HomeMy WebLinkAboutZ-4269 Staff AnalysisJuly 24, 1984
Item No. 7 -- Z-4269
Owner: Don Capps
Applicant: Lee Lemons and Don Capps
Location: New Benton Highway West of
Production Drive
Request: Rezone from "R-2" Single Family to
11I-2" Light Industrial
Purpose: Camper and Motor Home Sales Lot
Size: 2.30 acres +
Existing Use: Vacant
SURROUNDING LAND USE AND ZONING:
North - Interstate Right -of -Way, Zoned "R-2"
South - Vacant, Zoned "I-2"
East - Commercial, Zoned "I-2"
West - Industrial, Zoned "C-3"
PLANNING CONSIDERATIONS:
1. The proposed use for the property is a sales lot for
campers, motor homes, and other recreational type
vehicles. The site is located along the section of
I-30 that has a number of uses that range from a motel
to some manufacturing. This property has industrial
use on one side and a truck sales facility on the east
side. The zoning patterns are similar with "I-2"
zoning abutting property on two sides, "C-3" on the
west side and the interstate on the north. Over recent
months, "R-2" tracts in the area have been rezoned to
either "C-3" or "I-2."
2. The site is vacant and flat. The property has been
used in the past for a mobile home sales lot.
3. There are no right-of-way requirements or Master Street
Plan issues associated with this request.
4. There have been no adverse comments received from the
reviewing agencies at this time.
July 24, 1984
Item No. 7 - Continued
5. There are no legal issues.
6. The property was part of the large I-30 annexation that
took place in 1979. The property was annexed as "R-2."
7. The Suburban Development Plan identifies the location
for strip development for which a vehicle sales lot is
the appropriate use. "I-2" or "C-3" and "C-4" are the
zoning classifications normally associated with this
type of development pattern. There are no outstanding
issues and staff supports the rezoning.
STAFF RECOMMENDATION:
Staff recommends approval of the request as filed.
PLANNING COMMISSION ACTION:
The applicant was present. There were no persons in
attendance objecting to the rezoning. The Planning
Commission discussed the case briefly and then voted
10 ayes, 0 noes and 1 absent to recommend approval of the
rezoning as filed.
'i
July 16, 1984
Item No. 3 - Z -4269-A
Owner: Don Capps
Address: New Benton Highway approximately
600 feet west of Production Drive
and immediately east of the
Munsey Products Plant
Description: Long Legal
Zoned: "R-2" Single Family District
(An application for "I-2" Light
Industrial has been filed.)
Variance
Requested: From the rear yard setback provisions of
Section 43/7.104.2.E.3 to permit a
rear yard setback of 10 feet for a new
building.
JUSTIFICATION:
1. Provide for more parking convenience for customers.
2. Display product to be sold.
3. Existing structures on property lines on buildings
surrounding the property.
4. Considering the proposed site plan, I feel that display
of my product on asphalt paving in front of sales and
service facility will improve the general appearance of
the property.
5. In case of fire or other emergencies, several 14' x 14'
doors will allow access from the side of building. The
drives will be open to any and all such traffic.
Present Use
of the Property:
Proposed Use
of the Property:
STAFF REPORT:
Vacant Land
Camper sales
A. Engineering Issues
None reported at this writing.
July 16, 1984
Item No. 3 - Continued
B. Staff Analvsis
This application involves a vacant acreage tract which
has no physical or design problem that could be termed
a hardship. The primary concern offered is the
applicant's statement of visibility of his merchandise
and convenience of his customers. The staff feels that
the proposed building could be sited in a fashion that
would offer both visibility of merchandise and
conformance to the Ordinance. While it is true that•
several neighboring buildings such as the Munsey
Products Building do intrude on setbacks, those
generally occurred prior to annexation. We do not
support acceptance of those standards in lieu of the
Zoning Ordinance requirements.
C. Staff Recommendation
Denial of the request.
