HomeMy WebLinkAboutZ-4029-A Map 20 1
c
PHASE \ \
NEW WEST CLASSROOM
PHASE I
EI IST .RENCH
DRAln$ORa N
v
\ O
I
EKSf CON'
WA:[,CI-W, l
MCDIFYfND
EVERGREEN STREET
I
PH I -CONTRACTOR STAGEING & PARKING
PHASE I: WORK THIS AREA TO COMMCE UPON
CONTRACT AWARD AND IS TO BE GRADED AS
NOTED ON THE GRADING PLAN. THE
CONTRACTOR IS TO ERECT AND MAINTAIN A 5-0'
H. CHAIN LINK FENCE WITH GATES IN AREAS
CONTAINING STORED MATERIALS AND
CONTRACTOR'S TRAILORS, OR HAZARDOUS
MATERIALS
\ 7MAIN
G AREA
TEMPORRIVE DURING
PHASE IIION,
COMPA,O ASPHALT
DURING CONSTRUCTION
NORTH EDGE EXIST ASPHALT DRIVE -�
I PH 111 STAGING AREA
PH III -CONTRACTOR STAGEING & PARKING
PHASE III: CONTRACTOR IS TO CREATE A TEMPORARY
MAIN DRIVE FOR BUS TRAFFIC AND RE -LOCATE THE
NORTH STAGEING AREA ONCE THE EXISTING NORTH
CLASSROOM BUILDING HAS BEEN DEMOLISHED, THE
CONTRACTOR IS TO ERECT AND MAINTAIN A CHAIN
LINK FENCE AS NOTED FOR PHASE I
s
NEW NORTH CLASSROOM BUILDING
/ MAIN FINISH FLOOR ELEVATION 483.12 CC
��/ SOUTH ENTRY ELEVATION 481.07
NEW PROMENADE
4--a PHASE 111 & IV -�-4
Q
i
ADDITION
PHASE
PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007
CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007
PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007
BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008
PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008
IONDATE:07AUG2008
NEWPROMENADE COMPLETION
\\
\\\\v
GENERAL CONSTRUCTION:
GENERAL CONIFRUCTION:
GENERAL CONSTRUCTION:
GENERAL CONSTRUCTION:
S$'"
'4;..;Y
i`FA(J %'vr'ixf ii` f y�f'fAft\1f k✓ wvn'n f(Il)
COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING,
'tl.......
A .:��){31)!)tly.. ?•il TV%%T$fil� r
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM
CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING
LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING
IV
REMODELED TO THE EXTENT INDICATED
1 rc xA
DEMOLITION:
f,tju To- ni Y.;��bzM/un9n fy it �.
DEMOLITION:
DEMOLITION:
REMAINING LANDSCAPING
DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION
EXISTING MUSIC
IG GYN
DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS
CLASSROOM BUILDING
I UPPER LOBBY
YEAR
TEMP. UTILITIES
OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR
t ..f GYM FLOOR
PHASE
a
F PLAN OF PHASED CONSTRUCTION NORTH
V-30'4'
EXISTING 1 1CAI
..,...,,:,,-' _ FINISH FLOOR
%E�W
PLAZA
V
n
ED
-7
7,777/7 7
77
EXISTING CLASSROOM BUIILDING
FINISH FLOOR ELEVATION
SHUT DOWN PROCEDURES
1. THE CONTRACTOR IS TO NOTIFY THE OWNER WELL IN ADVANCE OF
TAKING ANY UTILITY OUT OF SERVICE
2. UNDER NO CIRCUMSTANCES ARE UTILITIES TO BE SHUT DOWN WHEN
THE BUILDING IS OCCUPIED
3. UTILITY SHUT DOWNS ARE TO BE SCHEDULED AFTER SCHOOL HOURS,
ON WEEKEND OR HOLIDAYS WHEN THE SCHOOL IS CLOSED
PROJECT LIMIT -SITE WORK
SOUTHLRN EXTENT OF WORK OF GENERAL CONTRACT EXCEPT FOR THE FOLLOWING, WHICH
IS A PART OF THE WORK OF THE GENERAL CONTRACTOR
1. WORK ASSOCIATED WITH UTILITY RELOCACTIONS, ABANDONMENTS, EXTENSIONS OR AS MAY
