Loading...
HomeMy WebLinkAboutZ-4029-A Map 20 1 c PHASE \ \ NEW WEST CLASSROOM PHASE I EI IST .RENCH DRAln$ORa N v \ O I EKSf CON' WA:[,CI-W, l MCDIFYfND EVERGREEN STREET I PH I -CONTRACTOR STAGEING & PARKING PHASE I: WORK THIS AREA TO COMMCE UPON CONTRACT AWARD AND IS TO BE GRADED AS NOTED ON THE GRADING PLAN. THE CONTRACTOR IS TO ERECT AND MAINTAIN A 5-0' H. CHAIN LINK FENCE WITH GATES IN AREAS CONTAINING STORED MATERIALS AND CONTRACTOR'S TRAILORS, OR HAZARDOUS MATERIALS \ 7MAIN G AREA TEMPORRIVE DURING PHASE IIION, COMPA,O ASPHALT DURING CONSTRUCTION NORTH EDGE EXIST ASPHALT DRIVE -� I PH 111 STAGING AREA PH III -CONTRACTOR STAGEING & PARKING PHASE III: CONTRACTOR IS TO CREATE A TEMPORARY MAIN DRIVE FOR BUS TRAFFIC AND RE -LOCATE THE NORTH STAGEING AREA ONCE THE EXISTING NORTH CLASSROOM BUILDING HAS BEEN DEMOLISHED, THE CONTRACTOR IS TO ERECT AND MAINTAIN A CHAIN LINK FENCE AS NOTED FOR PHASE I s NEW NORTH CLASSROOM BUILDING / MAIN FINISH FLOOR ELEVATION 483.12 CC ��/ SOUTH ENTRY ELEVATION 481.07 NEW PROMENADE 4--a PHASE 111 & IV -�-4 Q i ADDITION PHASE PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007 CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007 PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007 BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008 PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008 IONDATE:07AUG2008 NEWPROMENADE COMPLETION \\ \\\\v GENERAL CONSTRUCTION: GENERAL CONIFRUCTION: GENERAL CONSTRUCTION: GENERAL CONSTRUCTION: S$'" '4;..;Y i`FA(J %'vr'ixf ii` f y�f'fAft\1f k✓ wvn'n f(Il) COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING, 'tl....... A .:��){31)!)tly.. ?•il TV%%T$fil� r ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING IV REMODELED TO THE EXTENT INDICATED 1 rc xA DEMOLITION: f,tju To- ni Y.;��bzM/un9n fy it �. DEMOLITION: DEMOLITION: REMAINING LANDSCAPING DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION EXISTING MUSIC IG GYN DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS CLASSROOM BUILDING I UPPER LOBBY YEAR TEMP. UTILITIES OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR t ..f GYM FLOOR PHASE a F PLAN OF PHASED CONSTRUCTION NORTH V-30'4' EXISTING 1 ­1CAI ..,...,,:,,-' _ FINISH FLOOR %E�W PLAZA V n ED -7 7,777/7 7 77 EXISTING CLASSROOM BUIILDING FINISH FLOOR ELEVATION SHUT DOWN PROCEDURES 1. THE CONTRACTOR IS TO NOTIFY THE OWNER WELL IN ADVANCE OF TAKING ANY UTILITY OUT OF SERVICE 2. UNDER NO CIRCUMSTANCES ARE UTILITIES TO BE SHUT DOWN WHEN THE BUILDING IS OCCUPIED 3. UTILITY SHUT DOWNS ARE TO BE SCHEDULED AFTER SCHOOL HOURS, ON WEEKEND OR HOLIDAYS WHEN THE SCHOOL IS CLOSED PROJECT LIMIT -SITE WORK SOUTHLRN EXTENT OF WORK OF GENERAL CONTRACT EXCEPT FOR THE FOLLOWING, WHICH IS A PART OF THE WORK OF THE GENERAL CONTRACTOR 1. WORK ASSOCIATED WITH UTILITY RELOCACTIONS, ABANDONMENTS, EXTENSIONS