BOARD OF ADJUSTMENT ACTION:
The applicant, Don Capps, was present. There were no
objectors present. Mr. Capps said that they had outgrown
there present location on South University and needed
additional space. He then went on to discuss the proposed
building and site plan. The plan provided adequate parking
for customers and good circulation. Mr. Capps said this was
important because of having to accommodate very large
vehicles such as motor homes. He described the proposed
building"which would have office and warehousing in the
front with a service department located at the rear. There
was some discussion about the impact of a 10 -foot rear yard.
There were additional comments made by Mr. Capps addressing
the variance and the hardship. A motion was made to
recommend denial of the request. The motion passed by a
vote of 7 ayes, 0 noes and 2 absent. The variance was
denied.
July 10, 1984
SUBDIVISIONS
Item No. 4
NAME:
Hughes Street Office Park PUD
(Z-4249)
LOCATION: Southwest intersection of
Hughes and I-630
DEVELOPER: ENGINEER/APPLICANT:
Urban Developers, Inc. Steve Sharp
8545 Leesburg Pike Riddick Engineering Corp.
Vienna, Virginia 22180 1600 First Commercial Bldg.
Phone: (703) 556-9320 Little Rock, AR 72201
Phone: 374-9219
AREA: 11.6 acres NO. OF LOTS: 1 FT. OF NEW ST.: 0
ZONING: "R-4", "R-5"
PROPOSED USES: Offices
A. Site Histor
None.
B. Development Rationale
This proposal envisions the development of the site as
a low-rise office complex with residential
characteristics, which will be provided by the scale of
the buildings and the selection of materials and colors
to be used. The developers feel that the site is
favorable to office development due to its association
to the existing commercial uses and its visibility from
I-630. It was considered as a good transitional use
from the residential on the east to the commercial on
the west.
To create the residential flair, the developer plans to
use an extensive amount of brick to enhance the visual
quality of the structure. This will be complimented
with variations in the window treatment to provide
interest and identity. 'The project will possess an
architectural uniqueness that will blend with the
surrounding residential property. Even though
buildings 5 through 11 are three stories, the slope
across the site will permit access to the second floor
to be at grade level on the uphill side. This added
feature of the terrain reduces the impact of the
structures and should give it more of a residential
July 10, 1984
SUBDIVISIONS
Item No. 4 - Continued
appearance. Since approximately 50 percent of the
project will be utilized by the medical profession, a
surplus of parking is provided. Other owners
anticipated will include real estate brokers, insurance
agents and other professional businessmen. The common
areas will be placed under the control and management
of an association. The resale or leasing of units
would be handled by each owner, who will also be
charged an annual fee for maintenance and operation of
the project.
C. Proposal
1. The construction of a condominium office park with
173 units at a density of 15 units per acre.
2. Development will be as follows:
Typical unit size .... 1,000 gsf
Buildings two story .... 38,000 gsf
Buildings three story .e.. 132,000 gsf
Total .... 170,000 gsf
3. Parking:
Required . . . . . . 80,000 gsf
(6 spaces/doctor's office) .... 480 spaces
90,000 gsf (80% of 1 space/
400 gsf = 2/1,000 gsf) .... 180 spaces
Total 660 spaces
Provided . . . . . . . . . . 80,000 gsf
(6 spaces/1,000 gsf) 480 spaces
90,000 gsf (5 spaces/1,000 gsf) .... 450 spaces
Total .... 930 spaces
4. Site Coverage:
Building ..... 13%
Paving .... (375 sq.ft. per parking space) 69%
Walks, landscape, buffer and grass ..... 18%
Total 100%
July 10, 1984
SUBDIVISIONS
Item No. 4 - Continued
5.
6.
Phasing Plan:
Phase
Building
I
4-7
II
8-10
III
1-3, 11
No. of Start Completion
Units Date Date
52 Fall 84 Summer 85
63 Summer 85 Spring 86
58 Spring 86 Winter 86
Landscaping will be extensive and should comply
with ordinance requirements.