BE REQUIRED THE CONTRACT DOCUMENTS
2. WORK REQUIRED FOR THE CONTINUITY OF OPERATION OF ALL UTILITIES
3. WORK ASSOCIATED WITH THE PATCHING BACK OF EXTERIOR WALLS AT THE GYMNASIUM
SUBSEQUENT TO DEMOLITION OF THE EXISTING SOUTH CLASSROOM BUILDING
ON SITE DIRT HOLDING AREA
THE OWNER WILL DESIGNATE A PORTION OF THE
EAST PARKING LOT FOR USE BY THE CONTRACTOR
FOR THE STORAGE OF EXCESS DIRT FROM THE
EXCVATION OF THE NEW BUILDINGS, THE SOILS
WILL BE USED IN LATER WORK FOR LAND SHAPING
AND COMPACTED FILL (WHEN APPROVED BY THE
SOILS ENGINEER
CONTRACTOR STAGEING & PARKING
THE OWNER WILL DESIGNATE PORTION OF THE
EAST PARKING LOT FOR USE BY THE CONTRACTOR
FOR THE STORAGE OF MATERIALS THROUGOUT
THE CONSTRUCTION PERIOD. IT WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO SECURE
THE STAGING AREA
PHASE I -WEST CLASSROOM BUILDING START DATE: AUG 2006
COMPLETION DATE: 05 MAY 2007
PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007
CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007
PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007
BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008
PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008
IONDATE:07AUG2008
NEWPROMENADE COMPLETION
\\
\\\\v
GENERAL CONSTRUCTION:
GENERAL CONIFRUCTION:
GENERAL CONSTRUCTION:
GENERAL CONSTRUCTION:
S$'"
'4;..;Y
Afi9\^.4b'Viv 4 2.T'MdiS'�xlAi➢HYn,Nr)3bA.'F'tQ'I0.'xi.
1 r'"R4k".4✓'2�`4`34'ti'P,.s'R�IkvY,r24?<!'»"7F$'£)i`;itntgll�.
COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING,
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW PROMENADE, PLAZA AND GYMNASIUM
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM
CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING
LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING
REMODELED CAFETERIA BUILDING, AND CONNECTING C/NOPIES
REMODELED TO THE EXTENT INDICATED
WALL SUBSEQUENT TO THE DEMOLITION OF THE SOUTH CLASSROOM BUILDING AND CANOPIES. COMPLETION OF
DEMOLITION:
f,tju To- ni Y.;��bzM/un9n fy it �.
DEMOLITION:
DEMOLITION:
REMAINING LANDSCAPING
DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION
COMMENCETTMPORARY UTILITIES AS NEEDED TO ALL BUILDINGS TO BE OCCUPIED DURING THE 2008-2009 SCHOOL
WORK ASSOCIATED WITH NEW CONSTRUCTION AND REMJDEL OF CAFETERIA BUILDING
DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS
DEMOLITION:
YEAR
TEMP. UTILITIES
OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR
DEMOLITION OF REMAINING EXISTING CANOPIES ON FAST SIDE OF GYM, REGULATED AMOUNTS OF ASBESTOS
STAGING AREA:
NORTH OF EXIST CURB LINE OF EXISTING MAIN DRIVE AND A PORTION OF THE EAST PARKING LOT ALONG THE NORTH
WORK BY OTHELS-ASBESTOS ABATEMENT & BUILDING DEMOLITION
MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS
TO DEMOLITON OF CANOPIES
CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN. ROOFING MATERIALS AND MUST BE ABATED PRIOR TO
iA
DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDING BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE
TEMP. UTILITIES
DEMOLITON OF CANOPIES
STAGING AREA
RESPONSIBLE DSCONNECTING ALL EXISTING BUILDING UTILITIES. LRSD WILL SALVAGE DESIRED ITEMS
ASBESTOS ABATEMENT & BUILDING DEMOLITION
MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS AS NEEDED
TEMP. UTILITIES
SCHEDULING:
STAGING AREA
DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDIIG BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE
RESPONSIBLE DISCONNECTING ALL EXISTING BUILDING UILITIES. LRSD WILL SALVAGE DESIRED EQUIPMENT
ASBESTOS ABATEMENT & BUILDING DEMOLITION
REMOVE TEMP UTILITIES SERVING SOUTH CLASSROOM BUILDING AND OTHER LOCATIONS FROM SITE WHEN EXPOSED
WORK ON THE NORTH STAGING AREA AND NORTH NEW NORTH GAS LINE IS TO COMMENCE UPON CONTRACT
UNCHANGED FROM PHASE i UNTIL EXIST BUILDING REMOVED, THEN STAGING AREA MOVES SOUTH, INCLUDING
ASBESTOS ABATEMENT OF GYMNASIUM ROOF AND CANOPY ROOFING W ILL BE BY OTHERS AND MUST BE
WORK BY OTHERS
AWARD AND BE COMPLETED PRIOR TO COMMENCEMENT OF WORK ON THE NEW WEST CLASSROOM BUILDING
FENCING AND GATES
STAGING AREA:
COMPLETED PRIOR TO INSTALLATION OF THE NEW ROOF OR DEMOLITION OF THE CANOPIES
ABATEMENT OF ASBESTON ON CANOPY ROOFING AND RE -ROOFING OF PORTIONS OF UPPER AND SOUTHERN
REWORK PHASE I STAGEING AREA AS NEEDED TO CONVE:T TO TEMPORARY MAIN DRIVE FOR BUS TRAFFIC, ERECT
GYMNASIUM ROOFING
SCHEDULING:
5'-0' H. CHAIN LINK FENCE ON SOUTH SIDE OF NEW TEMP.>RIVE AROUND PHASE III STAGING AREA
STAGING AREA:
DEMOLRON OFTHE EXISTING NORTH CLASSROOM BUILDING CANNOT COMMENCE UNTIL 60 DAYS AFTER
EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER
STAGING AREA:
SUBSTANTIAL COMPLETION OF THE WEST CLASSROOM BUILDING
SCHEDULING:
WORK ON THE CAFETERIA BUILDING MUST BE COMPLETEDDURING THE SUMMER WHEN NO STUDENTS ARE ON
SCHEDULING:
f I t
+PIv:I�+IAFb:4 N1 Y
DEMOLITION, WORK ON THE GYMNASIUM & PROMENADE MUST BE COMPLETED BY 07 AUG 2008
SCHEDULING:
DEMOLITION, WORK ON THE GYMNASIUM & WORK ON THE PROMENADE MUST BE COMPLETED BY 07 AUG 2008
02006 THE BORNE FIRM ARCHITECTS P.A.
1
1 ) �
1 ! A
rn
1
n
f
\
( Y✓ f 1 v..
I
t ( i
a
F PLAN OF PHASED CONSTRUCTION NORTH
V-30'4'
EXISTING 1 1CAI
..,...,,:,,-' _ FINISH FLOOR
%E�W
PLAZA
V
n
ED
-7
7,777/7 7
77
EXISTING CLASSROOM BUIILDING
FINISH FLOOR ELEVATION
SHUT DOWN PROCEDURES
1. THE CONTRACTOR IS TO NOTIFY THE OWNER WELL IN ADVANCE OF
TAKING ANY UTILITY OUT OF SERVICE
2. UNDER NO CIRCUMSTANCES ARE UTILITIES TO BE SHUT DOWN WHEN
THE BUILDING IS OCCUPIED
3. UTILITY SHUT DOWNS ARE TO BE SCHEDULED AFTER SCHOOL HOURS,
ON WEEKEND OR HOLIDAYS WHEN THE SCHOOL IS CLOSED
PROJECT LIMIT -SITE WORK
SOUTHLRN EXTENT OF WORK OF GENERAL CONTRACT EXCEPT FOR THE FOLLOWING, WHICH
IS A PART OF THE WORK OF THE GENERAL CONTRACTOR
1. WORK ASSOCIATED WITH UTILITY RELOCACTIONS, ABANDONMENTS, EXTENSIONS OR AS MAY
BE REQUIRED THE CONTRACT DOCUMENTS
2. WORK REQUIRED FOR THE CONTINUITY OF OPERATION OF ALL UTILITIES
3. WORK ASSOCIATED WITH THE PATCHING BACK OF EXTERIOR WALLS AT THE GYMNASIUM
