Loading...
HomeMy WebLinkAboutZ-4043-B Staff AnalysisSeptember 3, 1998 ITEM NO.: 13 NAME: LOCATION• OWNER/APPLICANT: FILE NO.: Z -4043-H McDonald's Corp. Car Wash - Conditional Use Permit 4115 South University Avenue McDonald's Corp./Roland Yates PROPOSAL: To obtain a conditional use permit to allow for a car wash to be located at 4115 South University on this C-3 zoned property. ORDINANCE DESIGN STANDARDS: 1. 2. Site Location: The site is located on the east side of University Avenue, just south of Asher Avenue and the Village Shopping Center. Compatibility with Neighborhood: The property is zoned C-3, General Commercial, and is almost surrounded by C-3 property. At about 350 feet to the southeast is residential single family R-2 zoning which is vacant land. Diagonally 400 feet to the southwest is I-2, Light Industrial property. Neither of those areas abut this site. To the north is a shopping center which includes fast food restaurants. Other commercial and office establishments lie across University Avenue to the west. This area of University Avenue is developed as commercial and this use would be compatible with the area. The Geyer Springs, Curran Conway, and College Terrace Neighborhood Associations were notified of the public hearing. 3. tin -Site Drives and Parking: The proposal includes three accesses, one off of University Avenue at the southwest corner of the property. The other two enter from the drive into the shopping center to the north. September 3, 1998 SUBDIVISION ITEM NO.: 13 (Cont.) FILE NO.: Z -4043-B The proposed 57 space parking area exceeds the 52 spaces required. Staff believes the stacking areas for the drive through lanes are sufficient. 4. Screening and Buffers: The plan submitted does not allow for the minimum 4 foot wide landscape strips required by the Landscape Ordinance along portions of the southern and northern perimeters of the site. Additionally, the plan submitted is 1,490 square feet short of the 3,042 square feet (6%) of the interior landscaping required within the paved area. Prior to a building permit being issued, three copies of a detailed landscape plan must be submitted and approved. 5. Public Works Comments: 1. University Avenue is listed on the Master Street Plan as a principal arterial, dedication of right- of-way to 55 feet from centerline will be required if not present. 2. Sidewalks shall be constructed conforming to Sec. 31-175 and the "MSP" on University Avenue. 3. Plans of all work in right-of-way shall be submitted to AHTD and City of Little Rock for approval prior to start of work. 4. Stormwater detention Ordinance applies to this property. 5. Easements for proposed stormwater detention facilities are required. 6. University Avenue has a 1996 average daily traffic count of 37,000 vehicles. 6. Utility and Fire Department Comments: Water: An acreage charge of $150/acre may apply in addition to normal fees. If any water facilities need to be relocated the work will be at the expense of the developer. Contact the Water Works regarding meter size and location. Wastewater: Sewer available, not adversely affected. Southwestern Bell: Approved as submitted. ARKLA: Approved as submitted. AP&L: No Comments received. F' September 3, 1998 SUBDIVISION ITEM NO.: 13 (Cont.) FILE NO.: Z -4043-B Fire Department: Contact the fire department, Dennis Free at 501-918-3752, about fire hydrants. 7. 8. LATA: This site is on a CATA bus route. Staff Analysis The applicant is requesting a conditional use permit tc construct a car wash on this vacant C-3 zoned, General Commercial, property as part of a commercial development. This development consists of a McDonald's restaurant with a convenience store, gas pumps, self - serve car wash and drive up ATM. All but the car wash are permitted by right in C-3. The site is surrounded by C-3 zoning, some of which is vacant. This site was previously occupied by a motel. The proposed development as amended satisfies ordinance height and area requirements, as well as parking and landscaping requirements. The dumpster enclosure and vacuum air/water station are not considered buildings unless a roof is placed over them. Therefore, their locations don't violate building setbacks. The applicant is requesting two pole signs 35 feet high, one for McDonald's, one for their oil/gas partner, which meet ordinance requirements; plus several wall signs for each use. The hours of operation are planned to be 6:00 a.m. - 11:00 p.m. Sunday through Thursday, and 6:00 a.m. to 12 midnight Friday and Saturday. The gas pumps, car wash, and ATM will be open 24 hours per day. Staff believes this is a reasonable use of the property and will be compatible with development in the area. Staff Recommendation: Staff recommends approval of the conditional use permit subject to compliance with the following conditions: 1. Compliance with Public Works, Utility and Fire Department Comments 2. Compliance with the City's Landscape and Buffer Ordinances 3 September 3, 1998 SUBDIVISION ITEM NO.: 13 (Cont.) FILE NO.: Z -4043-B SUBDIVISION COMMITTEE COMMENT: (AUGUST 13, 1998) Barksdale McKay and Michael Westerfield represented the application. Staff gave a brief description of the proposal. Staff briefly reviewed the comments by Public Works and the comments under Landscaping and Buffers about which the applicant had questions. These issues primarily involved driveway placement and landscape buffers. The applicant agreed to make the changes requested. There being no further issues, the Committee accepted the proposal and forwarded it to the full Commission for final resolution. PLANNING COMMISSION ACTION: (SEPTEMBER 3, 1998) Fred Murphy was present representing the application. There were no objectors present. Staff presented the item with a recommendation for approval subject to compliance with all staff comments listed in the Staff Recommendations. Commissioner Adcock asked for and received from Mr. Murphy his agreement to move the vacuum and water and air equipment station from the area in the front along University Avenue to somewhere in the rear of the property. The item was placed on the Consent Agenda and approved with the change to the site plan and as recommended by staff. The vote was 10 ayes, 0 nays and 1 absent. 4