HomeMy WebLinkAboutZ-4285-A Staff AnalysisAugust 19, 1999
ITEM NO.: 16
NAME:
LOCATION:
OWNER/APPLICANT:
FILE NO: Z -4285-A
Catholic High School - Revised Conditional
Use Permit
6300 Lee Avenue
Catholic Diocese of Little Rock/Bartlett and
West Engineers
PROPOSAL: To amend an existing conditional use permit
to construct a 5700 square foot science
building on the existing campus at 6300 Lee
Avenue on property Zoned R-2, Single Family
Residential.
ORDINANCE DESIGN STANDARDS:
1. SITE LOCATION:
This 23.25 acre site is on the north side of Lee Avenue, on
the northwest corner of Lee and University Avenues.
2. COMPATIBILITY WITH NEIGHBORHOOD:
This site is located adjacent to a developed residential
neighborhood Zoned R-2, Single Family Residential, and
abuts R-2 Zoning to the north and west. To the south, and
east across University, the zoning is primarily 03, General
Office. The school has existed at this site for many years
and is compatible with the neighborhood. Staff believes
that this additional building will not change that
compatibility.
The Evergreen and Hillcrest Neighborhood Associations were
notified of the Public Hearing.
3. ON SITE DRIVES AND PARKING:
This site currently has three access driveways to Lee
Avenue and 372 parking spaces. Parking requirements for
secondary grades (7-12) are based on the number of
classrooms (6 parking spaces per classroom), and a need for
stacking space for buses and autos. The 31 classrooms which
would exist after the addition would require 186 parking
August 19, 1999
SUBDIVISION
ITEM NO.: 16 (Cont.) FILE NO: Z -4285-A
spaces, 6 of which would need to be handicapped accessible,
plus stacking space. The existing area is more than
sufficient.
4.
SCREENING AND BUFFERS:
No comment.
5. PUBLIC WORKS COMMENTS:
a. University Avenue is listed on the Master Street Plan as
a principal arterial. A dedication of right-of-way to 55
feet from centerline is required.
b. A 20 feet radial dedication of right-of-way is required
at the corner of University and Lee Avenue.
c. Repair or replace any curb and gutter or sidewalk that is
damaged in the public right-of-way prior to occupancy.
Construct 5 feet wide sidewalk along University Avenue at
right-of-way line.
d. Stormwater detention ordinance applies to this property.
e. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
6. UTILITY AND FIRE DEPT. COMMENTS:
Water: Details need to be worked out to provide adequate
water service to this expansion. Also, a contract will be
required for the existing fire service that was apparently
installed some time ago without our knowledge.
Wastewater: Sewer available, not adversely affected.
Southwestern Bell: Approved as submitted.
ARKLA: Approved as submitted.
Entergy: No comments received.
Fire Department: Approved as submitted.
CATA: CATA Routes #8, Rodney Parham, and #21, University
Avenue, serve this site; approved for transit purposes as
submitted.
2
August 19, 1999
SUBDIVISION
ITEM NO.: 16 (Cont.)
7. STAFF ANALYSIS:
FILE NO: Z -4285-A
The applicant is requesting amendment of an existing
conditional use permit, granted August 1984, to allow for
the addition of a one story 5700 square foot science
building on the existing 23.25 acre campus which is Zoned
R-2, Single Family Residential.
Current ordinance requires a five foot wide sidewalk be
installed by the applicant along the adjacent street
frontages. This would apply along University Avenue and a
small area at the west end of the property near the
intersection of McKinley Street and Lee Avenue.
All siting and parking requirements are exceeded. Staff
believes this proposal should not negatively impact the
current compatibility with the surrounding area.
8. STAFF RECOMMENDATION:
Staff recommends approval of the conditional use permit
subject to compliance with Public Works Comments and the
Water Works Utility Comment. Public Works Comments would
include the added sidewalk at the west end of the property
near the intersection of McKinley Street and Lee Avenue
along the north side of Lee.
SUBDIVISION COMMITTEE COMMENTS:
(July 29, 1999)
Thomas Graham and Jim Hamrin were present representing the
application. Staff gave a brief description of the proposal.
Public Works briefly reviewed their comments and added a
requirement for a sidewalk extension at the west end of the
property near the intersection of McKinley Street and Lee Avenue
along the north side of Lee.
A short discussion took place to clarify with the applicant
exactly what was required along University and their concerns
over possible difficulties in completing that work. Public Works
stated that the sidewalk could be worked in with the existing
school sign without changing the sign. They added that they
could not support building the sidewalk immediately adjacent to
3
August 19, 1999
SUBDIVISION
ITEM NO.: 16 (Cont.)
FILE NO: Z -4285-A
the curb on University , it required a minimum four foot
landscape strip between the curb and the sidewalk.
There being no further issues, the Committee accepted the
proposal and forwarded the item to the full Commission for final
resolution.
PLANNING COMMISSION ACTION: (AUGUST 19, 1999)
Ed Ebbing from Bartlett & West Engineers was present
representing the application. There were no registered objectors
present. Staff presented the item with a recommendation for
approval subject to compliance with the conditions listed under
"Staff Recommendation." That included the requirement for an
extension to the sidewalk at the west end of the property on the
north side of Lee at the intersection of McKinley Street and Lee
Avenue.
The item was placed on the Consent Agenda and approved as
recommended by Staff. The vote was 6 ayes, 0 nays, and 5 absent.