SUBSEQUENT TO DEMOLITION OF THE EXISTING SOUTH CLASSROOM BUILDING
ON SITE DIRT HOLDING AREA
THE OWNER WILL DESIGNATE A PORTION OF THE
EAST PARKING LOT FOR USE BY THE CONTRACTOR
FOR THE STORAGE OF EXCESS DIRT FROM THE
EXCVATION OF THE NEW BUILDINGS, THE SOILS
WILL BE USED IN LATER WORK FOR LAND SHAPING
AND COMPACTED FILL (WHEN APPROVED BY THE
SOILS ENGINEER
CONTRACTOR STAGEING & PARKING
THE OWNER WILL DESIGNATE PORTION OF THE
EAST PARKING LOT FOR USE BY THE CONTRACTOR
FOR THE STORAGE OF MATERIALS THROUGOUT
THE CONSTRUCTION PERIOD. IT WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO SECURE
THE STAGING AREA
PHASE I -WEST CLASSROOM BUILDING START DATE: AUG 2006
COMPLETION DATE: 05 MAY 2007
PHASE II -DEMOLITION OF EXIST NORTH START DATE: 07JUL 2007
CLASSROOM BUILDING COMPLTIONDATE: 07AUG 2007
PHASE III -NEW NORTH CLASSZOOM START DATE: 07JUL 2007
BUILDING & CAFETERIA UPGRADE COMPLETION DATE: 07JUL 2008
PHASE IV -GYMNASIUM REMODEL & START DATE: 07 JUN 2008
IONDATE:07AUG2008
NEWPROMENADE COMPLETION
PHASE V - DEMO. EXIST SOUTH. CLASSRM START DATE: 07 SEP
COMPLETION DATE: 070NOV20D8
BLDG 8L PROJECT COMPLETION
GENERAL CONSTRUCTION:
GENERAL CONIFRUCTION:
GENERAL CONSTRUCTION:
GENERAL CONSTRUCTION:
GENERAL CONSTRUCTION:
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW WEST CLASSROOM BUILDING & NEW
COMMENCE UftL1TY WORK OUTSIDE THE DEMOLITION AREA, INCLUDING NEW SOUTH GAS LINE &NEW EAST WATER
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLIFUNCTIONAL NEW NORTH CLASSROOM BUILDING,
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR A FULLY FUNCTIONAL NEW PROMENADE, PLAZA AND GYMNASIUM
ALL BUILDING, SITE & UTILITY WORK REQUIRED FOR THE NEW PLAZA AND THE RESTORATION OF THE EAST GYMNASIUM
CONNECTING CANOPY TO EXISTING ADMIN/CLASSROOM BUILDING
LINE. COMMDtE RE -MODEL WORK IN ADMIN/CLASSROOM BUILDING
REMODELED CAFETERIA BUILDING, AND CONNECTING C/NOPIES
REMODELED TO THE EXTENT INDICATED
WALL SUBSEQUENT TO THE DEMOLITION OF THE SOUTH CLASSROOM BUILDING AND CANOPIES. COMPLETION OF
DEMOLITION:
TEMP. UTILITIES
DEMOLITION:
DEMOLITION:
REMAINING LANDSCAPING
DEMOLITION/EXCAVATION REQUIRED FOR GENERAL CONSTRUCTION
COMMENCETTMPORARY UTILITIES AS NEEDED TO ALL BUILDINGS TO BE OCCUPIED DURING THE 2008-2009 SCHOOL
WORK ASSOCIATED WITH NEW CONSTRUCTION AND REMJDEL OF CAFETERIA BUILDING
DEMOLITION OF REMAINING EXISTING CANOPIES AT THE NORTH EDGE OF THE GYMNASIUM, REGULATED AMOUNTS
DEMOLITION:
YEAR
TEMP. UTILITIES
OF ASBESTOS CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN ROOFING MATERIALS AND MUST BE ABATED PRIOR
DEMOLITION OF REMAINING EXISTING CANOPIES ON FAST SIDE OF GYM, REGULATED AMOUNTS OF ASBESTOS
STAGING AREA:
NORTH OF EXIST CURB LINE OF EXISTING MAIN DRIVE AND A PORTION OF THE EAST PARKING LOT ALONG THE NORTH
WORK BY OTHELS-ASBESTOS ABATEMENT & BUILDING DEMOLITION
MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS
TO DEMOLITON OF CANOPIES
