received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request
for water service must be met.
Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by
the Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
Contact Central Arkansas Water regarding the size and location of the
water meter.
3
July 2, 2015
ITEM NO.: 3 (Cont.) FILE NO-, Z -4285-C
The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
material and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
are used, a reduced pressure zone backflow preventer shall be required.
This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department:
Fire Hydrants
Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is
located on a fire apparatus access road, the minimum road width shall be
26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed
shall be accessible to fire department apparatus by way of an approved
fire apparatus access road with an asphalt, concrete or other approved
driving surface capable of supporting the imposed load of fire apparatus
weighing at least 75,000 pounds.
2
July 2, 2015
ITEM NO.: 3 (Cont.
Dead Ends.
FILE NO.: Z -4285-C
Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
Section D103.4 Dead Ends. Dead-end fire apparatus access roads in
excess of 150 feet shall be provided with width and turnaround provisions
in accordance with Table D103.4. Requirements for Dead-end fire
apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire
apparatus access road gates. Gates securing the fire apparatus
access roads shall comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation
by one person.
4. Gate components shall be maintained in an operable condition at all
times and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by
fire department personnel for emergency access. Emergency opening
devices shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is
installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the
fire code official
8. Electric gate operators, where provided, shall be listed in accordance
with UL 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central
Arkansas Water (Jason Lowder 501-377-1245) and the
5
July 2, 2015
ITEM NO.: 3(Cont.)FILE NO.: Z -4285-C
Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501-918-3757).
Number and Distribution of Fire Hydrants as per Table C105.1.
Building Codes: Project is subject to full commercial plan review and
approval prior to issuance of a building permit. For information on
submittal requirements and the review process, contact a commercial
plans examiner:
Curtis Richey at 501.371.4724; criche littlervck.or or
Mark Alderfer at 501.371.4875; malderfer liftlerock.or
County Planning: No comments
CATA: The site is located on a CATA bus route.
SUBDIVISION COMMITTEE COMMENT: (JUNE 10, 2015)
Wallie Sprick and Dan Beranek were present representing the application. Staff
presented the item and noted the proposed change in building size. It was noted
that there were no other changes from the April 2012 CUP approval.
Public Works Comments were discussed. The applicants were asked to provide
proof that the previously required right-of-way dedications for the abutting streets
had been accomplished. In response to questions, the applicants stated an
advance grading request would be made to allow for preparation of the site and
construction of the retaining wall. They stated the retaining wall would form one
wall of the proposed building.
Other agency comments were noted.
The applicants stated a meet -and -greet would be set up at the school for the
neighbors to view the plans prior to the commission meeting.
The Committee determined there were no other issues and forwarded the item to
the full Commission.
STAFF ANALYSIS:
On April 26, 2012, a conditional use permit was approved to allow Catholic High
School to construct a new athletic field on the east side of the campus; replacing
an existing, informal athletic play area. The approval included a synthetic turf
football field, also sized for soccer, with an eight lane running track around the
perimeter of the field. Also included were new lighting and bleacher style seating
9
July 2, 2015
ITEM NO.: 3 Cont. FILE NO.: Z -4285-C
for 500 fans with future expansion for an additional 1,000 fans. The CUP
approval included a new, two-story, 21,000 square foot athletic fieldhouse
building to be constructed at the northwest corner of the athletic field. The new
fieldhouse was to also include public restrooms and a concession facility. The
new field is to be used for football and soccer practices, freshman football games
and junior varsity games. Varsity football games are to remain at War Memorial
Stadium for the foreseeable future. The athletic facility will primarily be used
after school hours, evenings and some weekends during soccer and football
seasons. Throughout the review of the 2012 application, the neighbors to the
north and the school worked together to arrive at a plan that preserved and
enhanced the screening buffer along the north perimeter of this portion of the
school campus.
The athletic field, running track, lighting and initial bleacher seating have been
installed and are in use.
Catholic High is requesting a revision to the approved CUP to increase the
previously approved square footage for the fieldhouse from 21,000 square feet to
30,000 square feet. The new building is still a two-story structure with an eave
height of 31 feet. The building is to be located in the previously approved spot
and no other changes to the approved site plan are proposed.