OR AS MAY BE REQUIRED THE CONTRACT DOCUMENTS 2. WORK REQUIRED FOR THE CONTINUITY OF OPERATION OF ALL UTILITIES 3. WORK ASSOCIATED WITH THE PATCHING BACK OF EXTERIOR WALLS AT THE GYMNASIUM SUBSEQUENT TO DEMOLITION OF THE EXISTING SOUTH CLASSROOM BUILDING ON SITE DIRT HOLDING AREA THE OWNER WILL DESIGNATE A PORTION OF THE EAST PARKING LOT FOR USE BY THE CONTRACTOR FOR THE STORAGE OF EXCESS DIRT FROM THE EXCVATION OF THE NEW BUILDINGS, THE SOILS WILL BE USED IN LATER WORK FOR LAND SHAPING AND COMPACTED FILL (WHEN APPROVED BY THE SOILS ENGINEER CONTRACTOR STAGEING & PARKING THE OWNER WILL DESIGNATE PORTION OF THE EAST PARKING LOT FOR USE BY THE CONTRACTOR FOR THE STORAGE OF MATERIALS THROUGOUT THE CONSTRUCTION PERIOD. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE THE STAGING AREA PHASE I -WEST CLASSROOM BUILDING START DATE: AUG 2006 COMPLETION DATE: 05 MAY 2007 PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007 CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007 PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007 BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008 PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008 IONDATE:07AUG2008 NEWPROMENADE COMPLETION \\ \\\\v GENERAL CONSTRUCTION: GENERAL CONIFRUCTION: GENERAL CONSTRUCTION: GENERAL CONSTRUCTION: S$'" '4;..;Y Afi9\^.4b'Viv 4 2.T'MdiS'�xlAi➢HYn,Nr)3bA.'F'tQ'I0.'xi. 1 r'"R4k".4✓'2�`4`34'ti'P,.s'R�IkvY,r24?<!'»"7F$'£)i`;itntgll�. COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING, ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW PROMENADE, PLAZA AND GYMNASIUM ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING REMODELED CAFETERIA BUILDING, AND CONNECTING C/NOPIES REMODELED TO THE EXTENT INDICATED WALL SUBSEQUENT TO THE DEMOLITION OF THE SOUTH CLASSROOM BUILDING AND CANOPIES. COMPLETION OF DEMOLITION: f,tju To- ni Y.;��bzM/un9n fy it �. DEMOLITION: DEMOLITION: REMAINING LANDSCAPING DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION COMMENCETTMPORARY UTILITIES AS NEEDED TO ALL BUILDINGS TO BE OCCUPIED DURING THE 2008-2009 SCHOOL WORK ASSOCIATED WITH NEW CONSTRUCTION AND REMJDEL OF CAFETERIA BUILDING DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS DEMOLITION: YEAR TEMP. UTILITIES OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR DEMOLITION OF REMAINING EXISTING CANOPIES ON FAST SIDE OF GYM, REGULATED AMOUNTS OF ASBESTOS STAGING AREA: NORTH OF EXIST CURB LINE OF EXISTING MAIN DRIVE AND A PORTION OF THE EAST PARKING LOT ALONG THE NORTH WORK BY OTHELS-ASBESTOS ABATEMENT & BUILDING DEMOLITION MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS TO DEMOLITON OF CANOPIES CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN. ROOFING MATERIALS AND MUST BE ABATED PRIOR TO iA­ DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDING BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE TEMP. UTILITIES DEMOLITON OF CANOPIES STAGING AREA RESPONSIBLE DSCONNECTING ALL EXISTING BUILDING UTILITIES. LRSD WILL SALVAGE DESIRED ITEMS ASBESTOS ABATEMENT & BUILDING DEMOLITION MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS AS NEEDED TEMP. UTILITIES SCHEDULING: STAGING AREA DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDIIG BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE RESPONSIBLE DISCONNECTING ALL EXISTING BUILDING UILITIES. LRSD WILL SALVAGE DESIRED EQUIPMENT ASBESTOS ABATEMENT & BUILDING DEMOLITION REMOVE TEMP UTILITIES SERVING SOUTH CLASSROOM BUILDING AND OTHER LOCATIONS FROM SITE WHEN EXPOSED WORK ON THE NORTH STAGING AREA AND NORTH NEW NORTH GAS LINE IS TO COMMENCE UPON CONTRACT UNCHANGED FROM PHASE i UNTIL EXIST BUILDING REMOVED, THEN STAGING AREA MOVES SOUTH, INCLUDING ASBESTOS ABATEMENT OF GYMNASIUM ROOF AND CANOPY ROOFING W ILL BE BY OTHERS AND MUST BE WORK BY OTHERS AWARD AND BE COMPLETED PRIOR TO COMMENCEMENT OF WORK ON THE NEW WEST CLASSROOM BUILDING FENCING AND GATES STAGING AREA: COMPLETED PRIOR TO INSTALLATION OF THE NEW ROOF OR DEMOLITION OF THE CANOPIES ABATEMENT OF ASBESTON ON CANOPY ROOFING AND RE -ROOFING OF PORTIONS OF UPPER AND SOUTHERN REWORK PHASE I STAGEING AREA AS NEEDED TO CONVE:T TO TEMPORARY MAIN DRIVE FOR BUS TRAFFIC, ERECT GYMNASIUM ROOFING SCHEDULING: 5'-0' H. CHAIN LINK FENCE ON SOUTH SIDE OF NEW TEMP.>RIVE AROUND PHASE III STAGING AREA STAGING AREA: DEMOLRON OFTHE EXISTING NORTH CLASSROOM BUILDING CANNOT COMMENCE UNTIL 60 DAYS AFTER EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER STAGING AREA: SUBSTANTIAL COMPLETION OF THE WEST CLASSROOM BUILDING SCHEDULING: WORK ON THE CAFETERIA BUILDING MUST BE COMPLETEDDURING THE SUMMER WHEN NO STUDENTS ARE ON SCHEDULING: f I t +PIv:I�+IAFb:4 N1 Y DEMOLITION, WORK ON THE GYMNASIUM & PROMENADE MUST BE COMPLETED BY 07 AUG 2008 SCHEDULING: DEMOLITION, WORK ON THE GYMNASIUM & WORK ON THE PROMENADE MUST BE COMPLETED BY 07 AUG 2008 02006 THE BORNE FIRM ARCHITECTS P.A. 1 1 ) � 1 ! A rn 1 n f \ ( Y✓ f 1 v.. I t ( i a F PLAN OF PHASED CONSTRUCTION NORTH V-30'4' EXISTING 1 ­1CAI ..,...,,:,,-' _ FINISH FLOOR %E�W PLAZA V n ED -7 7,777/7 7 77 EXISTING CLASSROOM BUIILDING FINISH FLOOR ELEVATION SHUT DOWN PROCEDURES 1. THE CONTRACTOR IS TO NOTIFY THE OWNER WELL IN ADVANCE OF TAKING ANY UTILITY OUT OF SERVICE 2. UNDER NO CIRCUMSTANCES ARE UTILITIES TO BE SHUT DOWN WHEN THE BUILDING IS OCCUPIED 3. UTILITY SHUT DOWNS ARE TO BE SCHEDULED AFTER SCHOOL HOURS, ON WEEKEND OR HOLIDAYS WHEN THE SCHOOL IS CLOSED PROJECT LIMIT -SITE WORK SOUTHLRN EXTENT OF WORK OF GENERAL CONTRACT EXCEPT FOR THE FOLLOWING, WHICH IS A PART OF THE WORK OF THE GENERAL CONTRACTOR 1. WORK ASSOCIATED WITH UTILITY RELOCACTIONS, ABANDONMENTS, EXTENSIONS OR AS MAY BE REQUIRED THE