CONTAINING MATERIALS HAVE BEEN IDENTIFIED IN. ROOFING MATERIALS AND MUST BE ABATED PRIOR TO
EDGE, ERECT AND MAINTAIN A 5'-0" CHAIN LINK FENCE W/ LOCKABLE GATES AT THE PERIMETER OF THE NORTH
DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDING BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE
TEMP. UTILITIES
DEMOLITON OF CANOPIES
STAGING AREA
RESPONSIBLE DSCONNECTING ALL EXISTING BUILDING UTILITIES. LRSD WILL SALVAGE DESIRED ITEMS
ASBESTOS ABATEMENT & BUILDING DEMOLITION
MAINTAIN TEMP UTILITIES TO ALL OCCUPIED BUILDINGS AS NEEDED
TEMP. UTILITIES
SCHEDULING:
STAGING AREA
DEMOLITION OF THE EXISTING NORTH CLASSROOM BUILDIIG BY OTHERS. THE DEMOLITION CONTRACTOR WILL BE
RESPONSIBLE DISCONNECTING ALL EXISTING BUILDING UILITIES. LRSD WILL SALVAGE DESIRED EQUIPMENT
ASBESTOS ABATEMENT & BUILDING DEMOLITION
REMOVE TEMP UTILITIES SERVING SOUTH CLASSROOM BUILDING AND OTHER LOCATIONS FROM SITE WHEN EXPOSED
WORK ON THE NORTH STAGING AREA AND NORTH NEW NORTH GAS LINE IS TO COMMENCE UPON CONTRACT
UNCHANGED FROM PHASE i UNTIL EXIST BUILDING REMOVED, THEN STAGING AREA MOVES SOUTH, INCLUDING
ASBESTOS ABATEMENT OF GYMNASIUM ROOF AND CANOPY ROOFING W ILL BE BY OTHERS AND MUST BE
WORK BY OTHERS
AWARD AND BE COMPLETED PRIOR TO COMMENCEMENT OF WORK ON THE NEW WEST CLASSROOM BUILDING
FENCING AND GATES
STAGING AREA:
COMPLETED PRIOR TO INSTALLATION OF THE NEW ROOF OR DEMOLITION OF THE CANOPIES
ABATEMENT OF ASBESTON ON CANOPY ROOFING AND RE -ROOFING OF PORTIONS OF UPPER AND SOUTHERN
REWORK PHASE I STAGEING AREA AS NEEDED TO CONVE:T TO TEMPORARY MAIN DRIVE FOR BUS TRAFFIC, ERECT
GYMNASIUM ROOFING
SCHEDULING:
5'-0' H. CHAIN LINK FENCE ON SOUTH SIDE OF NEW TEMP.>RIVE AROUND PHASE III STAGING AREA
STAGING AREA:
DEMOLRON OFTHE EXISTING NORTH CLASSROOM BUILDING CANNOT COMMENCE UNTIL 60 DAYS AFTER
EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER
STAGING AREA:
SUBSTANTIAL COMPLETION OF THE WEST CLASSROOM BUILDING
SCHEDULING:
WORK ON THE CAFETERIA BUILDING MUST BE COMPLETEDDURING THE SUMMER WHEN NO STUDENTS ARE ON
SCHEDULING:
EAST OF THE GYMNASIUM AT A LOCATION DIRECTED BY THE OWNER
CAMPUS, ALL WORK MUST BE COMPLETED BY 07 JUL 2008
DEMOLITION, WORK ON THE GYMNASIUM & PROMENADE MUST BE COMPLETED BY 07 AUG 2008
SCHEDULING:
DEMOLITION, WORK ON THE GYMNASIUM & WORK ON THE PROMENADE MUST BE COMPLETED BY 07 AUG 2008
02006 THE BORNE FIRM ARCHITECTS P.A.
FINAL REVIEW DOCUMENT
NOT FOR CONSTRUCTION USE
THE BORNE FIRM
PROJECT TITLE
ADDITIONS & RENOVATIONS
TO FOREST HEIGHTS MIDDLE SCHOOL
LITTLE ROCK SCHOOL DISTRICT
LITTLE ROCK, ARKANSAS
DRAWING TITLE DATE DRAWING NO.
15 MAY 2006
PHASING PLAN TBF PROJECT NO
4� �jf n 4 JL
05-104 ^ _ 1 .
A
ARCHITECTS P.A.
A r
SUITE
3^
2601 KA VANAUGH BOULEVARD
LITTLE ROCK, AR 72205
501 663-5884
PROJECT TITLE
ADDITIONS & RENOVATIONS
TO FOREST HEIGHTS MIDDLE SCHOOL
LITTLE ROCK SCHOOL DISTRICT
LITTLE ROCK, ARKANSAS
DRAWING TITLE DATE DRAWING NO.
15 MAY 2006
PHASING PLAN TBF PROJECT NO
4� �jf n 4 JL
05-104 ^ _ 1 .
A