D. Engineering Comments
Request internal drainage plan.
E. Analysis
Staff is favorable to the project. It will be a less
intense development than the approximate 336
multifamily units that could currently be built on the
site. The applicant is commended for his thoroughness
in fulfilling the submission requirements, however,
elevations are still needed.
STAFF RECOMMENDATION:
Approval.
SUBDIVISION COMMITTEE REVIEW:
The Committee reviewed the application. The applicant
submitted a revised survey and elevation. Staff reported
that conversations with the developer indicated a possible
alternate access to the west once the adjoining property is
developed.
PLANNING COMMISSION ACTION:
The applicant was present. Members of the University Park
neighborhood were present. Spokespersons from the group
included: (1) Mr. Ralph White - who requested that some
measure be provided to shield his view of the parking lot,
since the entrance to the development is directly in front
of his home; (2) Mr. Theopolis Donahue - who requested that
he continue to be allowed access to the rear of his
property; (3) Ms. Erma Hart - who objected to the
development of the property as multifamily or office based
on the possible lowering of property values, increasing
traffic, change in safety factor of neighborhood, etc.
July 10, 1984
SUBDIVISIONS
Item No. 4 - Continued
During the discussion, it was brought out that there may be
a portion of right-of-way that needs closing. The applicant
was asked to research this and close the right-of-way if
needed. Finally, a motion for approval was made based on
the following conditions:
1. The provision of an access easement to Mr. Donahue; and
2. The provision of a permanent screening area 4' from
level of parking lot consisting of cut, berm, wall,
plus landscaping and extending from entrance to south
property line and 150' north.
The motion passed by a vote of 8 ayes, 0 noes, and
3 absent.
J
July 24, 1984
Item No. 7 - Z-4269
Owner: Don Capps
Applicant: Lee Lemons and Don Capps
Location: New Benton Highway West of
Production Drive
Request: Rezone from "R-2" Single Family to
"I-2" Light Industrial
Purpose: Camper and Motor Home Sales Lot
Size: 2.30 acres +
Existing Use: Vacant
SURROUNDING LAND USE AND ZONING:
North - Interstate Right -of -Way, Zoned "R-2"
South - Vacant, Zoned "I-2"
East - Commercial, Zoned "I-2"
West - Industrial, Zoned "C-3"
PLANNING CONSIDERATIONS:
1. The proposed use for the property is a sales lot for
campers, motor homes, and other recreational type
vehicles. The site is located along the section of
I-30 that has a number of uses that range from a motel
to some manufacturing. This property has industrial
use on one side and a truck sales facility on the east
side. The zoning patterns are similar with "I-2"
zoning abutting property on two sides, "C-3" on the
west side and the interstate on the north. Over recent
months, "R-2" tracts in the area have been rezoned to
either "C-3" or "I-2."
2. The site is vacant and flat. The property has been
used in the past for a mobile home sales lot.
3. There are no right-of-way requirements or Master Street
Plan issues associated with this request.
4. There have been no adverse comments received from the
reviewing agencies at this time.
July 24, 1984
Item No. 7 - Continued
5. There are no legal issues.
6. The property was part of the large I-30 annexation that
took place in 1979. The property was annexed as "R-2."
7. The Suburban Development Plan identifies the location
for strip development for which a vehicle sales lot is
the appropriate use. "I-2" or "C-3" and "C-4" are the
zoning classifications normally associated with this
type of development pattern. There are no outstanding
issues and staff supports the rezoning.
STAFF RECOMMENDATION:
Staff recommends approval of the request as filed.
PLANNING COMMISSION ACTION:
The applicant was present. There were no persons in
attendance objecting to the rezoning. The Planning
Commission discussed the case briefly and then voted
10 ayes, 0 noes and 1 absent to recommend approval of the
rezoning as filed.