CONTRACT DOCUMENTS 2. WORK REQUIRED FOR THE CONTINUITY OF OPERATION OF ALL UTILITIES 3. WORK ASSOCIATED WITH THE PATCHING BACK OF EXTERIOR WALLS AT THE GYMNASIUM SUBSEQUENT TO DEMOLITION OF THE EXISTING SOUTH CLASSROOM BUILDING ON SITE DIRT HOLDING AREA THE OWNER WILL DESIGNATE A PORTION OF THE EAST PARKING LOT FOR USE BY THE CONTRACTOR FOR THE STORAGE OF EXCESS DIRT FROM THE EXCVATION OF THE NEW BUILDINGS, THE SOILS WILL BE USED IN LATER WORK FOR LAND SHAPING AND COMPACTED FILL (WHEN APPROVED BY THE SOILS ENGINEER CONTRACTOR STAGEING & PARKING THE OWNER WILL DESIGNATE PORTION OF THE EAST PARKING LOT FOR USE BY THE CONTRACTOR FOR THE STORAGE OF MATERIALS THROUGOUT THE CONSTRUCTION PERIOD. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE THE STAGING AREA PHASE I -WEST CLASSROOM BUILDING START DATE: AUG 2006 COMPLETION DATE: 05 MAY 2007 PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007 CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007 PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007 BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008 PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008 IONDATE:07AUG2008 NEWPROMENADE COMPLETION PHASE V - DEMO. EXIST SOUTH. CLASSRM START DATE: 07 SEP COMPLETION DATE: 070NOV20D8 BLDG 8L PROJECT COMPLETION GENERAL CONSTRUCTION: GENERAL CONIFRUCTION: GENERAL CONSTRUCTION: GENERAL CONSTRUCTION: GENERAL CONSTRUCTION: ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW WEST CLASSROOM BUILDING & NEW COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING, ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW PROMENADE, PLAZA AND GYMNASIUM ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING REMODELED CAFETERIA BUILDING, AND CONNECTING C/NOPIES REMODELED TO THE EXTENT INDICATED WALL SUBSEQUENT TO THE DEMOLITION OF THE SOUTH CLASSROOM BUILDING AND CANOPIES. COMPLETION OF DEMOLITION: TEMP. UTILITIES DEMOLITION: DEMOLITION: REMAINING LANDSCAPING DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION COMMENCETTMPORARY UTILITIES AS NEEDED TO ALL BUILDINGS TO BE OCCUPIED DURING THE 2008-2009 SCHOOL WORK ASSOCIATED WITH NEW CONSTRUCTION AND REMJDEL OF CAFETERIA BUILDING DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS DEMOLITION: YEAR TEMP. UTILITIES OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR DEMOLITION OF REMAINING EXISTING CANOPIES ON FAST SIDE OF GYM, REGULATED AMOUNTS OF ASBESTOS STAGING AREA: NORTH OF EXIST CURB LINE OF EXISTING MAIN DRIVE AND A PORTION OF THE EAST PARKING LOT ALONG THE NORTH WORK BY OTHELS-ASBESTOS ABATEMENT & BUILDING DEMOLITION MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS TO DEMOLITON OF CANOPIES CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN. ROOFING MATERIALS AND MUST BE ABATED PRIOR TO EDGE, ERECT AND MAINTAIN A 5'-0" CHAIN LINK FENCE W/ LOCKABLE