HomeMy WebLinkAboutZ-4100-C Staff AnalysisOctober 3, 2002
ITEM NO.: 6 FILE NO.: Z -4100-C
NAME: Mount St. Mary — Revised Conditional Use Permit
LOCATION: 3224 Kavanaugh Blvd.
OWNER/APPLICANT: Sisters of Mercy/Tommy Jameson, AIA
PROPOSAL: A revision to a previously approved C.U.P. is
requested to allow for the phased expansion of
facilities on this existing, R-2 zoned school campus.
ORDINANCE DESIGN STANDARDS:
SITE LOCATION:
The school is located north of the intersection of Van Buren Street and
Kavanaugh Blvd.
2. COMPATIBILITY WITH NEIGHBORHOOD:
Mount St. Mary Convent and School has existed at this location for
decades. Many of the surrounding properties are zoned R-2 and are
occupied by single family homes. Other uses in the immediate vicinity
include other churches, multifamily and neighborhood oriented
commercial. The school expansion is located entirely within the existing
school site. No increase in student enrollment is proposed. The
proposed expansion should not affect the school's continued compatibility
with the neighborhood.
All owners of property located within 200 feet of the site, all residents
within 300 feet who could be identified and the Hillcrest Neighborhood
Association were notified of this request.
3. ON SITE DRIVES AND PARKING:
When all phases are developed, the campus will have 39 classrooms with
a staff of 64; requiring 298 parking spaces. 91 of those spaces are in a
new parking lot shown along the base of the hill, adjacent to Kavanaugh
Blvd. Those spaces were shown solely to meet the City's ordinance
requirement and it is the applicant's desire to delay their construction until
phase IV, in hopes that alternative parking scenarios might develop. In so
much as the school is not increasing its enrollment and is only adding one
more classroom, staff would support such a plan.
October 3, 2002
ITEM NO.: 6 (Cont.) FILE NO.: — 100-C
4. SCREENING AND BUFFERS:
The width of the on-site street buffer along Hillcrest Avenue must not drop
below a width of fifteen (15) feet. The full requirement without transfers is
thirty (30) feet.
Interior landscape islands must be at least 300 square feet in area to
count toward fulfilling the eight (8) percent interior landscaping
requirement.
New landscaped areas will require irrigation.
Curb and gutter or another approved border will be required to protect
landscaped areas from vehicular traffic.
Prior to a building permit being issued, it will be necessary to provide an
approved Landscape Plan stamped with the seal of a Registered .
Landscape Architect.
The City Beautiful Commission recommends preserving as many existing
trees as feasible. Extra credit toward fulfilling landscape ordinance
requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
5. PUBLIC WORKS COMMENTS -
1 .
OMMENTS:
1. Kavanaugh Blvd. is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 35 feet from centerline will be
required.
2. Repair or replace any curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
3. Driveways shall conform to Sec. 31-210 or Ordinance 18,031.
4. Grading permit will be required on this development.
5. Stormwater detention ordinance applies to this property.
6. Land Alteration Ordinance applies to this property, including tree
protection and earthwork requirements.
6. UTILITY FIRE DEPT. AND LATA COMMENTS:
Wastewater: Sewer available, not adversely affected.
Entergy: Additional easements required, contact Entergy.
Reliant: No Comments received.
i•.
October 3, 2002
ITEM NO.: 6 (Cont.) FILE NO • Z -4100-C
Southwestern Bell: Approved, as submitted.
Water: The Little Rock Fire Department needs to evaluate this site to
determine whether additional public and/or private fire hydrant(s) will
be required. If additional fire hydrant(s) are required, they will be
installed at the Developer's expense.
Fire Department: Place fire hydrants per code.
CountyPlanninq: No Comments.
CATA: The site is located on CATA Bus Routes along Kavanaugh Blvd
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 12, 2002)
Tommy Jameson was present representing the application. Staff presented the
item and noted that additional information was needed regarding signage,
building heights, site lighting, fencing and student drop-off/pick-up.
Public Works and Landscape Comments were presented and discussed.
It was noted that there was no proposal to increase enrollment and the entire
project would result in a net gain of only one classroom.
Mr. Jameson stated that the lower tier of parking, in front of the HPER building,
was proposed since the parking requirements for high schools had recently been
increased. He stated that he felt the school's parking needs could be met
without having to construct that parking area. The Committee urged him to
request a parking variance and to preserve the landscaped slope rather than
construct the parking. Mr. Jameson stated the school was pursuing other
alternatives such as parking the teachers off site and prohibiting sophomore
students from driving to the campus. In response to a question from
Commissioner Berry, staff stated that there could be support for a parking
variance if alternatives were available.
The applicant was advised to submit 4 copies of a revised site plan and
responses to staff issues no later than noon, Wednesday September 18, 2002.
The Committee determined there were no other issues and forwarded the item to
the full Commission.
3
October 3, 2002
ITEM NO.: 6 Cont. FIDE NO,: Z 4100_C
STAFF ANALYSIS:
Mount St. Mary Academy, an all girls parochial school, occupies the large, R-2
zoned tract located at 3224 Kavanaugh Blvd. The school has been at this
location for nearly 100 years and has changed over the years from a convent
with a school to a large school with the remnants of a convent.
The current Conditional Use Site Plan dated 115199 illustrated a three phase plan
for improvements to the campus. Phase I was the addition of a 15,000 sf math
and science wing and was completed in May 2000. Phase II was shown to be a
renovation of the existing 50,000 sf classroom building, which is currently in
schematic design. Phase III was a proposed addition of a 15,000 sf 700 seat
auditorium on the south side of the east classroom wing.