The building's lower level will contain a weight room, multi -use turf area, locker
rooms, toilets, showers and support areas along with a concession stand. The
upper level will be accessed from the existing upper level parking lot and will
contain a wrestling room, coach's offices, restrooms and three team
meeting/classrooms. The exterior of the building will be a combination of metal
panels, E.I.F.S. and brick that matches the main school building.
The addition of the building will not increase the school's enrollment. The school
will not be adding any teaching or support staff to occupy the building. The new
facility will offer flexibility in scheduling classes and allow the school to better
meet the needs of its athletes.
The existing ADA parking spaces adjacent to the new building will remain. The
access road will be paved as previously approved and will continue to be
restricted to service vehicles and ADA parking during events on the athletic field.
An advance grading permit is requested to allow for site preparation and
construction of the retaining wall that will be the future west wall of the new
building.
7
July 2, 2015
ITEM NO.: 3 (Co
FILE NO.: Z -4285-C
To staff's knowledge, there are no outstanding issues. All previously approved
conditions remain in place. There is no bill of assurance for this acreage tract.
STAFF RECOMMENDATION:
Staff recommends approval of the requested revision to the approved CUP,
subject to compliance with the comments and conditions outlined in Sections 4, 5
and 6 of the agenda staff report.
Staff recommends approval of the advance grading request.
NNING COMMISSION ACTION: (JULY 2, 2015)
The applicant was present. There were no objectors present. Staff presented the
item and a recommendation of approval as outlined in the "staff recommendation"
above. Staff also recommended approval of the requested advance grading
request. There was no further discussion. The item was placed on the consent
agenda and approved, as recommended by staff and including the advance
grading request, by a vote of 10 ayes, 0 noes and 1 absent.
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street
Little Rock, Arkansas 72201-1334 Zoning and
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision
Wallie Sprick
WD&D Architects
400 W. Capitol Avenue Suite 1840
Little Rock. AR 72201
Date: July 6 2015
Dear Mr. Sprick:
Case No. Z -4285-C
Location: 6340 Father Tribou Drive
This is to advise you that in connection with your application for a conditional use permit, the Planning
Commission at its meeting on July 2, 2015,
Approved your application as submitted.
Denied your application as submitted.
Deferred action to the
Meeting.
X Approved your application with the following
conditions: See the conditions outlined in the Planning -Commission
minutes.
This is an approval for the USE only and was the first step in the process. Based on this use approval,
you may submit your documentation and plans for review and permitting. All new and alteration
construction requires building permits be obtained at 723 West Markham, 2"d floor BEFORE any work
may begin. All permits required for implementation of the conditional use must be obtained within three
(3) years of the date of the Commission's approval or the Conditional Use Permit shall be revoked.
Please be advised that there is an appeal period for 30 days from the date the Planning Commission made
its decision. Any permits obtained or construction performed during this 30 day appeal period is done at
your own risk and could be voided by the appeal process.
If you have any questions, please call me at 371-6817.
Sincerely,
C4
Dana Carney, Zoning and S div ion Manager
Department of Planning and Development
DC/aa
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision
Date May 27, 2015
Wallie Sprick
WD&D Architects
400 W. Capitol Ave., Suite 1800
Little Rock, AR 72201
Re: Conditional Use Permit Application at 6300 Father Tribou Drive
Dear: Mr. Sprick:
I have received your application for a conditional use permit for the property located at 6300 Father
Tribou. The following is to remind you of important dates in the process.
The sign provided to you must be posted on the property no later than June 2 2015
Required notices to owners of properties located within 200 feet of the subject property must be
sent via certified mail no later than June 17, 2015. You must use the notice form provided to you
by our office and you must obtain the list of property owners from an abstract or title company.
The Subdivision Committee meeting for your application is June 10 2015 at 12:00 noon. The
meeting will be held in the Board of Directors' chamber located on the second floor of City Hall
at 500 W. Markham Street. You or your authorized representative must be present.
Your item has been scheduled for the July 2, 2015 Planning Commission meeting. The meeting
will begin at 4:00 p.m. and will be held in the Board of Directors' chamber located on the second
floor of City Hall. Again, you or your authorized representative must be present.
If you have any questions, please contact me at (501) 371- 6817 or at dcarne ri littlerock.orm.
S' cerely,
Dana Carney
Zoning and Subdivision Manager