GATES AT THE PERIMETER OF THE NORTH DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDING BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE TEMP. UTILITIES DEMOLITON OF CANOPIES STAGING AREA RESPONSIBLE DSCONNECTING ALL EXISTING BUILDING UTILITIES. LRSD WILL SALVAGE DESIRED ITEMS ASBESTOS ABATEMENT & BUILDING DEMOLITION MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS AS NEEDED TEMP. UTILITIES SCHEDULING: STAGING AREA DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDIIG BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE RESPONSIBLE DISCONNECTING ALL EXISTING BUILDING UILITIES. LRSD WILL SALVAGE DESIRED EQUIPMENT ASBESTOS ABATEMENT & BUILDING DEMOLITION REMOVE TEMP UTILITIES SERVING SOUTH CLASSROOM BUILDING AND OTHER LOCATIONS FROM SITE WHEN EXPOSED WORK ON THE NORTH STAGING AREA AND NORTH NEW NORTH GAS LINE IS TO COMMENCE UPON CONTRACT UNCHANGED FROM PHASE i UNTIL EXIST BUILDING REMOVED, THEN STAGING AREA MOVES SOUTH, INCLUDING ASBESTOS ABATEMENT OF GYMNASIUM ROOF AND CANOPY ROOFING W ILL BE BY OTHERS AND MUST BE WORK BY OTHERS AWARD AND BE COMPLETED PRIOR TO COMMENCEMENT OF WORK ON THE NEW WEST CLASSROOM BUILDING FENCING AND GATES STAGING AREA: COMPLETED PRIOR TO INSTALLATION OF THE NEW ROOF OR DEMOLITION OF THE CANOPIES ABATEMENT OF ASBESTON ON CANOPY ROOFING AND RE -ROOFING OF PORTIONS OF UPPER AND SOUTHERN REWORK PHASE I STAGEING AREA AS NEEDED TO CONVE:T TO TEMPORARY MAIN DRIVE FOR BUS TRAFFIC, ERECT GYMNASIUM ROOFING SCHEDULING: 5'-0' H. CHAIN LINK FENCE ON SOUTH SIDE OF NEW TEMP.>RIVE AROUND PHASE III STAGING AREA STAGING AREA: DEMOLRON OFTHE EXISTING NORTH CLASSROOM BUILDING CANNOT COMMENCE UNTIL 60 DAYS AFTER EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER STAGING AREA: SUBSTANTIAL COMPLETION OF THE WEST CLASSROOM BUILDING SCHEDULING: WORK ON THE CAFETERIA BUILDING MUST BE COMPLETEDDURING THE SUMMER WHEN NO STUDENTS ARE ON SCHEDULING: EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER CAMPUS, ALL WORK MUST BE COMPLETED BY 07 JUL 2008 DEMOLITION, WORK ON THE GYMNASIUM & PROMENADE MUST BE COMPLETED BY 07 AUG 2008 SCHEDULING: DEMOLITION, WORK ON THE GYMNASIUM & WORK ON THE PROMENADE MUST BE COMPLETED BY 07 AUG 2008 02006 THE BORNE FIRM ARCHITECTS P.A. FINAL REVIEW DOCUMENT NOT FOR CONSTRUCTION USE THE BORNE FIRM PROJECT TITLE ADDITIONS & RENOVATIONS TO FOREST HEIGHTS MIDDLE SCHOOL LITTLE ROCK SCHOOL DISTRICT LITTLE ROCK, ARKANSAS DRAWING TITLE DATE DRAWING NO. 15 MAY 2006 PHASING PLAN TBF PROJECT NO 4� �jf n 4 JL 05-104 ^ _ 1 . A ARCHITECTS P.A. A r SUITE 3^ 2601 KA VANAUGH BOULEVARD LITTLE ROCK, AR 72205 501 663-5884 PROJECT TITLE ADDITIONS & RENOVATIONS TO FOREST HEIGHTS MIDDLE SCHOOL LITTLE ROCK SCHOOL DISTRICT LITTLE ROCK, ARKANSAS DRAWING TITLE DATE DRAWING NO. 15 MAY 2006 PHASING PLAN TBF PROJECT NO 4� �jf n 4 JL 05-104 ^ _ 1 . A