Since the original CUP was approved, several things have happened. The
primary change is that the Sisters of Mercy, (who are the "owners" of both Mount
St. Mary Academy and the Convent) asked MSM staff if they would look
differently at the proposed site for the auditorium if they were given use of the
convent site. (Over the years, the population of sisters residing in the convent
has dropped,) Upon further study, the convent site was found to have superior
benefit and also would allow the expansion of cultural arts related classroom
space. The other noted change since '99 is the increased awareness in health
and sports related education opportunities and participation in and popularity of
girls high school sports. After studying options for expanding the existing
gymnasium, it was found that a new gym facility — in addition to the existing 9923
gym building -- would meet the needs of the school better.
The proposed revision to the Conditional Use Permit include the following
components:
Phase I Math Science Addition: Completed
Phase II Renovation of the Existing Classroom Building:
This phase remains unchanged from the previous C.U.P. This phase will include
asbestos abatement, code upgrades, envelope upgrades, and replacement of
existing mechanical and electrical systems including adding air conditioning to
the existing 50,000 sf classroom building. This phase will also include
renovation of the existing gymnasium building. The proposed scope of work
involves new mechanical/electrical systems, including air conditioning,
remodeling of the basement locker rooms and adapting the swimming pool room
to a fitness center.
October 3, 2002
ITEM NO.: 6 (Cont.) FILE NO.: Z-410
, Phase III Performing and Cultural Arts Complex:
The proposed revision to Phase III includes removal of the three convent
buildings and construction of a 51,000 sf structure including a 700 seat
auditorium, support spaces for the auditorium including lobby, scene shop and
storage, rehearsal space, classrooms (5) and support space for the art, music
and drama departments. A 21 space parking lot will be constructed near the
Hillcrest Avenue perimeter with this phase.
Phase IV Health Physical Education Recreation (HPER) Building:
This phase adds a gymnasium, locker rooms, lobby, toilets, one classroom and
staff offices, basically on the site of the original convent building. The site has
been used as parking since the demolition of the original convent building in
1987. The new 31,000 sf building would provide parking below the gym at
ground level. This phase would also include construction of the new lower tier
parking areas which were included in the original C.U.P. application.
It should be noted that through the proposed expansions of campus buildings it
is not the intent of Mount St. Mary to increase enrollment. Enrollment is
expected to remain in the 600-625 student range.
The proposed 91 space parking lot shown at the lower tier, to be constructed
with Phase IV, was shown solely to comply with ordinance parking requirements.
It is the school's hope that alternative arrangements might be found that would
preclude the development of this particular parking lot. At the end of Phase IV,
the school will have 39 classrooms, one more than the current number of 38. No
increase in enrollment beyond the current enrollment level of 600-625 is
proposed. The applicant has submitted the following parking analysis to support
the requested deferral and possible elimination of the construction of the lower
tier of parking spaces.
CLASSROOMS
Current Phase II
Phase III
Phase IV
Existing Bldgs.
38 38
38
38
Phase II (Renovate)
-3 (note 1)
-3
-3
Phase III (New Arts)
+5, -1, -1 (note 2)
+5, -1, -1
Phase IV (New HPER)
1
Totals
38 35
38
39
Note 1: In renovating the existing building, classroom configuration is altered in
multiple areas to increase classroom size and create additional offices, resulting
in the loss of 3 classrooms.
Note 2: 5 classes are gained in the Fine Arts addition, 1 existing classroom is
lost due to demolition of the Convent, and 1 existing classroom is converted to
office use.
5
October 3, 2002
ITEM NO.: 6 (Cont.) FILE NO.: Z -4100-C
On September 18, 2002, the applicant submitted an addendum to the cover
letter and 4 copies of a revised site plan addressing the issues raised at
Subdivision Committee.
The height of the proposed Performance and Cultural Arts Complex is 45 feet.
The bell tower height is 60 feet. The height of the proposed HPER building is 46
feet. No additional signage is proposed other than directional signage at the
driveway entrances and limited wall signage on the new buildings. Dumpster
location and site lighting have been "defined. Any existing fencing on the site will
be removed. No new fencing is proposed. Pick-up/drop-off areas will continue
to remain at the primary entrance to the existing building and on Jackson Street.
The proposed new buildings will be "wrapped" with a fagade treatment along the
Kavanaugh Blvd. perimeter that is reminiscent of the original convent buildings.
This design will help to visually step down the massing of the new buildings. The
lower tier of parking remains on the site plan. The applicant feels that the option
to construct that parking area must remain.
To staff's knowledge there are no outstanding issues.
STAFF RECOMMENDATION:
Staff recommends approval of the requested revised conditional use permit
subject to compliance with the development plan outlined in the applicant's cover
letter and addendum and compliance with the staff comments and conditions
noted in Sections 4, 5 and 6 of the staff report.
Staff recommends approval of the building height variances requested for the
new Performing Arts and HPER buildings. Staff would support a parking
variance, if alternatives are provided.
PLANNING COMMISSION ACTION: (OCTOBER 3, 2002)
Tommy Jameson, architect, was present representing the application. There
were no objectors present. Staff presented the item and a recommendation of
approval subject to compliance with the conditions noted in the "Staff
Recommendation" above. Staff also noted that the applicant had requested a
parking variance. Although the lower tier of parking was being left on the plan,
the applicant indicated that the school wished that area of parking to be
considered as optional; giving the school flexibility to construct, or not construct,
the parking. In light of there being no proposed increase in the school's
enrollment and a net gain of only one classroom, staff recommended approval of
the parking variance. There was no further discussion.
0
October 3, 2002
ITEM NO.: 6(Cont.)FILE NO.: Z-41 00-C
The item was placed on the Consent Agenda and approved as recommended by
staff, including the height and parking variances. The vote was 9 ayes, 0 noes
and 2 absent.